ID Plumber · Give each week a clear focus.
8 weeks · About 7 hours per week
Sanitary Drainage, Vents, and Storm Drainage & General Plumbing Regulations, Definitions, and Administration
Map the sanitary drainage and vent chapters of the adopted plumbing code, listing every table and section number you will need for slope, sizing, and venting before you study any of them
Define the code terms that control drainage design (fixture unit, drainage fixture unit, developed length, stack, branch, vent stack, stack vent, circuit vent) in your own words and cite the section for each
Explain the permit, inspection, and administrative sequence a plumber follows on a job, including who may perform work and what triggers a required inspection
Compute the correct slope and pipe size for three sample horizontal branches using drainage fixture unit tables, showing each step
Your checkpoint
A one-page drainage-and-venting reference sheet with the fixture unit table transcribed, slope rules summarized, and three worked sizing examples
Sanitary Drainage, Vents, and Storm Drainage
Size a building drain and building sewer from a fixture unit count, then verify against the code's minimum size and material rules
Lay out a complete venting system for a two-story house with two bathrooms, a kitchen, and a laundry, identifying each vent type used and the code basis for it
Identify the conditions that require a cleanout and specify spacing, size, and access requirements for each location
Calculate storm drainage flow for a given roof area and rainfall intensity and select an appropriate leader or conductor size
Diagnose five broken drainage or venting scenarios (missing vent, improper wet vent, back-graded branch, undersized drain, illegal fitting) and state the correction and code citation
Your checkpoint
A hand-drawn isometric drainage and venting layout for a two-bathroom house with every pipe labeled by size, slope, and vent type, plus a written correction list for the five broken scenarios
Water Supply and Distribution
Distinguish the fixture-unit method from the pressure-loss method and state when each is appropriate
Determine minimum pipe size, maximum developed length, and pressure requirements for a supply system serving a given fixture load
Select and size a water heater for a dwelling based on fixture count and first-hour rating, and identify the temperature and safety device requirements that apply
Identify the backflow protection required for each of six common cross-connection scenarios and cite the applicable rule
Size water service piping and the meter for a single-family dwelling using the fixture unit table and the demand curve
Your checkpoint
A water supply sizing worksheet for a single-family dwelling showing total fixture units, demand in gallons per minute, service size, meter size, and selected water heater with justification
Fixtures, Fixture Fittings, and Water Heaters & Traps, Interceptors, and Special Wastes
State the minimum fixture clearances, installation heights, and support requirements for water closets, lavatories, and bathtubs
Identify the trap requirements for each fixture type and explain the difference between a fixture trap, a drum trap prohibition, and a trap primer application
Select the correct interceptor for a commercial kitchen, a vehicle service bay, and a laundry, and state the sizing basis for each
Explain how indirect waste receptors, air gaps, and air breaks differ and where each is required
List the materials permitted for fixture fittings and the lead-free and temperature-limiting requirements that apply
Your checkpoint
A fixture and trap specification table covering eight fixture types with trap size, minimum clearance, and interceptor or special waste requirement for each
General Building and Plumbing Code Provisions & Indirect and Special Wastes; Gray Water and Reclaimed Water
Summarize the general building code provisions that affect plumbing work: occupancy classification, fire separation, structural penetrations, and shaft and chase requirements
Trace the requirements for gray water and reclaimed water from source through treatment, storage, and distribution, and list the labeling and cross-connection controls required
Explain the inspection and testing requirements for a rough-in, a water distribution system, and a drainage system, including the test pressures and durations
Determine when an indirect waste connection is required instead of a direct connection for five pieces of equipment
Identify the special waste streams (chemical, corrosive, dental, photographic, grease-laden) and the treatment or interception required for each
Your checkpoint
A two-page comparison chart of gray water, reclaimed water, and potable water systems covering permitted uses, labeling, backflow protection, and inspection requirements, with code citations
Fuel Gas Piping and Appliance Connections & Plumbing Math, Sizing Calculations, and Plan Reading
Size a gas piping system for a dwelling using the longest-length method, showing the load calculation for each appliance
Identify the requirements for gas appliance connectors, shutoff valves, sediment traps, and combustion air for five common appliances
Perform plumbing math conversions between fixture units, gallons per minute, pipe volume, slope, and grade percentage without a calculator error
Read a plumbing plan set and extract fixture locations, pipe sizes, riser information, and notes from the floor plan, riser diagram, and schedule
Calculate the volume and weight of water in a given length of pipe and use that to verify a pressure or flow estimate
Your checkpoint
A gas piping sizing calculation for a dwelling with four appliances, plus a plan-reading exercise where you extract ten specified data points from a sample drawing set
Plumbing Math, Sizing Calculations, and Plan Reading & General Plumbing Regulations, Definitions, and Administration & General Building and Plumbing Code Provisions
Complete a full practice exam under timed conditions and record your score by domain
Re-derive every calculation you missed and identify whether the error was a formula, a table lookup, or a code citation
Review the administrative and general provisions sections you scored lowest on and write out the specific rules you confused
Build a one-page formula sheet covering slope, fixture units, demand, gas sizing, and volume calculations
Re-read the code sections behind your ten most-missed questions and summarize each in one sentence
Your checkpoint
A scored practice exam with an error log that categorizes every missed question by domain and cause, plus a completed formula sheet
Sanitary Drainage, Vents, and Storm Drainage & Water Supply and Distribution & Fuel Gas Piping and Appliance Connections
Re-test the three heaviest domains with focused question sets and confirm improvement over your week 7 score
Recite from memory the fixture unit values, slope rules, and venting distances most likely to be tested
Complete two timed mini-exams of 25 questions each, targeting your weakest remaining areas
Review your error log one final time and confirm every entry has a resolved explanation
Your checkpoint
A final readiness summary showing domain-by-domain scores from week 7 to week 8, with a list of any remaining weak areas and the code sections you will review on exam morning
Milestones
Week 2: You can size a building drain from a fixture unit count and lay out a complete venting system without looking at the answer key
Week 4: You score at least 70 percent on a mixed 30-question set drawn from drainage, venting, and water supply, and you can cite the code section for each correct answer
Week 6: You complete a gas piping sizing calculation and a ten-point plan-reading exercise with no more than one error each
Week 7: Your timed practice exam score is at or above your target passing score, and every missed question has a written cause and correction
Week 8: Your week 8 domain scores exceed your week 7 scores in all three heavy domains (drainage and venting, water supply, gas piping)