LCA Craft and Design key terms
LCA Craft and Design · Get comfortable with the vocabulary.
- Functional Space Program
- Related: Net-to-Gross Ratio, Adjacency Matrix, Courtroom Module
A written schedule listing every room in a courthouse, its users, net area, occupancy, and adjacency needs, produced before design begins and used to test whether a proposed floor plan meets operational requirements.
- Courtroom Module
- Related: Functional Space Program, Courtroom Well
The standard planning envelope for one courtroom, including the well, gallery, jury area, and support spaces, used to size and stack courtrooms consistently and to compare options during facility planning.
- Courtroom Well
- Related: Courtroom Module, Sightline, Bar Enclosure
The enclosed floor area between the bench, counsel tables, and the gallery rail where proceedings occur; its size and shape drive sightlines, security separation, and evidence presentation layout.
- Adjacency Matrix
- Related: Functional Space Program, Secure Circulation Route
A grid scoring how closely each pair of spaces should be located, such as judge's chambers to courtroom, used to test stacking and circulation options against operational needs before committing to a plan.
- Net-to-Gross Ratio
- Related: Functional Space Program, Life-Cycle Costing
The share of a building's total floor area that is usable programmed space rather than circulation, walls, shafts, and mechanical rooms; it converts net room areas into a realistic construction budget footprint.
- Secure Circulation Route
- Related: Sallyport, Security Zoning, Adjacency Matrix
A controlled path, such as a judges' corridor or sallyport link, letting judges, jurors, and detainees move without crossing public zones; it is a primary planning decision, not a later security add-on.
- Security Zoning
- Related: Secure Circulation Route, Access Control Credential, Sallyport
Dividing a courthouse into layers of access, from public lobby through staff-only and secure holding areas, so each person's movement is limited to zones their role requires and credentials permit.
- Sallyport
- Related: Secure Circulation Route, Security Zoning
A controlled vehicle enclosure with interlocked doors where detainee transport vehicles unload inside the secure perimeter, preventing direct contact between detainees and the public during transfers.
- Sightline
- Related: Courtroom Well, Sightline Study, Bar Enclosure
The unobstructed line of view from a viewer's eye to a target, such as from the jury box to a witness or display; it is verified with section drawings and mock-ups, not assumed from plan view alone.
- Sightline Study
- Related: Sightline, Assistive Listening System
A drawing or computer model showing what each key participant can see from their seated eye height, used to test bench height, tiered gallery seating, rail placement, and screen positions before construction.
- Bar Enclosure
- Related: Courtroom Well, Sightline
The rail or partition separating the public gallery from the courtroom well; its height, gate location, and sightline impact must balance security control against open-court accessibility expectations.
- Access Control Credential
- Related: Security Zoning, Duress Alarm
A badge, card, or biometric token that grants a holder entry to defined security zones, with permissions managed, audited, and revoked centrally as staff roles change.
- Duress Alarm
- Related: Access Control Credential, Emergency Action Plan
A discreet fixed or wearable device letting a judge or staff member summon immediate security assistance; placement, response protocol, and periodic testing are all part of courtroom security design.
- Emergency Action Plan
- Related: Duress Alarm, Continuity of Operations Plan, Evacuation Assembly Point
A documented set of procedures assigning roles, evacuation routes, assembly points, and communication methods for fire, medical, weather, and security events, rehearsed through drills and reviewed after each exercise.
- Continuity of Operations Plan
- Related: Emergency Action Plan, Alternate Courthouse Site
A plan describing how essential court functions continue during disruption, including alternate locations, records access, and minimum staffing, so hearings and filings are not suspended indefinitely.
- Alternate Courthouse Site
- Related: Continuity of Operations Plan, Courtroom Technology Package
A pre-identified, equipped backup location where hearings can be held if the primary building is unavailable, with connectivity, security, and records access verified in advance.
- Evacuation Assembly Point
- Related: Emergency Action Plan
A designated outdoor location where occupants gather after leaving the building so staff can account for everyone and brief emergency responders without obstructing their access.
- Universal Design
- Related: Accessible Route, Assistive Listening System
Designing environments usable by the widest range of people without adaptation, for example level entries, clear turning space, and adjustable fixtures, rather than adding separate features for disabled users afterward.
- Accessible Route
- Related: Universal Design, Accessible Jury Box
A continuous path connecting entrances, parking, service counters, courtrooms, and restrooms that meets slope, width, and surface requirements so a wheelchair user can travel independently.
- Accessible Jury Box
- Related: Accessible Route, Sightline
Jury seating designed so wheelchair users serve alongside other jurors at comparable sightlines, typically through removable seats, level floor sections, and adequate maneuvering clearance.
- Assistive Listening System
- Related: Courtroom Audio System, Sightline Study
An audio system transmitting courtroom sound directly to hearing aids or receivers, required in assembly spaces and verified for coverage, clarity, and privacy of confidential bench conferences.
- Reasonable Accommodation Request Process
- Related: Universal Design, Assistive Listening System
A documented procedure for court users to request modifications such as sign language interpreting, reserved seating, or schedule changes, with timelines, decision authority, and appeal steps defined.
- Courtroom Audio System
- Related: Assistive Listening System, Evidence Presentation System
Microphones, mixing, amplification, and recording equipment that capture proceedings clearly for the record, remote participants, and assistive listening while suppressing feedback and room noise.
- Evidence Presentation System
- Related: Courtroom Audio System, Native File Format
Integrated displays, document cameras, and switching equipment letting counsel and the judge show exhibits simultaneously to the well, jury, gallery, and remote viewers from a single controlled source.
- Native File Format
- Related: Evidence Presentation System, Chain of Custody
The original file produced by the application that created a document or recording, preserved alongside any converted viewing copy because conversion can alter formatting, metadata, or timestamps.
- Chain of Custody
- Related: Evidence Room, Native File Format
A chronological record showing who handled an item of evidence, when, and for what purpose, from collection through storage and presentation, so its integrity can be defended in court.
- Evidence Room
- Related: Chain of Custody, Environmental Monitoring
A secure, access-controlled storage area for exhibits and case property, with logged entry, organized shelving, and environmental conditions suited to the materials held.
- Environmental Monitoring
- Related: Evidence Room, Records Retention Schedule, Preservation Environment
Continuous measurement of temperature, relative humidity, and sometimes light or pollutants in storage areas, with recorded data used to prove conditions stayed within targets for preserved records and evidence.
- Preservation Environment
- Related: Environmental Monitoring, Records Retention Schedule
The target temperature, humidity, light, and air-quality range set for stored records or evidence based on material type, balancing chemical decay rates against occupant comfort and energy cost.
- Records Retention Schedule
- Related: Preservation Environment, Environmental Monitoring
A policy listing record series, how long each must be kept, and its final disposition, used to size storage, plan digitization, and avoid retaining material beyond legal requirements.
- Basis of Design
- Related: Request for Information, Commissioning
A document recording the assumptions behind design decisions, such as occupancy loads, acoustic targets, and system capacities, so later changes can be evaluated against the original intent.
- Request for Information
- Related: Basis of Design, Change Order
A formal written query from the contractor asking the design team to clarify drawings or specifications, with the answer logged because it can affect cost, schedule, and the record set.
- Change Order
- Related: Request for Information, Contingency Allowance
A written modification to the construction contract adjusting scope, price, or time, requiring documented justification and approval before work proceeds to keep cost control intact.
- Commissioning
- Related: Basis of Design, Life-Cycle Costing
A structured process verifying that building systems, especially security, audio-visual, and HVAC, are installed, tested, and perform as specified before acceptance and occupancy.
- Contingency Allowance
- Related: Change Order, Life-Cycle Costing
A budgeted reserve held for identified but unquantified risks during design and construction, drawn down only through approved changes and tracked so remaining exposure stays visible.
- Life-Cycle Costing
- Related: Contingency Allowance, Net-to-Gross Ratio, Commissioning
Comparing options by total cost of ownership over their service life, including construction, energy, maintenance, and replacement, rather than by initial price alone.
- Capital Improvement Plan
- Related: Facility Condition Assessment, Life-Cycle Costing
A multi-year schedule of facility projects with estimated costs and funding sources, used to sequence repairs, renovations, and new construction against expected budgets and building condition.
- Facility Condition Assessment
- Related: Capital Improvement Plan, Deferred Maintenance Backlog
A systematic survey rating building components by condition and remaining useful life, producing the deficiency list and cost estimates that feed capital planning and deferred maintenance decisions.
- Deferred Maintenance Backlog
- Related: Facility Condition Assessment, Capital Improvement Plan
The accumulated value of maintenance and repairs postponed beyond their scheduled time, tracked because delay raises failure risk and usually increases eventual repair cost.
- Operational Resilience
- Related: Continuity of Operations Plan, Building Automation System
A facility's ability to keep delivering essential court services through outages, severe weather, or system failures, achieved through redundancy, backup power, and tested response procedures.
- Building Automation System
- Related: Operational Resilience, Environmental Monitoring
Controls and sensors managing heating, cooling, lighting, and sometimes security systems, with scheduling and trend data that reveal energy waste and support resilience and efficiency decisions.