IL Asbestos Abatement study materials
IL Asbestos Abatement study resources

IL Asbestos Abatement key terms

IL Asbestos Abatement · Get comfortable with the vocabulary.

asbestos-containing material (ACM)

Any material or product that contains more than one percent asbestos by weight, as determined by polarized light microscopy or another accepted method. Illinois and federal rules use this threshold to decide what must be regulated.

Related: Polarized light microscopy (PLM), Regulated asbestos-containing material (RACM)
presumed asbestos-containing material (PACM)

Material that a building owner or inspector treats as containing asbestos until sampling proves otherwise, covering surfacing, thermal system insulation, and miscellaneous products in older buildings. Treating it as ACM keeps work safe when testing has not occurred.

Related: Asbestos-containing material (ACM), Bulk sampling
Regulated asbestos-containing material (RACM)

ACM that can be crumbled, pulverized, or reduced to powder by hand pressure, plus certain non-friable materials that will be disturbed. RACM triggers the strictest handling, packaging, and disposal requirements under state and federal rules.

Related: Friable asbestos material, Asbestos-containing material (ACM)
friable asbestos material

Material containing more than one percent asbestos that can be crumbled, pulverized, or reduced to powder by hand pressure when dry. Friability drives risk because fibers release easily into air and are more likely to be inhaled.

Related: Non-friable asbestos material, Regulated asbestos-containing material (RACM)
non-friable asbestos material

Asbestos-containing material that cannot be crumbled or powdered by ordinary hand pressure, such as intact floor tile, roofing, or cement pipe. It still poses a hazard when cut, ground, sanded, or broken, because those actions release fibers.

Related: Friable asbestos material, Category I non-friable material
Category I non-friable material

Non-friable asbestos-containing material such as asphalt roofing, shingles, and gaskets that will not be crumbled by hand pressure. It becomes regulated when sanded, ground, cut, or otherwise damaged so that it may release fibers.

Related: Non-friable asbestos material, Category II non-friable material
Category II non-friable material

Non-friable asbestos-containing material that is likely to be crumbled, pulverized, or reduced to powder by the forces expected during demolition or renovation, such as asbestos cement pipe or sheet. It is regulated once disturbed.

Related: Category I non-friable material, Regulated asbestos-containing material (RACM)
polarized light microscopy (PLM)

The standard laboratory method for identifying asbestos in bulk samples by examining fiber optical properties under polarized light. A trained analyst estimates the percentage and type of asbestos present, usually down to one percent.

Related: Bulk sampling, Asbestos-containing material (ACM)
phase contrast microscopy (PCM)

A light microscopy method used to count airborne fibers collected on a filter, but it cannot distinguish asbestos from other fibers. It is the usual method for air monitoring during abatement and for clearance sampling under the NIOSH 7400 method.

Related: Transmission electron microscopy (TEM), Clearance air sampling
transmission electron microscopy (TEM)

A high-magnification method that identifies asbestos fibers by structure and elemental composition, distinguishing them from other fibers. It is used for final clearance in some projects and for confirming asbestos types in complex samples.

Related: Phase contrast microscopy (PCM), Clearance air sampling
bulk sampling

Collecting small representative pieces of suspect material for laboratory analysis to determine whether asbestos is present. Proper sampling uses clean tools, avoids cross-contamination, and follows a sampling plan for each homogeneous area.

Related: Polarized light microscopy (PLM), Homogeneous area
homogeneous area

A surface or material that is uniform in color, texture, and date of application, so one set of samples can represent the whole area. Inspectors map these areas to reduce sampling while keeping results reliable.

Related: Bulk sampling, Asbestos inspection
asbestos inspection

A thorough on-site survey by a licensed inspector to locate and document all asbestos-containing and presumed asbestos-containing materials before renovation or demolition. Findings feed the management plan and abatement design.

Related: Homogeneous area, Asbestos management plan
asbestos management plan

A written plan for an asbestos-containing building that describes locations, condition, response actions, and a schedule for re-inspection. It is prepared by a licensed management planner and kept available to building occupants and workers.

Related: Asbestos inspection, Operations and maintenance (O&M) program
operations and maintenance (O&M) program

A continuing program of cleaning, work practices, and periodic surveillance that keeps asbestos-containing material in good condition and prevents disturbance. It is used when removal is not immediately required and material remains in place.

Related: Asbestos management plan, Periodic surveillance
periodic surveillance

Regular visual checks of asbestos-containing material, usually every six months in schools, to confirm that it remains intact and has not been damaged. Any change in condition is reported so repair or response actions can be scheduled.

Related: Operations and maintenance (O&M) program, Asbestos management plan
abatement

Any measure taken to eliminate or reduce asbestos exposure, including removal, encapsulation, enclosure, repair, and related cleanup. Each method has its own design, work practice, and clearance requirements.

Related: Encapsulation, Enclosure, Asbestos removal
asbestos removal

Physically taking asbestos-containing material out of a building using wet methods, containment, and careful handling. It is the most permanent abatement method but creates the greatest potential for fiber release if done poorly.

Related: Abatement, Containment (work area)
encapsulation

Coating or sealing asbestos-containing material with a penetrating or bridging sealant so fibers are locked in place. The material stays in the building, so the surface must remain intact and cannot be used where it will be disturbed.

Related: Enclosure, Abatement
enclosure

Building an airtight barrier around asbestos-containing material so it is separated from occupied space. Enclosures demand careful design, access control, and labeling so future workers do not penetrate the barrier and release fibers.

Related: Encapsulation, Abatement
containment (work area)

A sealed enclosure, often built of plastic sheeting on a frame, that keeps asbestos fibers inside the work area. It includes critical barriers at openings, a negative pressure system, and a decontamination unit where required.

Related: Critical barrier, Negative air pressure, Decontamination unit
critical barrier

A temporary seal over openings such as doors, windows, vents, and ducts that could let fibers escape the work area. Barriers must be inspected and repaired during the job to keep the containment airtight.

Related: Containment (work area), Negative air pressure
negative air pressure

Maintaining lower air pressure inside the containment than outside so air flows inward and fibers stay in the work area. It is created with exhaust fans and HEPA filters, and pressure differentials are monitored throughout the project.

Related: HEPA (high-efficiency particulate air) filter, Containment (work area)
HEPA (high-efficiency particulate air) filter

A filter that removes at least 99.97 percent of airborne particles 0.3 micrometers in diameter. HEPA units are used on vacuums, negative air machines, and respirators to capture asbestos fibers.

Related: Negative air pressure, Respirator
decontamination unit

A sequence of rooms where workers and equipment move from the work area to clean space, usually including a dirty room, shower, and clean room. The unit prevents fibers from being carried out on clothing, skin, or tools.

Related: Containment (work area), Personal protective equipment (PPE)
personal protective equipment (PPE)

Equipment worn to reduce exposure, including disposable coveralls, boots, gloves, and a properly fitted respirator. PPE must be removed and disposed of or cleaned before leaving the decontamination unit.

Related: Respirator, Decontamination unit
respirator

A tight-fitting mask, usually a half-face or full-face air-purifying type with P100 filters, worn to filter asbestos fibers. Workers must be medically cleared, fit tested, and trained before use.

Related: Personal protective equipment (PPE), Fit test
fit test

A test that verifies a respirator seals against a worker's face, using either qualitative or quantitative methods. It is repeated at least annually and whenever the model, size, or facial condition changes.

Related: Respirator, Personal protective equipment (PPE)
wet methods

Techniques that keep asbestos-containing material damp during removal, cutting, or cleanup so fibers are less likely to become airborne. Water or amended water is applied continuously, and dry sweeping or air blowing is prohibited.

Related: Amended water, Asbestos removal
amended water

Water mixed with a surfactant that helps it penetrate asbestos-containing material and suppress dust. It is used in wet removal, cleaning, and misting to reduce airborne fiber concentrations.

Related: Wet methods, Asbestos removal
clearance air sampling

Air monitoring performed after abatement and cleaning to confirm fiber levels are acceptably low before the containment is removed. Results are compared with the project's stated clearance standard and documented in a report.

Related: Phase contrast microscopy (PCM), Aggressive sampling
aggressive sampling

A clearance sampling technique that stirs up air, for example with fans or by brushing surfaces, to simulate normal activity and reveal any remaining contamination. It is often required for final clearance in school and public building projects.

Related: Clearance air sampling, Containment (work area)
project designer

A licensed professional who writes the abatement plan, including scope, methods, containment, air monitoring, and clearance criteria. The design must match the site conditions and the regulatory requirements for the project type.

Related: Abatement, Clearance air sampling
asbestos contractor

A licensed firm that performs abatement work and is responsible for supervision, worker training, notifications, waste handling, and compliance on the job. The contractor must hold the license required by the state before bidding or working.

Related: Supervisor, Notification of renovation or demolition
supervisor

The on-site person who directs abatement workers, enforces work practices and safety rules, and ensures the containment and decontamination systems function properly. Illinois requires a licensed supervisor on certain projects.

Related: Asbestos contractor, Containment (work area)
notification of renovation or demolition

A written notice to the state or local air authority before starting work that disturbs regulated asbestos-containing material, describing the project, location, and scheduled dates. Late or missing notice can stop a project and bring penalties.

Related: Regulated asbestos-containing material (RACM), Asbestos contractor
asbestos waste disposal

Placing removed asbestos material in leak-tight, labeled containers and transporting it to an approved landfill, with manifests tracking the shipment. Waste must be handled wet where required and kept from dusting during transport.

Related: Regulated asbestos-containing material (RACM), Wet methods
clearance standard

The maximum airborne fiber concentration allowed before a containment is released, stated in the project design and often expressed as fibers per cubic centimeter by PCM. Meeting it is required to finish the job.

Related: Clearance air sampling, Phase contrast microscopy (PCM)
asbestos worker

A trained and licensed person who performs abatement tasks under supervision, including removal, cleanup, and containment work. Workers must complete an approved course and refresher training and use required protective equipment.

Related: Supervisor, Personal protective equipment (PPE)