ICC Soils Inspector EC case studies
ICC Soils Inspector EC · Put your knowledge to work in context.
The ICC Soils Inspector credential is one of the certification exams administered within the International Code Council's credentialing program, which the Code Council describes as "one of the most historic and prestigious credentialing programs for construction codes and standards." It is aimed at code officials, inspectors, and technicians who evaluate and inspect soils in the field - verifying site and soil conditions, identifying and classifying soils, observing fill placement and compaction, and documenting and reporting results in accordance with adopted codes. Candidates typically encounter multiple-choice items spanning site and soil evaluation, soil classification and identification, compaction and field testing, and code administration, inspection, and reporting. The ICC Soils Inspector EC case studies are 5 cases and about 2,265 words.
1Siting a Replacement Absorption Field on a Sloping Lot
A single-family dwelling on a 0.6-acre lot has a failing septic system discharging to the surface downslope of the house. The lot slopes from north to south at roughly 12 percent.
556 words, about 3 min2Textural Class Disagreement Between Field and Lab
A designer submits a soil report classifying the infiltrative zone as a sandy loam based on a ribbon test and feel method. Your own field evaluation of the same horizon yields a noticeably finer feel, with a ribbon about 2 inches long that holds well and feels smooth and slightly sticky when wet.
429 words, about 2 min3Marginal Compaction Test on a Fill Pad
A builder has placed select granular fill in 8-inch lifts beneath a proposed slab-on-grade. The geotechnical technician reports a nuclear gauge reading of 96 percent of maximum dry density at 1.5 percent above optimum moisture, based on a standard Proctor.
390 words, about 2 min4Permit Scope Versus What Is Actually Built
A permit was issued for a conventional trench absorption field with three 60-foot trenches. During inspection you find the contractor has installed two 80-foot trenches and connected them to a distribution box intended for three laterals.
443 words, about 2 min5Documenting a Failed Inspection Under Pressure
You inspect a final grade and drainage package on a Friday afternoon. The lot drains toward the foundation on the north side, with visible ponding in a low spot within 6 feet of the foundation wall.
447 words, about 2 min