ICC S2 Welding study plan
ICC S2 Welding · Give each week a clear focus.
8 weeks · About 7 hours per week
Structural Steel Welding Inspection & Welding Processes and Procedure Qualification
Map the five exam domains against your current knowledge and rank your weakest three subtopics
Outline the welding symbol system: fillet, groove, plug, slot, and stud symbols plus tail, arrow, and reference line placement
Read the AISC Specification chapters covering general requirements, design of welded connections, and fabrication in one sitting, annotating clause numbers
Define 30 core terms (PJP, CJP, effective throat, prequalified joint, WPS, PQR, essential variable) in your own words with clause citations
Your checkpoint
A one-page domain map plus a 30-term glossary with clause citations for each term
Structural Steel Welding Inspection
Distinguish prequalified joints from joints requiring procedure qualification and list the conditions that void prequalification
Compute effective throat thickness and required weld size for fillet and PJP groove welds in several worked examples
Explain minimum and maximum weld size limits, minimum length rules, and end-return requirements for stiffeners and connections
Interpret a set of welding symbols on a structural detail and state the weld type, size, length, and process each one specifies
Your checkpoint
Ten solved weld-size and effective-throat calculations with clause references and a symbol interpretation log
Welding Processes and Procedure Qualification
List the essential variables of a WPS for SMAW, GMAW, and FCAW and explain how a change in each triggers requalification
Describe how a PQR is produced: test coupon, welding position, mechanical testing, and acceptance criteria
Compare prequalified WPS use against procedure qualification testing in terms of cost, lead time, and documentation
Explain the role of shielding gas, electrode classification, and current/polarity in procedure selection
Your checkpoint
A side-by-side comparison table of prequalified versus qualified WPS pathways with essential-variable columns
Welding Processes and Procedure Qualification & Welder Qualification and Performance Testing
Outline the welder performance qualification variables: process, position, thickness, joint type, and progression
Explain the difference between procedure qualification and performance qualification and who holds responsibility for each
Describe the visual and mechanical tests used for welder qualification coupons and their acceptance limits
State the conditions that require requalification of a welder and the conditions that allow continued qualification
Your checkpoint
A one-page welder qualification decision tree covering essential variables and requalification triggers
Welder Qualification and Performance Testing
Map welding positions (flat, horizontal, vertical, overhead) to their letter designations and test coupon requirements
Explain how thickness qualified ranges are derived from test coupon thickness and how that limits production welding
Describe qualification records: essential content, retention, and how to verify a welder's card against production work
Analyze case scenarios where a welder is assigned work outside their qualified range and identify the nonconformance
Your checkpoint
Five written scenario analyses identifying qualification gaps and the corrective action required
Welding Inspection and Nondestructive Examination
Sequence the inspection stages of a welded connection: fit-up, preheat verification, in-process, and final
Explain visual inspection criteria for undercut, porosity, overlap, crater cracks, and weld profile, with acceptance limits
Compare UT, RT, MT, and PT on the defects each detects, surface preparation, and typical application to structural welds
Interpret an NDT report: technique, coverage, acceptance standard, and disposition of indications
Your checkpoint
An inspection checklist for a complete welded connection plus a written interpretation of a sample NDT report
Structural Steel Bolting and Connection Inspection
Explain high-strength bolt grades, required pretension, and the methods used to verify tension (turn-of-nut, tension calibrator, direct tension indicator)
Describe the difference between snug-tight, pretensioned, and slip-critical connections and when each applies
Outline bolted connection inspection: hole size and alignment, faying surface preparation, and installation sequence
Identify common bolting nonconformances such as improper washer use, unverified pretension, and damaged threads
Your checkpoint
A bolted connection inspection worksheet covering pretension method, faying surface, and acceptance criteria
Structural Steel Welding Inspection & Welding Processes and Procedure Qualification & Welder Qualification and Performance Testing & Welding Inspection and Nondestructive Examination & Structural Steel Bolting and Connection Inspection
Revisit your weakest subtopics from week 1 and close each gap with a written explanation
Complete a full-length timed practice set across all five domains and score each domain separately
Review every missed question and write the underlying rule, not just the correct answer
Consolidate your glossary, checklists, and decision trees into a single review packet for exam day
Your checkpoint
A scored practice exam with a written error log and a consolidated final review packet
Milestones
Week 2: You can read any weld symbol on a structural detail and state weld type, size, length, and process without references
Week 4: You can explain the prequalified versus qualified WPS decision and the welder requalification triggers from memory
Week 6: You can name the NDT method appropriate for a given defect and state the acceptance disposition
Week 8: Practice exam domain scores show no domain below 70 percent and an overall score above the passing target