LCA Agriculture/Horticulture · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Site Assessment, Soil, and Water Management

  • Explain how soil texture, structure, and profile depth determine drainage, rooting volume, and plant suitability on a given site

  • Read a soil test report and convert its recommendations into amendment quantities for a stated bed area and depth

  • Describe how to run a simple infiltration test and interpret the result against typical drainage classes

  • Identify the site-assessment inputs (slope, aspect, exposure, existing vegetation, utilities) that must be gathered before any design decision

Your checkpoint

A one-page site and soil assessment template with 12 or more data fields, plus a worked amendment calculation for a 100 m² bed

Week 2

Site Assessment, Soil, and Water Management & Nutrient Management and Fertilization

  • Calculate fertilizer rates from a soil test recommendation and label analysis, showing the arithmetic step by step

  • Distinguish when to use granular, liquid, slow-release, and organic sources based on timing, mobility, and risk of loss

  • Describe how soil pH shifts nutrient availability and select an appropriate corrective amendment for acidic and alkaline soils

  • Explain how to prevent nutrient runoff and leaching when applying fertilizer near slopes, hardscape, and water bodies

Your checkpoint

A nutrient management worksheet solving three fertilizer-rate problems with different products, plus a short written justification for each product choice

Week 3

Plant Selection, Establishment, and Maintenance

  • Select plants for a stated site by matching hardiness zone, light, moisture, mature size, and maintenance budget

  • Write planting specifications covering stock grade, root flare depth, hole width, backfill, staking, and mulching

  • Sequence establishment care for the first two seasons, including watering frequency, mulch refresh, and pruning timing

  • Diagnose three common transplant failures (root girdling, planting too deep, insufficient water) from symptom descriptions

Your checkpoint

A planting specification sheet for five plants with a matching rationale table and a 24-month establishment care calendar

Week 4

Plant Selection, Establishment, and Maintenance & Pest, Disease, and Weed Management

  • Build an integrated pest management decision flow that starts with monitoring thresholds and ends with a documented treatment record

  • Identify the pest, disease, and weed categories by symptom and describe one cultural, one biological, and one chemical control for each

  • Explain herbicide mode-of-action groups and the resistance and drift risks that drive rotation and application timing

  • Describe pollinator and beneficial-insect protection measures to apply before any pesticide application

Your checkpoint

A 10-entry IPM log covering common landscape pests, diseases, and weeds, each with monitoring method, threshold, and three-tier control options

Week 5

Irrigation and Drainage Systems & Landscape Construction and Hardscape Installation

  • Calculate irrigation run time from emitter output, application rate, and the target depth of water

  • Compare drip, spray, and rotor zones and assign each to an appropriate planting type and slope condition

  • Describe how to grade and set base for a paver patio, including excavation depth, subbase compaction, and edge restraint

  • Explain how drainage features (swales, French drains, catch basins) are sized and connected to avoid water against structures

Your checkpoint

An irrigation and drainage plan for a 60 m² planting bed and adjacent 20 m² patio, with zone schedules, run-time calculations, and drainage routing

Week 6

Landscape Construction and Hardscape Installation & Equipment, Tools, and Safety Practices

  • Sequence a hardscape installation from layout and excavation through base, setting bed, and finishing

  • Select equipment and tools for a stated task and justify the choice on productivity, risk, and site access

  • Describe required personal protective equipment and safe operating practices for chainsaws, trenchers, and skid-steer loaders

  • Identify the safety and legal steps to take before digging, including utility locate requests and underground hazards

Your checkpoint

A hardscape installation sequence checklist with a matched equipment list and a task-by-task PPE and hazard table

Week 7

Project Planning, Estimating, and Contracts

  • Take off quantities from a written scope and build a line-item estimate covering labor, material, equipment, and overhead

  • Apply markup to convert cost into price and explain the difference between margin and markup with a worked example

  • Draft contract terms covering scope, change orders, payment schedule, warranty, and dispute resolution

  • Describe how to document a change order and communicate schedule impacts to a client in writing

Your checkpoint

A complete estimate and one-page contract summary for a sample residential landscape job, including a change-order template

Week 8

Regulations, Environmental Compliance, and Best Practices & Site Assessment, Soil, and Water Management & Plant Selection, Establishment, and Maintenance & Irrigation and Drainage Systems & Pest, Disease, and Weed Management & Nutrient Management and Fertilization & Landscape Construction and Hardscape Installation & Equipment, Tools, and Safety Practices & Project Planning, Estimating, and Contracts

  • Summarize the environmental compliance obligations that apply to landscape work, including erosion control, water-use limits, and protected species or wetland buffers

  • Explain how to handle and store fertilizers, pesticides, and fuel to prevent spills and meet label and local requirements

  • Review missed items from earlier weeks and rebuild a personal error list with the correction for each

  • Complete a timed 60-question mixed practice set and score it by domain to find remaining weak areas

Your checkpoint

A compliance quick-reference sheet plus a scored practice test with a ranked list of the three weakest domains and a remediation action for each

Milestones

Week 2: You can compute a fertilizer rate from a soil test recommendation without notes and explain why the chosen product form fits the timing and site

Week 4: You can diagnose an unfamiliar pest or disease problem from symptoms and produce a three-tier IPM response within 10 minutes

Week 6: You can produce an irrigation run-time calculation and a hardscape base-depth calculation back to back with correct units

Week 8: You score 75% or higher on the timed mixed practice set, with no single domain below 60%