You are asked to repoint 30 m² of a north-east-facing external wall of a solid-brick two-storey house built around 1900. The brick is a soft red, and the original bedding and jointing appears to be a lime-rich mortar. About 40% of the elevation has already been repointed by a previous owner with a hard 1:3 cement:sand mix, and several of those areas now show spalling faces, a network of fine cracks in the brick surface, and stepping of the joint edges. The remaining original joints are eroded back 15–20 mm and are soft and friable. The client wants the whole elevation 'done properly' and has asked you to work in bright September weather, one elevation at a time. A relative has told them cement is stronger so it must be better.

1. Diagnose why the cement repair areas are failing, and explain how this changes your choice of mortar for the repointing.

Read the worked answer

The failure pattern is the classic incompatible-mortar problem. A soft red brick from around 1900 is relatively weak in tension and highly permeable in vapour terms, and the original lime mortar is soft, flexible, and equally vapour-permeable. A 1:3 cement mortar is much stronger in compression, much stiffer, and much less permeable.

That combination gives three visible effects on this wall: the cement joint cannot accommodate the small thermal and moisture movements of the wall, so the stress has to go somewhere - it goes into the brick, which is weaker, and you get the fine cracking and the stepped joint edges. Second, the cement joint caps the face and slows drying, so moisture driven in from the exposed north-east face and from inside has to escape through the brick; it evaporates at the brick face and carries salts with it, causing surface disruption. Third, the bond between a stiff, waterproof joint and a soft brick is easily broken by frost once water sits in the joint.

So for the repointing, the mortar must be weaker, more flexible and more vapour-permeable than the brick, and matched to the original - a lime-based mortar such as a putty-lime or natural hydraulic lime mix with the aggregate graded to match the original joint texture. I would never use a cement-rich mix. I would get a small trial panel agreed with the client before touching the elevation, because the finished joint colour and finish will be visible for decades.

2. Set out how you would carry out the repointing in the September weather, including what you would do about the 40% of cement patching.

Read the worked answer

Preparation first. Rake out the original joints to a depth at least 2.5 times the joint width, aiming for around 20 mm where the brick is sound - enough to key the new mortar, not so deep that the brick is loosened. Use hand tools or a controlled grinding method on the soft brick; an angle grinder with an uncontrolled disc will over-cut the arrises and widen the joint, and soft red brick loses its face quickly. Dust out, and wet the joints down before repointing so the brick does not suck the water out of the mortar and kill the bond.

The cement patching is a decision, not a task: where the cement is sound and the brick behind is undamaged, it may stay; where it is cracked, proud or already causing spalling, it must come out to the full depth and be replaced in the matching lime mortar. I would mark those areas with the client before starting, because removal can expose further brick damage, which is a variation.

September sun and drying wind: do not repoint a full elevation then walk away. Work in manageable areas, keep the elevation shaded or work out of the direct sun, and finish the joint when it is thumb-dry and crumbly, not wet and not hard - tool it to match the original profile, then brush back. Protect from rain and from frost, and cover the top of any open joint run overnight. Finally, keep a record of the mix and take photographs for the client.