- Slope gradient formula
- Slope percent equals rise divided by run, multiplied by 100. Run is horizontal distance, so a 1 m rise over 10 m horizontal run is a 10% slope.
- Aspect and microclimate
- Aspect is the compass direction a slope faces. South-facing slopes receive more solar radiation, warm and dry earlier, and favor drought-tolerant plants; north-facing slopes stay cooler and moister.
- Percolation test
- A field test measuring how fast water level drops in a prepared hole. Results, usually reported in minutes per inch, determine whether soil can support a drainfield or infiltration system.
- Utility locate tolerance zone
- The marked band around buried utilities where excavation must be done by hand or non-destructive methods. Always confirm locates before digging to avoid striking lines.
- Soil texture triangle
- A USDA diagram that classifies soil by percent sand, silt, and clay. The three percentages must sum to 100, and the intersecting lines identify the textural class.
- Cation exchange capacity
- CEC measures a soil's capacity to hold positively charged nutrients such as calcium, magnesium, and potassium. It increases with clay and organic matter and is low in sands.
- Plant-available water
- The water held between field capacity and permanent wilting point. It is the portion of soil moisture plants can actually extract, and it is greater in loams than in sands.
- Soil bulk density
- The mass of dry soil per unit volume. High bulk density indicates compaction that restricts root growth, air movement, and water infiltration, commonly above 1.6 g/cm³ in loam.
- Right plant, right place
- Selecting species that match the site's light, soil moisture, pH, space, and climate. Correct matching reduces water, fertilizer, and pesticide inputs and lowers maintenance.
- Root flare placement
- The widened base of the trunk where roots begin. It must sit at or slightly above grade; burying it causes girdling roots and decline.
- Nursery stock caliper
- Trunk diameter measured at a specified height above the root flare, used with height, spread, and root ball size to grade nursery stock under ANSI Z60.1.
- Pruning timing by bloom
- Prune spring-flowering shrubs right after bloom because they set buds the previous season. Prune summer-flowering shrubs in late winter or early spring before new growth.
- Distribution uniformity
- A measure of how evenly an irrigation system applies water. It is commonly computed as the average of the lowest quarter of catch readings divided by the overall average.
- Matched precipitation rate
- A design condition where all heads in a zone apply water at the same rate, preventing wet and dry stripes. It requires coordinating nozzle flow, arc, and spacing.
- Backflow prevention
- A device or assembly that stops contaminated water from reversing into a potable supply. Required on irrigation connections, with the assembly type chosen by hazard level.
- French drain
- A perforated pipe set in washed gravel and wrapped with filter fabric, sloped to carry subsurface water away. It lowers the water table and relieves saturated soils.
- Economic threshold
- The pest density at which the cost of control equals the crop loss that would otherwise occur. It guides whether treatment is economically justified.
- Disease triangle
- A model stating disease requires a susceptible host, a virulent pathogen, and a favorable environment. Removing any one factor prevents or reduces disease development.
- Pre-emergent herbicide
- A product applied to soil before weed seeds germinate, forming a barrier that inhibits seedling growth. It does not control weeds already emerged.
- Herbicide mode of action rotation
- Alternating herbicide groups with different modes of action across seasons to slow the evolution of resistant weed populations. It is combined with cultural and mechanical controls.
- Fertilizer N-P-K meaning
- The three numbers are percent nitrogen, available phosphate expressed as P2O5, and soluble potash expressed as K2O by product weight. They are not elemental P and K.
- P2O5 to elemental phosphorus
- Multiply the P2O5 percentage by 0.44 to get elemental phosphorus. Similarly, multiply K2O by 0.83 to get elemental potassium for nutrient budgeting.
- Fertilizer product rate
- Divide the nutrient needed by the nutrient fraction in the product. For example, 2 kg of N from a 20% N product requires 2 ÷ 0.20 = 10 kg of product.
- Fertilizer buffer setback
- An unfertilized strip between application areas and waterways or impervious surfaces. It intercepts runoff and reduces nutrient movement into surface water.
- Paver base compaction
- Aggregate base is placed in thin lifts, commonly 50 to 75 mm, and compacted with a plate compactor. Thin lifts achieve specified density better than one deep layer.
- Retaining wall drainage
- Granular backfill, filter fabric, and weep holes or perforated pipe relieve hydrostatic pressure behind a wall. Poor drainage is a leading cause of wall failure.
- Hardscape drainage slope
- Paving is sloped away from buildings, typically around 1 to 2%, so water drains off the surface. Verify with a level and straightedge before finishing.
- Chain saw kickback
- A sudden upward reaction when the upper tip of the guide bar contacts an object. A chain brake, low-kickback chain, and proper stance reduce injury risk.
- Two-stroke fuel mix
- Two-stroke engines require gasoline mixed with oil at the manufacturer's ratio for lubrication. Four-stroke engines use straight gasoline with a separate crankcase oil supply.
- Ladder 4:1 rule
- For every four units of height, the ladder base sits one unit out from the wall. Maintain three points of contact and secure the top before climbing.
- Change order
- A written, signed amendment to a contract that modifies scope, price, or schedule. Work should not proceed on a change until it is documented and approved.
- Silt fence installation
- A sediment barrier installed on the contour with the bottom edge trenched and backfilled. It ponds runoff so sediment settles and must be inspected and repaired after storms.