IL Asbestos Abatement flashcards
IL Asbestos Abatement · Build recall with a focused review session.
33 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Class I work
- Removal of surfacing material, thermal system insulation, or asphalt and vinyl flooring that is ACM. It carries the highest exposure potential and requires the strictest controls.
- Class II work
- Removal of ACM that is not surfacing material, thermal system insulation, or flooring. Examples include gaskets and roofing, and work practices depend on friability.
- Class III work
- Repair and removal of small amounts of ACM during maintenance or custodial activity. It includes tasks such as replacing a valve gasket or patching pipe insulation.
- Class IV work
- Maintenance and custodial activity where ACM may be disturbed but is not removed. Examples include sweeping debris and cleaning up after abatement in a regulated area.
- Friable ACM
- Material that can be crumbled, pulverized, or reduced to powder by hand pressure. Friable material releases fibers readily and is subject to the strictest handling requirements.
- Negative pressure enclosure
- A containment held at approximately -0.02 inches of water column relative to adjacent spaces so air flows inward. It prevents fiber migration and must be monitored and documented.
- Excursion limit
- An OSHA limit of 1.0 fiber per cubic centimeter averaged over 30 minutes. It applies in addition to the 8-hour time-weighted average permissible exposure limit.
- P100 filter
- A particulate filter with 99.97 percent efficiency at 0.3 micron. It is used on air-purifying respirators and provides an assigned protection factor of 10 on a half mask.
- NESHAP notice threshold
- A written demolition or renovation notice is required when the project involves at least 260 linear feet, 160 square feet, or 35 cubic feet of regulated asbestos-containing material.
- RACM
- Regulated asbestos-containing material includes friable ACM and non-friable ACM that will be or has been crumbled, pulverized, or reduced to powder by the planned work.
- Regulated area signage
- Warning signs must mark regulated areas and bear the DANGER legend with the asbestos caution text. Access is limited to authorized, trained, and medically cleared persons.
- Waste manifest
- A shipping document tracking ACM from the project to a permitted landfill. Signed disposal receipts are retained to prove proper disposal and support the closeout package.
- Decontamination sequence
- Workers exit through the equipment room, then the shower, then the clean room. Entry reverses the order, and showering is required before leaving the containment.
- Clearance criteria
- Visual inspection showing no visible debris, followed by air samples below the specified limit, commonly 0.01 f/cc by PCM. Work cannot resume until clearance is documented.
- Daily project log
- A record of date, work area, personnel, tasks, pressure readings, monitoring results, and deviations. It supports the closeout package and demonstrates compliance during the project.
- Stop-work authority
- The supervisor halts work when negative pressure is lost, containment is breached, or exposure limits are exceeded. The condition is corrected and documented before work resumes.
- Respirator fit testing
- Annual fit testing is required, plus testing whenever a new respirator model or size is issued. Records are kept and verified before a worker is assigned to abatement.
- Abatement scope document
- A specification stating ACM locations and quantities, work classification, containment type, abatement method, clearance standard, and monitoring responsibilities for each building component.
- Critical-path sequencing
- Notification and permits, containment and negative air, abatement, visual inspection, air sampling, clearance, then demolition or renovation. Clearance must precede demolition.
- Third-party monitoring
- Air monitoring and clearance sampling contracted independently from the abatement contractor. Separation avoids a conflict of interest and strengthens the credibility of results.
- Closeout package
- The project record containing waste manifests, disposal receipts, daily logs, monitoring results, clearance reports, and training and certification records for the completed abatement.
- PCM fiber counting
- Phase contrast microscopy counts fibers longer than 5 micrometers with a length-to-width ratio of at least 3:1. It reports f/cc but does not identify fiber type.
- TEM with EDX
- Transmission electron microscopy with energy-dispersive X-ray analysis identifies asbestos fiber type and is used for clearance and for distinguishing asbestos from other fibers.
- Sample volume formula
- Volume in liters equals flow rate in liters per minute multiplied by sampling time in minutes. The result converts fiber counts to fibers per cubic centimeter.
- Pump calibration
- Pumps are calibrated with a primary standard before and after sampling, and the average of the two calibrations is used. Calibration data accompanies samples to the laboratory.
- Aggressive sampling
- Forced air from a fan or leaf blower suspends settled dust before clearance samples are collected. The specific method must match the contract or regulatory protocol.
- Air changes per hour
- The number of times enclosure air is replaced in one hour, used to size negative air machines. Typical abatement targets range from 4 to 12 air changes per hour.
- Critical barrier
- A sealed barrier at openings, penetrations, and HVAC or electrical systems that prevents fiber migration outside the containment. It is part of the project designer's containment plan.
- Homogeneous area
- A group of materials similar in appearance, age, and function that can be sampled as a unit. Sampling counts per area depend on material type and protocol.
- PLM bulk analysis
- Polarized light microscopy with dispersion staining identifies asbestos type and estimates percentage in bulk samples. It is the standard method for building material inspection.
- Material condition rating
- Inspectors rate ACM as good, damaged, or significantly damaged, and record accessibility and potential for disturbance. These ratings drive the hazard assessment.
- O&M program
- A management plan response action combining work practices, periodic surveillance, custodial training, and reinspection schedules to keep ACM in good condition in place.
- Reinspection interval
- ACM in good condition is typically reinspected every 12 months and damaged material every 6 months. Intervals are adjusted for building use and local requirements.