Crane Types, Components, and Terminology

  • A crawler crane carries its load on a lattice or telescopic boom mounted on a rotating upperworks supported by two endless crawler track assemblies.

  • Boom length = base boom section + inserted lattice sections; effective radius is measured horizontally from the crane's rotation center to the load's center of gravity.

  • Boom angle is the angle between the boom centerline and horizontal; radius increases and capacity decreases as boom angle decreases.

  • The load moment indicator (LMI) or rated capacity limiter compares actual load moment to the chart value and warns or locks out before overload.

  • Counterweight reduces forward tipping moment; counterweight and carbody weight are fixed chart inputs and must match the configuration listed.

  • Boom foot pins, boom top sheaves, and the boom hoist (pendant or luffing) system transfer boom loads to the upperworks; pendant lines are fixed-length, luffing cylinders/ropes are variable.

  • A jib or fly extension adds reach at reduced capacity; jib capacity is charted separately and is typically a small fraction of main boom capacity.

  • Track shoes, grousers, and track width determine ground bearing pressure and flotation; wide shoes reduce pressure but do not increase chart capacity.

Quick reference

Site and Ground Conditions, Setup, and Stability

  • Ground bearing pressure (psf or kPa) = total weight carried by a track divided by the effective track contact area; compare to the soil's allowable bearing capacity.

  • Crawler cranes must sit on level, uniformly supporting ground; typical manufacturer limit is 1% out-of-level for the crane's longitudinal and transverse axes unless the chart states otherwise.

  • Mats, timber, or steel plates spread load: pressure under a mat is roughly total load divided by mat area, and mats must be sized so subgrade capacity is not exceeded.

  • Tipping is governed by load moment about the tipping axis (track edge or outrigger line); the crane tips when load moment exceeds the resisting moment of crane weight and counterweight.

  • Keep the swing path clear of excavations, buried utilities, slopes, and backfilled trenches; crane track pressure can extend well beyond the track footprint into the soil.

  • Boom deflection and side loading reduce stability; the crane must be set so the boom can swing freely through the full working arc without contacting obstructions.

  • Crawler crane travel with a load is only permitted within charted pick-and-carry ratings, on firm level ground, with the boom in the specified travel position.

  • Wind acts on boom and load sail area, increasing load moment and side load; stop operations when wind exceeds the manufacturer's limit or when the load cannot be controlled.

Quick reference

Load Charts, Capacity, and Load Calculations

  • Rated capacity = the lesser of the structural limit (boom, pins, wire rope) and the stability limit for the given radius, boom length, and configuration.

  • Total load = load weight + rigging and sling weight + hook block and headache ball weight + any attached below-the-hook device; deduct all of these from gross chart capacity.

  • Radius is the horizontal distance from the crane's rotation center to the vertical line through the load's center of gravity - not to the boom tip.

  • For capacities between charted radii, use the next longer radius (lower capacity); never interpolate upward.

  • For boom lengths between charted values, use the next longer boom length; for multiple part lines, use the reeving that matches the chart block.

  • Deductions for jib, auxiliary head, and stowed attachments must be applied exactly as the notes specify; chart notes override the table.

  • Operating radius changes with boom deflection and load swing; the loaded radius is greater than the unloaded geometric radius, so verify the loaded radius.

  • Line pull and parts of line: required line pull = total load / number of parts of line; the hook block capacity and rope breaking strength must both exceed the load with the required design factor.

Quick reference

Rigging, Slings, Hardware, and Load Handling

  • Sling tension in a two-leg bridle: tension per leg = (load / 2) / sin(angle from horizontal); flatter angles sharply increase leg tension.

  • Sling angle factor: capacity of a multi-leg sling is reduced by the sine of the angle to horizontal; a 60-degree leg uses about 0.866 of its vertical rating, 45 degrees about 0.707, 30 degrees 0.5.

  • Vertical hitch uses full sling capacity; choker hitch is typically rated about 75-80% of vertical; basket hitch can be up to 200% only if legs are vertical and the load is balanced.

  • Shackle and hook ratings are based on the pin or bowl, not the body; the working load limit must equal or exceed the load, and hooks need a functioning latch.

  • Center of gravity must be below or at the lift point to avoid load rotation; off-center lifts require calculated tag lines and load control.

  • Wire rope inspection rejects rope with broken wires exceeding the specified count per lay, kinking, crushing, bird-caging, or corrosion/heat damage.

  • Tag lines control rotation and swing but are not rigging; they must be long enough to keep personnel clear of the load and swing radius.

  • Shock loading, side pulls on the hook, and dragging loads are prohibited because they impose loads the chart and rigging are not rated for.

Quick reference

Pre-Operational Inspection, Maintenance, and Setup Checks

  • Daily pre-shift inspection covers wire rope, sheaves, hook and latch, boom pins and lacings, track condition, fluid levels, brakes, and the LMI/anti-two-block function.

  • Anti-two-block device must be tested before each shift; it stops hoist before the hook block contacts the boom tip.

  • LMI calibration and load cell zero must match the installed configuration; an uncalibrated or bypassed LMI removes the crane from service.

  • Boom assembly checks: all pins fully inserted and secured, lacing pins in place, pendant lines properly tensioned, and boom stop adjusted.

  • Wire rope end connections, wedge sockets, and dead-end anchorages must be inspected for correct assembly and broken wires at the termination.

  • Track tension and undercarriage: check for loose or missing track shoes, worn pins and bushings, and fluid leaks in the travel drives.

  • Functional checks before lifting: hoist, boom, swing, and travel brakes; travel alarm; horn; and all limit switches.

  • Maintenance records document inspections, repairs, and load test results; an annual or periodic inspection by a qualified person is required in addition to daily checks.

Quick reference

Operating Procedures, Signals, and Communication

  • Standard hand signals include hoist, lower, boom up/down, swing, stop, and emergency stop; the operator follows only one designated signal person.

  • The operator stops immediately on a stop signal from anyone; only the designated signal person may direct other motions.

  • Before lifting, confirm the load weight, radius, chart capacity, rigging, and swing path; lift a few inches and verify stability and brake holding.

  • Smooth starts and stops prevent load swing; swing the load with the boom, not by dragging or by swinging the load ahead of the boom.

  • Never leave the operator's station with a load suspended; if the operator leaves, the load is landed and the controls are secured.

  • Travel with a suspended load only when the chart permits, with the boom in the specified position and the load kept low and controlled.

  • Radio communication must be dedicated to the lift; hand signals are used when radios fail or when the signal person is in direct view.

  • Multiple crane lifts require a written plan, a designated lift director, and load sharing calculated so neither crane exceeds its chart.

Quick reference

Safety, Hazards, and Emergency Procedures

  • Power line approach: maintain the required minimum clearance from all energized lines; if contact occurs, the operator stays in the cab and warns others to stay clear until the line is de-energized.

  • If the crane contacts a power line and fire forces exit, jump clear without touching the crane and the ground at the same time, then shuffle away.

  • Personnel must never stand or walk under a suspended load, in the swing radius, or between the load and a fixed object.

  • Load drop or runaway load: sound the alarm, clear the area, and lower the load only if it can be done without endangering anyone.

  • Crane tipping or structural failure warning signs include LMI alarms, unusual boom deflection, and load swing; the operator lowers the load and stops.

  • Fire extinguisher must be on the crane and accessible; fuel only with the engine off and no ignition sources nearby.

  • Emergency shutdown: disengage the clutch/hoist, set brakes, lower the load if safe, and secure the controls before leaving the cab.

  • Incident reporting: any contact with power lines, dropped load, two-blocking, or overload must be reported and the crane inspected before returning to service.