LCA Graphics and Construction Studies study materials
LCA Graphics and Construction Studies study resources

LCA Graphics and Construction Studies study plan

LCA Graphics and Construction Studies · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Graphics and Communication

  • Sketch and fully dimension a plan, elevation and section of a simple single-storey building to a stated scale, applying correct line weights and hatching conventions.

  • Produce a labelled orthographic projection set (first-angle or third-angle, stated explicitly) from a given pictorial drawing, including hidden detail where required.

  • Annotate a drawing with correct British/ISO dimensioning practice: dimension lines, extension lines, arrowheads, leader lines and text placement.

  • Identify and correct at least ten common draughting errors in a set of flawed drawings you source or create yourself, listing the rule breached for each.

Your checkpoint

A hand-drawn or CAD A3 sheet containing plan, elevation and section of one simple building, fully dimensioned and correctly annotated, plus a written error-correction log of ten items.

Week 2

Graphics and Communication & Materials and Their Properties

  • Produce a freehand and instrumented isometric and one-point perspective sketch of a small structure, keeping proportions consistent with a supplied set of overall dimensions.

  • Explain in writing how graphical conventions communicate material information (hatching for masonry, insulation, concrete, timber, glass) and match each hatch to its material.

  • Compile a one-page material data sheet for five common construction materials covering density, thermal conductivity, strength class and typical use.

  • Interpret a simple bar chart and a schedule table of material quantities, and convert the data into a labelled drawing annotation.

Your checkpoint

A two-sheet graphics pack: one isometric/perspective sheet and one material-convention reference sheet with a five-material comparison table.

Week 3

Materials and Their Properties

  • Compare the properties of timber, steel, concrete, masonry and glass under the headings of strength, durability, thermal performance, fire behaviour and workability.

  • Select and justify appropriate materials for four given building elements (external wall, floor slab, roof covering, internal partition) with reference to their properties.

  • Explain how moisture movement, thermal expansion and corrosion affect material choice and detailing, giving one worked example per mechanism.

  • Calculate a simple U-value for a two-layer construction from given thicknesses and thermal conductivities.

Your checkpoint

A written material-selection report of about 600 words covering four building elements, each with a justified material choice and a supporting property comparison table.

Week 4

Construction Principles and Techniques

  • Describe the sequence of operations for constructing a strip foundation, a suspended timber floor and a cavity wall, in correct order.

  • Draw a detailed section through a cavity wall at a wall/floor junction, showing damp-proof course, insulation, cavity ties and weep holes.

  • Explain the structural roles of lintels, padstones, wall ties and restraint straps, and state where each is required.

  • Compare timber-frame, steel-frame and loadbearing masonry construction in terms of speed, span capability and sequencing.

Your checkpoint

A set of three construction detail sections (foundation, wall/floor junction, roof eaves) with a written method statement of about 400 words for one of them.

Week 5

Construction Principles and Techniques & Building Services and Environmental Control

  • Produce a simple roof section showing rafters, ridge, insulation, ventilation path and underlay, with correct cold-roof ventilation detailing.

  • Describe the principles, components and layout of domestic cold water, hot water and above-ground drainage systems, including trap and vent requirements.

  • Explain the purpose and typical placement of a consumer unit, ring final circuit, and earthing and bonding arrangements in a dwelling.

  • Produce a schematic services layout on a floor plan showing incoming supply, meter position, distribution board and key outlets.

Your checkpoint

A services overlay drawing on a single-storey floor plan plus a one-page written explanation of the water, drainage and electrical arrangements shown.

Week 6

Building Services and Environmental Control & Health, Safety and Site Practice

  • Explain how insulation, glazing specification, airtightness and thermal bridging combine to determine a dwelling's heat loss, and state the role of a ventilation strategy.

  • Calculate a simple heat-loss figure for one room from given dimensions, U-values and temperature difference.

  • Identify the hazards and required controls for five common site activities, referencing the hierarchy of control.

  • Explain the purpose of a risk assessment, method statement and permit-to-work, and describe how each is recorded on site.

  • List the correct personal protective equipment and welfare provision required on a typical construction site.

Your checkpoint

A completed risk assessment and method statement for one specified site task, plus a one-page calculation of room heat loss with assumptions stated.

Week 7

Design and Problem Solving

  • Work through a design brief for a small building and produce a bubble diagram, a site-response sketch and two alternative concept options.

  • Evaluate the two concept options against stated criteria (daylight, circulation, cost, buildability) and justify a preferred solution in writing.

  • Identify and resolve three design conflicts, such as structure versus services routing or daylight versus overheating risk, showing the resolution on a sketch.

  • Apply a simple sustainability measure to the chosen design and explain its effect on performance.

Your checkpoint

A design solution pack: brief analysis, two options, an evaluation matrix and a justified preferred scheme with annotated sketches.

Week 8

Coursework and Practical Application & Graphics and Communication

  • Assemble a portfolio of your week 1-7 deliverables, checking each against a self-written criteria checklist covering accuracy, annotation and completeness.

  • Complete a full timed practice paper under exam conditions and mark it against the mark allocation, recording your score per domain.

  • Re-draught the weakest drawing from your portfolio to improve line quality, dimensioning and clarity.

  • Write a one-page reflection identifying your two weakest domains and the specific actions you will take before the exam.

Your checkpoint

A complete portfolio with a self-assessment checklist, a timed practice paper score sheet broken down by domain, and a one-page action plan.

Milestones

Week 2: You can produce a correctly scaled, fully dimensioned plan and section of a simple building without reference material, and explain the hatching conventions for at least six materials.

Week 4: You can draw a cavity wall/floor junction detail from memory with all damp-proofing, insulation and tying components correctly placed, and describe the construction sequence aloud in under five minutes.

Week 6: You can complete a risk assessment for an unfamiliar task and a room heat-loss calculation in under 45 minutes combined, with correct units and stated assumptions.

Week 8: Your timed practice paper scores at least 60% overall with no single domain below 50%, and your portfolio contains all eight weekly deliverables with a completed self-assessment checklist.