LCA Craft and Design study materials
LCA Craft and Design study resources

LCA Craft and Design study plan

LCA Craft and Design · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Court Facility Planning, Space Standards, and Functional Requirements

  • Map the functional zones of a courthouse (public, restricted, secure circulation, judicial, in-custody) and label the circulation boundaries that separate them

  • Compute net-to-gross area ratios and assign space allowances per courtroom type (jury, non-jury, specialty) using a self-built spreadsheet

  • Draft a one-page adjacency matrix showing which zones may share entrances, elevators, or corridors

  • Explain how caseload projections and calendaring volume translate into courtroom counts and holding-cell capacity

Your checkpoint

A one-page courthouse zoning diagram plus a spreadsheet of courtroom counts derived from a stated caseload assumption

Week 2

Courtroom Design: Security, Sightlines, Accessibility, and Technology Integration

  • Sketch a courtroom section showing sightline angles from juror, judge, witness, and gallery positions to the bench, witness stand, and evidence display

  • Identify the security layers inside a courtroom (entry screening, duress alarms, prisoner movement routes, secure bench access) and annotate them on the sketch

  • Compare three seating layouts for accessibility clearances at the gallery, jury box, and counsel tables

  • List the technology touchpoints (evidence display, audio, interpretation, recording) that constrain furniture and wall placement

Your checkpoint

An annotated courtroom plan-and-section drawing that marks sightlines, security layers, accessible clearances, and technology positions

Week 3

Workplace Safety, Security Engineering, and Emergency Preparedness

  • Build a threat-and-vulnerability register covering screening, vehicle approach, prisoner transfer, and public counter areas

  • Sequence a courtroom evacuation and lockdown procedure minute by minute, naming who gives each order

  • Specify the alarm, CCTV, access-control, and duress systems that support each procedure and note the design implication of each

  • Draft a tabletop exercise scenario and the observation checklist an evaluator would use

Your checkpoint

A security concept narrative with a threat register and a 30-minute tabletop exercise script

Week 4

Accessibility, Universal Design, and Inclusive Court Environments

  • Apply accessibility requirements to a courtroom mock-up: accessible route, assistive listening, line of sight for wheelchair users, and jury deliberation access

  • Audit a hypothetical public lobby, restroom block, and self-help counter against universal design principles and record each gap

  • Design accommodations for limited-English-proficiency and deaf or hard-of-hearing participants, including interpreter sightlines and equipment

  • Write the accessible-design review questions you would put to an architect at each design milestone

Your checkpoint

A completed accessibility and universal design audit checklist for a sample courthouse floor with at least 15 findings

Week 5

Court Technology Infrastructure and Digital Evidence Presentation & Records Storage, Evidence Handling, and Environmental Controls

  • Draft a courtroom technology matrix pairing each room type with required AV, evidence-presentation, and recording capabilities

  • Plan the network and cabling backbone for digital evidence, including bandwidth assumptions for video playback and remote appearances

  • Define environmental control targets for records storage (temperature, relative humidity, light, pest) and justify each

  • Write chain-of-custody and digital evidence authentication steps from intake through courtroom display

Your checkpoint

A combined technology and records-storage specification sheet with environmental targets and a chain-of-custody flow

Week 6

Procurement, Project Management, and Construction Coordination

  • Draft a procurement package outline for a courthouse build: scope, evaluation criteria, and deliverable schedule

  • Build a design-review milestone calendar tying owner decisions to architect and contractor deadlines

  • Write a change-order review procedure that documents cost and schedule impact before approval

  • Identify the coordination points among owner, architect, construction manager, and court operations during commissioning

Your checkpoint

A project execution plan outline with a milestone calendar and a change-order review template

Week 7

Budgeting, Cost Control, and Life-Cycle Asset Management

  • Build a life-cycle cost model comparing two courtroom finishes or HVAC options over a 20-year horizon

  • Prepare a capital budget with contingency, escalation, and soft-cost lines, then reconcile it against a stated funding cap

  • List the asset register fields needed to track courthouse systems through operation and replacement

  • Explain how value engineering decisions can shift cost from capital to operations and how to flag that trade-off

Your checkpoint

A 20-year life-cycle cost comparison spreadsheet with a written recommendation

Week 8

Sustainability, Energy Efficiency, and Operational Resilience

  • Set measurable energy and resilience targets for a courthouse and map each to a design strategy

  • Assess how a power, HVAC, or network outage affects court operations and specify the backup and continuity measures for each

  • Review sustainability measures for conflict with security, records preservation, or accessibility requirements

  • Run a timed mixed-domain practice set and log every missed item with the domain it came from

Your checkpoint

A resilience and sustainability strategy brief plus a scored practice-set error log with a remediation list

Milestones

Week 2: You can sketch a courtroom from memory and correctly place sightlines, security layers, accessible clearances, and technology positions without notes

Week 4: You can complete a 15-point accessibility audit of an unfamiliar floor plan in under 45 minutes and justify each finding

Week 6: You can explain the owner-to-contractor decision chain from procurement through commissioning and name the document produced at each step

Week 8: You score at least 80% on a timed mixed-domain practice set and every missed item has a named remediation action