ie-rgii-non-domestic-gas-safety · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Non-Domestic Gas Pipework Design, Sizing, Materials and Installation & Legislation, Standards and RGII Regulatory Framework for Non-Domestic Gas

  • Map the regulatory hierarchy that governs non-domestic gas work in Ireland - Acts, statutory instruments, IS/EN standards and RGII registration criteria - into a one-page decision tree that starts at "job type" and ends at "which standard applies".

  • Calculate pipe sizing for three worked non-domestic scenarios (a 35 kW commercial boiler run, a manifold feeding two 60 kW appliances, and a long-run 15 m riser) using the pressure-drop method, and state the assumed diversity and diversity factor for each.

  • Compare copper, steel, PE and multilayer pipe for a commercial kitchen and an external LPG yard line, listing jointing method, support spacing and sleeve/ducting requirement for each.

  • Identify the ten most common non-compliance findings on commercial pipework installation and state the correct practice for each.

Your checkpoint

A 2-page pipework design pack: three completed sizing calculations with pressure-drop figures, a materials selection table, and the regulatory decision tree.

Week 2

Commercial and Industrial Gas Appliances, Controls and Flueing & Properties, Combustion and Behaviour of Natural Gas and LPG in Commercial and Industrial Settings

  • Explain combustion chemistry for natural gas and LPG - stoichiometric air requirement, CO2 max, excess air, dew point and flame temperature - and calculate theoretical air for two appliance ratings.

  • Distinguish the control-chain functions on a commercial appliance (flame supervision, gas pressure proving, air pressure proving, high/low gas pressure switches, safety shut-off valves) and state the failure response of each.

  • Classify flue types (room-sealed balanced, open flue, fan-draught, shared flue) and match each to a realistic commercial application with the applicable terminal and clearance rules.

  • Diagnose five appliance fault scenarios from described symptoms and state the safe isolation and test sequence for each.

Your checkpoint

A 10-row appliance controls and flueing matrix covering five appliance types, with the safety devices, flue category and fault response for each.

Week 3

Ventilation and Air Supply Requirements for Non-Domestic Gas Installations & Combustion Performance Analysis, Flue Gas Testing and Carbon Monoxide Safety

  • Calculate required ventilation openings for a commercial boiler room and a kitchen using the ventilation rate and opening-area approaches, and reconcile the two results.

  • Determine combustion air provision for an appliance installed in a compartment, including high- and low-level opening sizing and the effect of mechanical extract on the compartment.

  • Interpret flue gas readings - CO, CO2, O2, excess air, flue temperature and efficiency - and identify the reading pattern that indicates incomplete combustion versus dilution.

  • Perform combustion analysis on at least two live or simulated appliances and record results on a standard combustion analysis record.

  • Explain CO formation, COHb physiology and the ambient CO action levels that trigger evacuation versus investigation.

Your checkpoint

Two completed combustion analysis records plus a ventilation calculation sheet for one boiler room and one kitchen, with pass/fail judgements stated.

Week 4

Tightness Testing, Purging, Commissioning and Decommissioning of Non-Domestic Gas Systems & Combustion Performance Analysis, Flue Gas Testing and Carbon Monoxide Safety

  • Write the full tightness testing procedure for a medium-pressure commercial installation, including test pressure, stabilisation period, permissible pressure drop and the strength-test relationship to the tightness test.

  • Calculate permissible pressure drop for three pipe volumes and justify the figures used.

  • Sequence a nitrogen or gas purge for a commercial system, stating purge volume, purge point, venting location and the oxygen/gas concentration criteria for completion.

  • Produce a commissioning checklist covering appliance start-up, gas rate verification, operating pressure, combustion readings and safety device proving.

  • Produce a decommissioning procedure covering isolation, purging to air, labelling and record retention.

Your checkpoint

A complete tightness test, purge and commissioning procedure document with three worked pressure-drop calculations and a decommissioning annex.

Week 5

Gas Detection, Emergency Procedures and Safety Management in Non-Domestic Premises & Legislation, Standards and RGII Regulatory Framework for Non-Domestic Gas

  • Specify gas detection for a plant room and a commercial kitchen - target gas, sensor placement, alarm set points, audible/visual warning and interlock actions - and justify each choice.

  • Draft an emergency response procedure for a reported gas escape in an occupied commercial building, from detection through evacuation, isolation and handover to the emergency service.

  • Explain the RGII notification, registration and certification obligations that attach to non-domestic work, and identify which jobs require notification before work starts.

  • List the records an RGII-registered installer must retain and produce on request, and the retention period.

Your checkpoint

A gas detection specification sheet for one plant room plus a one-page emergency response flowchart and a notification obligations summary.

Week 6

Documentation, Certification, Handover and Records for Non-Domestic Gas Work & Non-Domestic Gas Pipework Design, Sizing, Materials and Installation

  • Complete a full installation handover pack for a hypothetical commercial boiler replacement: declaration of conformity, commissioning record, benchmark-style schedule, warning labels and user instructions.

  • Audit a sample pipework installation against the design, recording deviations and writing the corrective actions in the format an inspector would accept.

  • Produce as-fitted drawings and a pipework schedule that reconcile with the original design and note every deviation.

  • Write a client handover briefing script covering isolation points, emergency actions and maintenance intervals.

Your checkpoint

A complete handover and certification pack, including as-fitted schedule, deviation register and client briefing script.

Week 7

Properties, Combustion and Behaviour of Natural Gas and LPG in Commercial and Industrial Settings & Commercial and Industrial Gas Appliances, Controls and Flueing & Combustion Performance Analysis, Flue Gas Testing and Carbon Monoxide Safety

  • Revisit the weakest-scoring domain from weeks 2, 3 and 4 and close the gap with targeted worked problems rather than re-reading.

  • Solve ten mixed calculation problems under time pressure covering gas rate, heat input, air requirement, ventilation opening size, pressure drop and combustion efficiency.

  • Explain the interaction between appliance controls, flueing and combustion performance when a single fault produces multiple abnormal readings.

Your checkpoint

A timed 10-question calculation paper scored and corrected, with a written note on each error and the rule that was misapplied.

Week 8

Legislation, Standards and RGII Regulatory Framework for Non-Domestic Gas & Gas Detection, Emergency Procedures and Safety Management in Non-Domestic Premises & Documentation, Certification, Handover and Records for Non-Domestic Gas Work

  • Sit two full-length timed mock exams and record the score by domain to identify any remaining weak area.

  • Rehearse the regulatory, emergency and documentation content that is easy to lose marks on - notification thresholds, retention periods, set points and certification wording.

  • Build a one-page pre-exam reference sheet of figures, set points and standard references you must recall from memory.

Your checkpoint

Two scored mock exams with a domain-by-domain score breakdown and a final one-page reference sheet.

Milestones

Week 2: Can size a commercial pipe run and select the correct flue category and safety controls for a given appliance without referring to notes.

Week 4: Can write a tightness test and purge procedure from memory and defend every pressure and concentration figure used.

Week 6: Can produce a compliant handover pack unaided and identify at least five deliberate errors planted in a sample installation record.

Week 8: Scoring consistently above 80% on timed mocks, with no single domain below 60%.