SOLAS Plumbing study materials
SOLAS Plumbing study resources

SOLAS Plumbing study plan

SOLAS Plumbing · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Plumbing Science, Materials and Pipework Systems & Health, Safety and Welfare on Plumbing Sites

  • Explain the thermal expansion and pressure behaviour of at least three common pipe materials (copper, PEX, and CPVC or multilayer) and state the design implications for each.

  • Identify the principal health and safety hazards on plumbing sites (manual handling, silica dust, asbestos, confined spaces, electrical and hot-work risks) and match each to a control measure.

  • Describe the correct selection and safe use of PPE and access equipment for above-ground plumbing installation tasks.

  • Outline the legal duties of employers and operatives under health and safety legislation for plumbing work, including risk assessment and accident reporting.

Your checkpoint

A one-page material and hazard matrix covering at least six pipe materials and six site hazards, each with a control measure.

Week 2

Plumbing Science, Materials and Pipework Systems

  • Compare jointing methods for copper, steel, PEX, and plastic waste pipe, stating where each is suitable and where it must not be used.

  • Explain how pipe sizing and pressure loss are affected by flow rate, pipe diameter, and fittings, and carry out a simple pressure-loss estimate for a given run.

  • Describe the purpose and operation of key pipework components: isolation valves, check valves, pressure-reducing valves, expansion vessels, and air vents.

  • Interpret a simple pipework schematic and identify the materials and fittings specified.

Your checkpoint

A completed pipe-sizing and pressure-loss calculation for a two-storey domestic cold-water run, with material and fitting schedule.

Week 3

Water Supply, Storage and Distribution

  • Explain the requirements for cold-water storage and distribution, including cistern sizing, air gaps, and the prevention of stagnation.

  • Describe the principles of boosted cold-water supply and the role of accumulators and pumps.

  • Explain how water supply pressure and flow are tested and what results indicate a satisfactory supply.

  • Outline the causes and prevention of water hammer and noise transmission in supply pipework.

Your checkpoint

A cold-water supply design for a two-bathroom dwelling, including cistern or accumulator sizing, pipe sizes, and a pressure and flow test record.

Week 4

Sanitary Appliances, Drainage and Above-Ground Discharge

  • Describe the selection and installation requirements for common sanitary appliances (WC, basin, bath, shower, sink) including trap seal and access for maintenance.

  • Explain the principles of above-ground drainage: branch, stack, and vent requirements, and the role of air admittance valves.

  • Calculate fall and gradient for a horizontal drainage run and state the consequences of incorrect fall.

  • Identify the causes of trap seal loss and describe how to prevent it.

Your checkpoint

A labelled drainage layout for a bathroom and kitchen group, with pipe sizes, gradients, and trap seal protection measures noted.

Week 5

Heating, Hot Water and Renewable Systems & Water Treatment, Legionella Control and Backflow Protection

  • Compare open-vented and unvented hot-water systems and state the safety controls required for each.

  • Explain the operating principles of heat pumps and solar thermal systems and the plumbing considerations for each.

  • Describe the conditions that promote Legionella growth and the control measures for hot- and cold-water systems, including temperature regimes and flushing.

  • Identify backflow risks and select appropriate protection (air gap, RPZ, double check valve) for given situations.

Your checkpoint

A hot-water system comparison table plus a Legionella control and backflow protection plan for a small commercial building.

Week 6

Installation Practice, Commissioning and Handover & Health, Safety and Welfare on Plumbing Sites

  • Sequence the installation of a domestic hot- and cold-water system from first fix to second fix, stating inspection points.

  • Describe the pressure testing and flushing procedures for supply and drainage pipework and the acceptance criteria.

  • Explain the commissioning checks for hot-water systems, including temperature and safety device testing.

  • Prepare a handover pack listing the documentation, labels, and user instructions required.

Your checkpoint

A commissioning and handover checklist for a domestic hot- and cold-water installation, with test records and sign-off points.

Week 7

Maintenance, Fault Diagnosis and Repair & Water Treatment, Legionella Control and Backflow Protection

  • Diagnose common faults in supply, drainage, and hot-water systems from given symptoms and state the logical test sequence for each.

  • Describe the maintenance requirements for Legionella control, including temperature monitoring, descaling, and record keeping.

  • Explain how to test and maintain backflow protection devices and the records required.

  • Outline a repair procedure for a leaking concealed pipe that minimises disruption and restores compliance.

Your checkpoint

A fault-diagnosis flowchart covering at least six plumbing faults, each with symptom, test, and repair action.

Week 8

Health, Safety and Welfare on Plumbing Sites & Plumbing Science, Materials and Pipework Systems & Water Supply, Storage and Distribution & Sanitary Appliances, Drainage and Above-Ground Discharge & Heating, Hot Water and Renewable Systems & Water Treatment, Legionella Control and Backflow Protection & Installation Practice, Commissioning and Handover & Maintenance, Fault Diagnosis and Repair

  • Complete a timed mock examination covering all eight domains and review every incorrect answer.

  • Revisit the two weakest domains identified by the mock and produce a one-page summary of key facts for each.

  • Recite the key numerical requirements (pipe sizes, gradients, temperatures, test pressures) from memory.

  • Confirm understanding of health and safety duties and Legionella and backflow controls through a self-check quiz.

Your checkpoint

A mock exam score report with a written remediation plan for the two weakest domains.

Milestones

Week 2: Can explain material selection and jointing for six pipe materials and complete a simple pressure-loss calculation without notes.

Week 4: Can size a cold-water cistern and design a drainage layout with correct gradients and trap protection.

Week 6: Can describe the full installation, testing, and commissioning sequence for a domestic hot- and cold-water system.

Week 8: Achieves at least 75% on the mock exam and has a written plan for the two weakest domains.