ICC E1 flashcards
ICC E1 · Build recall with a focused review session.
31 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Working clearance depth
- At equipment operating at 0-150 volts to ground, the minimum clear working space in front is 36 inches; 151-600 volts requires 42 inches where the opposite wall is grounded.
- Dedicated equipment space
- The zone above switchboards, panelboards, and motor control centers up to 6 feet, and the footprint depth, is reserved for electrical equipment only; no piping or ducts allowed.
- Main bonding jumper
- The connection between the grounded service conductor and the equipment grounding conductor at the service; it ensures a low-impedance fault path and is removed only for separately derived systems.
- Equipment grounding conductor sizing
- Table 250.122 sizes the equipment grounding conductor from the rating of the overcurrent device protecting the circuit, not from the conductor ampacity.
- Ampacity correction factors
- Conductor ampacity from the tables is multiplied by ambient temperature correction and conduit fill adjustment factors before comparing to the overcurrent device rating.
- Next standard OCPD size
- Where the conductor ampacity does not match a standard fuse or breaker rating, the next higher standard rating may be used if it does not exceed 800 amperes and certain limits are met.
- Service disconnect location
- The service disconnecting means must be installed at a readily accessible location nearest the point of entry of the service conductors, either outside or inside nearest the entry.
- Receptacle outlet spacing
- In dwelling units, receptacle outlets must be installed so that no point along the floor line is more than 6 feet from a receptacle in the specified wall spaces.
- Plan review scope
- Review confirms load calculations, service and feeder sizing, conductor and overcurrent protection coordination, grounding electrode system, and required clearances before a permit is issued.
- Rough-in inspection
- Performed after framing and wiring but before concealment; verifies box fill, cable support, drilling protection, and grounding before walls are closed.
- Dwelling general lighting load
- Three volt-amperes per square foot of floor area for general lighting, plus 1,500 VA each for the two small-appliance and one laundry branch circuits.
- Optional calculation method
- Article 220 Part IV applies demand factors to general loads and uses the larger of heating or cooling, often yielding a smaller service than the standard method.
- Correction notice content
- A written notice identifies the specific code section violated, describes the observed condition, and states what must be corrected before re-inspection.
- Approved plans on site
- The approved set must be available at the job site for the inspector; field changes require documented approval before the work is concealed.
- Certificate of occupancy
- Issued after a passed final inspection; it confirms the electrical installation complies with the approved plans and the adopted code edition.
- Temporary construction power
- Temporary service must still have grounding, overcurrent protection, and GFCI protection for receptacles; it is inspected like permanent work.
- NM cable ampacity limit
- Nonmetallic-sheathed cable conductors are limited to the 60°C ampacity column regardless of the conductor insulation rating, per 334.80.
- Box fill counting
- Each 14 AWG conductor counts 2.00 cubic inches, 12 AWG 2.25, and 10 AWG 2.50; add one count per device yoke, clamp, and grounding conductor.
- Raceway fill percentages
- Conduit interior area may be filled to 53 percent for one conductor, 31 percent for two, and 40 percent for three or more conductors.
- NM cable support interval
- Nonmetallic-sheathed cable must be secured every 4.5 feet and within 12 inches of each box, with no more than 360 degrees of bends between pull points.
- Concrete-encased electrode
- A grounding electrode of at least 20 feet of bare copper conductor or reinforcing steel encased in concrete in direct contact with the earth.
- Ground ring electrode
- A ring of bare copper conductor at least 20 feet long, sized 2 AWG or larger, buried at least 30 inches below grade around the building.
- Wet location wiring
- Wet locations require listed wet-location fittings, gasketed boxes, and conductors rated for wet use such as THWN-2 or UF cable.
- Class 2 and line voltage
- Line-voltage and Class 2 or 3 conductors may not occupy the same box or raceway unless a listed barrier or the equipment listing separates them.
- Voltage tester verification
- Before touching conductors, confirm the tester on a known live source, test the circuit, then re-test the tester to prove it still functions.
- GFCI trip test
- A GFCI must trip when a tester simulates a ground fault and must also trip when the device's own test button is pressed, then reset normally.
- AFCI test button
- Arc-fault circuit interrupter breakers are verified by pressing the test button, which must trip the breaker; testers may not reliably trip all listed devices.
- Insulation resistance testing
- A megohmmeter measures insulation resistance; results are compared with manufacturer values and baselines and are diagnostic rather than a code pass criterion.
- Stop-work authority
- When work is unsafe or unpermitted, the inspector may order work stopped and must document the condition and notify the permit holder in writing.
- Bonding continuity check
- A low-resistance reading between the grounded conductor and the grounding terminal at the service confirms the main bonding jumper is installed and effective.
- Energization approval
- Exposed live parts, missing covers, or improper bonding must be corrected before the inspector approves energization or occupancy.