Quick reference

Engineering Fundamentals and Applied Science

  • Static equilibrium requires ΣF = 0 and ΣM = 0 about any point; a two-force member carries load only along the line joining its pins.

  • Stress σ = F/A; axial strain ε = ΔL/L; within the elastic range σ = Eε (Hooke's law), where E is Young's modulus.

  • Thermal expansion: ΔL = αLΔT; restrained expansion generates σ = EαΔT when both ends are fixed.

  • Beam bending: σ = My/I and deflection scales with 1/EI, so doubling the second moment of area I halves bending stress and deflection.

  • Bernoulli (steady, incompressible, frictionless): p/γ + v²/2g + z = constant along a streamline.

  • Reynolds number Re = ρvD/μ; Re < 2000 indicates laminar pipe flow, Re > 4000 turbulent, between is transitional.

  • First law for a steady-flow open system: q − w = Δh + Δ(v²/2) + gΔz per unit mass.

  • Shaft power P = 2πNT, with N in revolutions per second and T in N·m; torque transmits power without changing angular speed.

Quick reference

Engineering Design and Analysis

  • Design factor (safety factor) n = failure strength / allowable stress; the allowable stress equals the limit stress divided by n.

  • A factor of safety below 1 indicates predicted failure; values are set by consequence of failure, load uncertainty and material variability.

  • Fatigue: alternating and mean stresses combine via the Goodman line σa/Se + σm/Su = 1 for a conservative infinite-life check.

  • Stress concentration factor Kt multiplies nominal stress at geometric discontinuities; Kt applies to the alternating component in fatigue.

  • Tolerance stack-up: worst-case assembly clearance = sum of individual tolerances; statistical (RSS) method uses the square root of the sum of squares.

  • A closed kinematic chain has one degree of freedom when mobility M = 3(n − 1) − 2j equals 1, with n links and j lower pairs.

  • Design reviews progress concept, preliminary and critical stages; each gate should have defined exit criteria and recorded actions.

  • Finite element results converge as mesh density increases; a mesh refinement check compares stress change between successive meshes.

Quick reference

Materials and Manufacturing Processes

  • Carbon content drives steel behaviour: low-carbon (<0.3% C) is ductile and weldable; above ~0.6% C hardness and crack sensitivity rise.

  • Quenching forms martensite; tempering afterwards restores toughness, so hardened parts are almost always tempered.

  • Annealing softens and relieves residual stress; normalising refines grain structure; both require controlled cooling rates.

  • Cast iron has high compressive strength and damping but low tensile ductility; it is unsuitable for shock tensile loading.

  • Welding: preheat reduces cooling rate and hydrogen cracking risk in thick or high-carbon joints; low-hydrogen electrodes limit diffusible hydrogen.

  • Heat-affected zone properties differ from parent metal; hardness peaks near the fusion line in many steels.

  • Machining surface finish improves with higher cutting speed, smaller feed and nose radius, and rigid tooling.

  • Additive manufacturing is anisotropic: properties along the build direction differ from in-plane properties, so orientation must be specified.

Quick reference

Project Planning and Management

  • Critical path is the longest duration path through the network; its total float is zero, and any delay on it delays project completion.

  • Total float = late finish − early finish = late start − early start; free float is the delay possible without affecting any successor.

  • Earned value: CV = EV − AC and SV = EV − PV; CPI = EV/AC and SPI = EV/PV, with CPI < 1 meaning cost overrun.

  • Estimate at completion EAC = BAC/CPI when current cost performance is expected to continue.

  • Crashing shortens duration by adding resources to critical activities; fast-tracking overlaps activities and raises rework risk.

  • A milestone has zero duration and marks a significant event; it consumes no resources.

  • Risk response categories: avoid, mitigate, transfer, accept; a contingency reserve covers identified risks, management reserve covers unknown ones.

  • Scope change control requires documented approval before work proceeds; unapproved changes erode the baseline.

Quick reference

Quality Assurance and Control

  • Quality assurance is process-focused and preventive; quality control is product-focused and detects defects after production.

  • Control charts distinguish common-cause variation (stable process) from special-cause variation (assignable, out-of-control signal).

  • A process is capable when Cp = (USL − LSL)/6σ ≥ 1.33; Cpk accounts for centring: Cpk = min[(USL − μ), (μ − LSL)]/3σ.

  • Cpk < 1 means the process produces nonconforming output even when centred poorly; Cp ignores centring entirely.

  • Seven basic quality tools: flow chart, check sheet, histogram, Pareto chart, cause-and-effect diagram, scatter diagram, control chart.

  • Pareto principle: roughly 80% of problems arise from about 20% of causes; prioritise the vital few.

  • Acceptance sampling risks: producer's risk (α) is rejecting a good lot; consumer's risk (β) is accepting a bad lot.

  • Nonconformance requires containment, root-cause analysis and corrective action; rework must be re-inspected to the same criteria.

Quick reference

Health, Safety and Environmental Compliance

  • Hierarchy of controls, most to least effective: elimination, substitution, engineering controls, administrative controls, PPE.

  • Hazard is a potential source of harm; risk is the combination of likelihood and severity of that harm.

  • Permit-to-work systems govern hot work, confined-space entry, excavation and energised work; isolation must be verified before entry.

  • Lockout/tagout requires energy isolation, dissipation of stored energy and verification of zero energy before work begins.

  • Confined spaces may have hazardous atmospheres; testing for oxygen, flammables and toxics precedes entry, with continuous monitoring and an attendant.

  • Noise exposure limits are time-weighted: as sound level rises, permissible exposure duration falls; hearing protection is the last resort.

  • Spill response follows contain, report, clean up, dispose; waste segregation and manifesting are required for hazardous waste.

  • Incident investigation seeks root causes (system and procedural) rather than blame; near misses are reported and investigated.

Quick reference

Codes, Standards and Regulations

  • A code is a legally adopted body of rules; a standard is a consensus technical document that a code may reference.

  • Specification states project-specific requirements; it may be stricter than the referenced code but not less strict.

  • Design codes give minimum requirements for safety; compliance with a code does not by itself prove fitness for a specific service.

  • Standards are revised periodically; the edition adopted by contract or regulation governs, not necessarily the latest edition.

  • Pressure equipment design typically requires design pressure, design temperature, material specification and corrosion allowance to be defined.

  • Regulatory approval (permits, inspections, statutory certifications) is separate from contractual technical compliance.

  • Where documents conflict, the contract's order of precedence governs; typically the specification outranks general drawings.

  • Manufacturer's instructions and test certificates (material, pressure, weld) form part of the compliance record.

Quick reference

Engineering Economics and Cost Estimation

  • Present worth of a single future amount: P = F/(1 + i)^n; future worth F = P(1 + i)^n.

  • Uniform series present worth: P = A[(1 + i)^n − 1]/[i(1 + i)^n]; capital recovery factor is its reciprocal.

  • Net present value compares alternatives by discounting all cash flows to time zero; choose the higher NPV at the same discount rate.

  • Internal rate of return is the discount rate at which NPV equals zero; accept a project when IRR exceeds the required rate.

  • Payback period ignores the time value of money and cash flows after payback; use it as a screening indicator only.

  • Annual worth converts all cash flows to an equal annual amount using the capital recovery factor.

  • Cost estimate accuracy improves with project definition: order-of-magnitude estimates are ±30–50%, detailed estimates roughly ±5–10%.

  • Depreciation (straight-line: (cost − salvage)/life) is an accounting allocation, not a cash flow; tax effects must be modelled separately.

Quick reference

Professional Ethics and Communication

  • Paramount obligation is to protect public health, safety and welfare; this outranks loyalty to an employer or client.

  • Competence rule: accept only work within one's competence or obtain qualified supervision; disclose limitations.

  • Conflicts of interest must be disclosed and avoided; undisclosed benefits from suppliers or contractors are improper.

  • Confidentiality applies to client and employer information; exceptions exist for legal requirements and public safety.

  • Signing or sealing documents certifies personal responsibility for their content; never seal work not prepared or reviewed by you.

  • Bribery, kickbacks and facilitation payments are prohibited; gifts should be nominal and disclosed per policy.

  • When a safety concern is ignored internally, escalate through the chain of command and, if unresolved, to the appropriate authority.

  • Technical communication: state assumptions, units, sources and limitations; a recommendation should be traceable to evidence.

Quick reference

Operations, Maintenance and Reliability

  • Reliability R(t) = e^(−λt) for a constant failure rate; mean time between failures MTBF = 1/λ.

  • Availability = MTBF/(MTBF + MTTR); reducing repair time raises availability as much as improving reliability.

  • The bathtub curve has three regions: infant mortality (decreasing rate), useful life (constant rate), wear-out (increasing rate).

  • Preventive maintenance is time-based; predictive (condition-based) maintenance acts on measured condition such as vibration or oil analysis.

  • Overall equipment effectiveness OEE = availability × performance × quality; world-class benchmark is about 85%.

  • Series systems multiply reliability, so system reliability falls below the weakest component; redundancy in parallel raises it.

  • Root cause analysis tools include 5-Why, fishbone and fault tree analysis; fix causes, not symptoms.

  • Criticality ranking (consequence × likelihood) directs maintenance effort to assets whose failure most affects safety and production.