CSCS Mobile Crane · Give each week a clear focus.
8 weeks · About 6 hours per week
Site and Lift Planning
Map every element of a lift plan (site survey, ground conditions, hazard identification, load weight, crane selection, permits) and explain why each element exists
Calculate ground bearing pressure for a given outrigger load and mat size, then compare it to a stated soil capacity
Identify overhead and subsurface hazards from a written site description and list the controls for each
Draft a hazard-control sequence for a lift near power lines using the minimum approach distance concept
Your checkpoint
A complete one-page lift plan for a hypothetical site, including a worked ground bearing pressure calculation and a hazard/control table with at least 8 entries
Site and Lift Planning & Load Charts, Capacity, and Configuration
Convert between load weight, radius, boom length, and boom angle using basic rigging geometry (sine/cosine relationships)
Read a generic capacity table and locate the governing capacity for a given radius, boom length, and quadrant
Apply deductions for jib, stinger, and auxiliary head configurations to arrive at net capacity
Explain how configuration changes (counterweight, outrigger spread, track or tire condition) alter the chart
Your checkpoint
A worked problem set of 10 capacity lookups with all deductions shown and net utilization percentage calculated for each
Load Charts, Capacity, and Configuration
Distinguish gross capacity, net capacity, and allowable load, and compute each from a scenario
Apply the utilization and safety-factor concepts to decide whether a planned lift is acceptable
Identify the chart notes that most often cause field errors (deductions, quadrant restrictions, travel restrictions, wind limits)
Solve multi-step problems that combine radius growth during a pick with deduction stacking
Your checkpoint
A timed 20-question capacity and configuration self-test, scored and reviewed, with every missed item rewritten as a corrected rule statement
Crane Setup, Assembly, and Disassembly & Rigging and Load Handling
Sequence a full crane assembly and disassembly, naming the verification checkpoints before each step
Select sling type, capacity, and hitch for given loads, and compute sling tension at various vertical angles
Determine the center of gravity of an asymmetric load and predict how it shifts when rigged from alternate points
Identify rigging hardware inspection rejection criteria and state the removal action for each
Your checkpoint
A written rigging plan for one asymmetric load with tension calculations at 30, 45, and 60 degrees, plus a rejected-hardware photo-free description list
Signalperson Duties and Hand Signals
Demonstrate every standard hand signal from memory to a partner and have them name each signal back correctly
Direct a simulated blind lift using only voice and hand signals, with the operator confirming each command
Describe the signalperson's stop authority and the conditions that require stopping the lift immediately
Explain communication failure protocols, including loss of radio or line of sight, and the required response
Your checkpoint
A recorded or witnessed practical demonstration of all required hand signals, scored against a checklist with zero errors
Operating Practices and Load Control
Execute the standard lift sequence (pre-lift checks, trial lift, swing, placement, load securement) and narrate each control
Identify swing, drift, and load-sway causes and apply the correct control input for each
State the wind and weather limits that require stopping or reassessing a lift
Explain load moment and anti-two-block systems and how to respond to each alarm or limiter activation
Your checkpoint
A written step-by-step operating procedure for one lift, with an alarm-response decision table covering at least 5 conditions
Inspection and Maintenance
Build a pre-shift inspection checklist covering wire rope, sheaves, hooks, hydraulics, brakes, and safety devices
List wire rope removal criteria and apply them to described rope conditions
Distinguish daily, periodic, and annual inspection responsibilities and recordkeeping requirements
State what to do when a defect is found mid-shift, including documentation and lockout
Your checkpoint
A completed mock daily inspection form for a described crane, with every defect flagged and a disposition stated for each
Safety, Hazards, and Emergency Procedures & Site and Lift Planning & Load Charts, Capacity, and Configuration
Rank the highest-consequence hazards across all domains and state the single control that most reduces each
Rehearse the emergency response sequence for power line contact, tip-over, and dropped load
Re-solve one missed capacity problem from weeks 2-3 and one missed lift-planning item from week 1
Complete a full-length timed practice exam and review every error by domain
Your checkpoint
A scored full-length practice exam with a written error log grouping misses by domain and confirming all domains above 80%
Milestones
Week 2: Can compute a ground bearing pressure and locate a chart capacity with deductions, unaided, in under 10 minutes
Week 4: Can sequence assembly and disassembly and produce a rigging plan with correct sling tensions at three angles
Week 6: Performs all hand signals with zero errors and states the correct response to 5 limiter or alarm conditions