- Scope of Work
- A written definition of the restoration tasks, materials, methods, and quantities to be performed, establishing the boundary between included work and change orders.
- Change Order
- A written, dated authorization for work outside the agreed scope, including added cost and time, signed before the extra work begins.
- Pre-existing Damage
- Deterioration or damage present before the loss event that must be documented and excluded from the restoration scope to prevent liability shifting to the restorer.
- Unit-Cost Estimating
- A pricing method using quantity multiplied by unit price per line item, where quantities come from measured areas rather than the adjuster's original estimate.
- Contents Pack-Out
- Removal of salvageable contents to a controlled facility for cleaning, inventory, storage, and later return, scoped and priced separately from structural work.
- Mitigation
- Emergency actions that stop the source, protect the structure, and prevent secondary damage before cleaning and reconstruction begin.
- Negative Air Pressure
- A containment condition where exhaust exceeds supply so air flows into the work zone, preventing soot and contaminants from escaping to unaffected areas.
- HEPA Filtration
- High-efficiency particulate air filtration that captures fine soot and particulate matter, used with containment to protect occupants and unaffected zones.
- Dry Soot Removal
- Removal of acidic, hygroscopic soot by HEPA vacuuming and dry sponging before any wet cleaning, preventing smearing and deeper penetration.
- Charred Member Removal
- Removal of structural wood that has lost section or is severely charred, rather than coating it, because char reduces load capacity.
- Daily Moisture Log
- A record of moisture readings, temperature, and humidity taken at documented locations each day to prove drying progress and support the mitigation file.
- Cleaning Definition
- Removal of residue until the surface returns to its pre-loss condition; masking odor or appearance without removing residue is not cleaning.
- Chemistry Matching
- Selecting a cleaning agent by residue type: alkaline for protein and grease smoke, acidic for some soot films, solvent for oils and adhesives.
- Spot Test
- Applying a cleaning agent to an inconspicuous area first to confirm it will not damage dyes, finishes, or porous substrates.
- Clean-to-Dirty Sequence
- A work order that proceeds from clean areas to dirty areas and from high to low, preventing recontamination of already cleaned surfaces.
- Porous Material Limit
- Drywall paper, insulation, and upholstery padding that have absorbed smoke residue generally cannot be cleaned and must be removed and replaced.
- Contents Inventory
- An item-numbered record with description, condition, and disposition for each content item, photographed and tracked to prevent loss claims.
- Odor Source Removal
- The first deodorization step: removing char, soot, and contaminated porous materials, because no deodorizer can overcome an uncleaned source.
- Thermal Fogging
- A treatment that recreates smoke particle size to penetrate the same cavities smoke reached; it treats surfaces and air but does not replace cleaning.
- Ozone Treatment
- Use of a strong oxidizing gas to destroy odor molecules; the space must be unoccupied during treatment and ventilated before re-entry.
- Hydroxyl Generator
- An oxidizing deodorization device that can be used in occupied spaces, unlike ozone, which requires the space to be vacated.
- Odor-Blocking Sealer
- A shellac or specialty primer applied only after cleaning to seal residual odor in cavities and substrates; applying it over residue traps odor.
- Odor Clearance Test
- A documented sniff test by the client or a third party after treatment confirming odor has been reduced to an acceptable level.
- Subrogation
- The insurer's right, after paying the insured's claim, to pursue the party legally responsible for the loss to recover the payment.
- Responsible Party Identification
- Early determination of the cause and liable party, such as a defective appliance, contractor error, product failure, or third-party negligence.
- Evidence Preservation
- Keeping a failed component in its as-found condition, tagged, photographed, and stored under chain of custody for use in a subrogation claim.
- Statute of Limitations
- A jurisdictional deadline for filing a subrogation claim; missing it can bar recovery regardless of the strength of the evidence.
- Spoliation
- The loss, destruction, or alteration of evidence relevant to litigation, which can result in court sanctions or a separate legal claim.
- Duty to Preserve
- A legal obligation to keep evidence that arises when litigation is reasonably anticipated, not only after a lawsuit is formally filed.
- Chain of Custody
- A written record of who handled an evidence item, when, and where it was stored; gaps in the record weaken its evidentiary value.
- Written Release to Dispose
- Signed authorization from the insurer or client permitting disposal of a potentially relevant item; required before any evidence is discarded.
- Contemporaneous Documentation
- Notes, photos, and readings recorded at the time of the work; later reconstruction of records is weaker evidence and invites challenge.