Week 1

Technical Drawing and Measurement

  • Set up a personal drawing kit (scale rule, dividers, set square, protractor) and lay out a title block to a recognised standard

  • Practise third-angle orthographic projection by drawing three views of a simple folded bracket on A3 paper

  • Convert a dimensioned drawing between millimetres and inches and record five worked conversions with the method shown

  • Identify and name the standard line types (visible, hidden, centre, cutting-plane, dimension) on two sample drawings you draw yourself

Your checkpoint

A three-view third-angle drawing of a folded sheet metal bracket, fully dimensioned, with a correctly completed title block and a one-page conversion worksheet

Week 2

Technical Drawing and Measurement & Sheet Metalworking Craft Practice

  • Produce a full-size development (flat pattern) of a simple 90-degree bend using bend allowance calculated from a stated K-factor

  • Calculate bend allowance and bend deduction for three different material thicknesses and radii, showing the formula and units

  • Measure five workshop items with a steel rule, vernier caliper and micrometer, and compare readings to assess repeatability

  • Interpret a tolerance block and state whether three given measured dimensions pass or fail

Your checkpoint

A flat-pattern development drawing with a calculation sheet showing bend allowance and bend deduction for three thickness/radius combinations, plus a measurement log of five items

Week 3

Sheet Metalworking Craft Practice

  • Demonstrate correct marking-out from a datum edge using a scriber, odd-leg caliper and dividers on a practice sheet

  • Cut straight and curved profiles in 0.8 mm mild steel using hand snips, maintaining a cut line within 1 mm of the marked line

  • Set out and cut a corner notch and a flanged corner, then describe why the notch size depends on flange height

  • Select and justify the correct snip type (straight, aviation left/right, double-cut) for three given cut geometries

Your checkpoint

A marked-out and hand-cut practice panel with a straight cut, a curved cut and a notched corner, with a short written justification of tool choices

Week 4

Sheet Metalworking Craft Practice & Sheet Metal Fabrication and Installation

  • Form a 90-degree bend in a fly press or hand bender and check squareness with a set square, recording the deviation

  • Explain springback and state how overbending compensates for it on a given material

  • Roll a simple cylindrical form and check diameter and roundness against the drawing

  • Identify the main parts and safe operating checks of a box-and-pan folder and a bending machine

Your checkpoint

A formed component (bent and rolled) inspected against the drawing with a dimensional record sheet showing deviations and the correction applied

Week 5

Sheet Metal Fabrication and Installation

  • Produce a riveted lap joint and a riveted butt joint with a strap, spacing rivets to a stated pitch and edge distance

  • Select rivet diameter and length for a given sheet thickness and explain the calculation

  • Compare soldered, riveted and mechanically fastened joints for a given service condition and justify a choice

  • Assemble a small fabricated box or tray from developed patterns and check overall dimensions

Your checkpoint

A riveted and assembled sheet metal box or tray, dimensionally checked, with a joint-selection comparison table covering at least three fastening methods

Week 6

Sheet Metal Fabrication and Installation & Health, Safety and Workshop Practice

  • Plan and sequence an installation task: mark fixing positions, set out levels and datums, and fix a fabricated item to a frame

  • Describe how to allow for expansion, thermal movement and clearance when installing sheet metal cladding or ductwork

  • List the hazards of the fabrication and installation tasks you have performed and match each to a control measure

  • Demonstrate correct selection and pre-use inspection of portable power tools and abrasive wheels

Your checkpoint

An installation method statement for a fabricated item covering sequence, fixings, tolerances and a hazard-to-control table with at least eight identified hazards

Week 7

Health, Safety and Workshop Practice

  • Carry out a workshop risk assessment for a sheet metal bay and record likelihood, severity and residual risk

  • State the legal duties of employer and employee under health and safety legislation in your jurisdiction and how they apply to you

  • Demonstrate safe handling and storage of sheet material, including edge protection and manual handling limits

  • Identify fire precautions and emergency actions relevant to hot work, sparks and solvent use in a metalworking shop

Your checkpoint

A completed risk assessment for a sheet metalworking bay, signed and dated, with control measures and residual risk ratings for at least ten hazards

Week 8

Sheet Metalworking Craft Practice & Sheet Metal Fabrication and Installation & Technical Drawing and Measurement & Health, Safety and Workshop Practice

  • Complete a timed 60-question mixed mock covering all four domains and score it by domain

  • Re-work every mock question answered incorrectly and write the correct reasoning for each

  • Recite from memory the key formulas (bend allowance, rivet length, pitch and edge distance rules) and the main safety duties

  • Review weak areas identified by the mock and produce a one-page revision sheet per weak domain

Your checkpoint

A scored 60-question mock with a domain-by-domain breakdown, corrected answers and four one-page revision sheets

Milestones

Week 2: Can produce a dimensioned flat pattern from a bend allowance calculation without reference notes, and measure to within 0.05 mm with a vernier caliper

Week 4: Has formed a bent and rolled component that passes a squareness and dimensional check against the drawing, and can explain springback and its correction

Week 6: Has produced an assembled riveted item and a written installation method statement with a hazard-to-control table

Week 8: Scores at least 70% overall on the mixed mock with no single domain below 60%