IL Asbestos Abatement key terms
IL Asbestos Abatement · Get comfortable with the vocabulary.
- asbestos-containing material (ACM)
- Related: Polarized light microscopy (PLM), Regulated asbestos-containing material (RACM)
Any material or product that contains more than one percent asbestos by weight, as determined by polarized light microscopy or another accepted method. Illinois and federal rules use this threshold to decide what must be regulated.
- presumed asbestos-containing material (PACM)
- Related: Asbestos-containing material (ACM), Bulk sampling
Material that a building owner or inspector treats as containing asbestos until sampling proves otherwise, covering surfacing, thermal system insulation, and miscellaneous products in older buildings. Treating it as ACM keeps work safe when testing has not occurred.
- Regulated asbestos-containing material (RACM)
- Related: Friable asbestos material, Asbestos-containing material (ACM)
ACM that can be crumbled, pulverized, or reduced to powder by hand pressure, plus certain non-friable materials that will be disturbed. RACM triggers the strictest handling, packaging, and disposal requirements under state and federal rules.
- friable asbestos material
- Related: Non-friable asbestos material, Regulated asbestos-containing material (RACM)
Material containing more than one percent asbestos that can be crumbled, pulverized, or reduced to powder by hand pressure when dry. Friability drives risk because fibers release easily into air and are more likely to be inhaled.
- non-friable asbestos material
- Related: Friable asbestos material, Category I non-friable material
Asbestos-containing material that cannot be crumbled or powdered by ordinary hand pressure, such as intact floor tile, roofing, or cement pipe. It still poses a hazard when cut, ground, sanded, or broken, because those actions release fibers.
- Category I non-friable material
- Related: Non-friable asbestos material, Category II non-friable material
Non-friable asbestos-containing material such as asphalt roofing, shingles, and gaskets that will not be crumbled by hand pressure. It becomes regulated when sanded, ground, cut, or otherwise damaged so that it may release fibers.
- Category II non-friable material
- Related: Category I non-friable material, Regulated asbestos-containing material (RACM)
Non-friable asbestos-containing material that is likely to be crumbled, pulverized, or reduced to powder by the forces expected during demolition or renovation, such as asbestos cement pipe or sheet. It is regulated once disturbed.
- polarized light microscopy (PLM)
- Related: Bulk sampling, Asbestos-containing material (ACM)
The standard laboratory method for identifying asbestos in bulk samples by examining fiber optical properties under polarized light. A trained analyst estimates the percentage and type of asbestos present, usually down to one percent.
- phase contrast microscopy (PCM)
- Related: Transmission electron microscopy (TEM), Clearance air sampling
A light microscopy method used to count airborne fibers collected on a filter, but it cannot distinguish asbestos from other fibers. It is the usual method for air monitoring during abatement and for clearance sampling under the NIOSH 7400 method.
- transmission electron microscopy (TEM)
- Related: Phase contrast microscopy (PCM), Clearance air sampling
A high-magnification method that identifies asbestos fibers by structure and elemental composition, distinguishing them from other fibers. It is used for final clearance in some projects and for confirming asbestos types in complex samples.
- bulk sampling
- Related: Polarized light microscopy (PLM), Homogeneous area
Collecting small representative pieces of suspect material for laboratory analysis to determine whether asbestos is present. Proper sampling uses clean tools, avoids cross-contamination, and follows a sampling plan for each homogeneous area.
- homogeneous area
- Related: Bulk sampling, Asbestos inspection
A surface or material that is uniform in color, texture, and date of application, so one set of samples can represent the whole area. Inspectors map these areas to reduce sampling while keeping results reliable.
- asbestos inspection
- Related: Homogeneous area, Asbestos management plan
A thorough on-site survey by a licensed inspector to locate and document all asbestos-containing and presumed asbestos-containing materials before renovation or demolition. Findings feed the management plan and abatement design.
- asbestos management plan
- Related: Asbestos inspection, Operations and maintenance (O&M) program
A written plan for an asbestos-containing building that describes locations, condition, response actions, and a schedule for re-inspection. It is prepared by a licensed management planner and kept available to building occupants and workers.
- operations and maintenance (O&M) program
- Related: Asbestos management plan, Periodic surveillance
A continuing program of cleaning, work practices, and periodic surveillance that keeps asbestos-containing material in good condition and prevents disturbance. It is used when removal is not immediately required and material remains in place.
- periodic surveillance
- Related: Operations and maintenance (O&M) program, Asbestos management plan
Regular visual checks of asbestos-containing material, usually every six months in schools, to confirm that it remains intact and has not been damaged. Any change in condition is reported so repair or response actions can be scheduled.
- abatement
- Related: Encapsulation, Enclosure, Asbestos removal
Any measure taken to eliminate or reduce asbestos exposure, including removal, encapsulation, enclosure, repair, and related cleanup. Each method has its own design, work practice, and clearance requirements.
- asbestos removal
- Related: Abatement, Containment (work area)
Physically taking asbestos-containing material out of a building using wet methods, containment, and careful handling. It is the most permanent abatement method but creates the greatest potential for fiber release if done poorly.
- encapsulation
- Related: Enclosure, Abatement
Coating or sealing asbestos-containing material with a penetrating or bridging sealant so fibers are locked in place. The material stays in the building, so the surface must remain intact and cannot be used where it will be disturbed.
- enclosure
- Related: Encapsulation, Abatement
Building an airtight barrier around asbestos-containing material so it is separated from occupied space. Enclosures demand careful design, access control, and labeling so future workers do not penetrate the barrier and release fibers.
- containment (work area)
- Related: Critical barrier, Negative air pressure, Decontamination unit
A sealed enclosure, often built of plastic sheeting on a frame, that keeps asbestos fibers inside the work area. It includes critical barriers at openings, a negative pressure system, and a decontamination unit where required.
- critical barrier
- Related: Containment (work area), Negative air pressure
A temporary seal over openings such as doors, windows, vents, and ducts that could let fibers escape the work area. Barriers must be inspected and repaired during the job to keep the containment airtight.
- negative air pressure
- Related: HEPA (high-efficiency particulate air) filter, Containment (work area)
Maintaining lower air pressure inside the containment than outside so air flows inward and fibers stay in the work area. It is created with exhaust fans and HEPA filters, and pressure differentials are monitored throughout the project.
- HEPA (high-efficiency particulate air) filter
- Related: Negative air pressure, Respirator
A filter that removes at least 99.97 percent of airborne particles 0.3 micrometers in diameter. HEPA units are used on vacuums, negative air machines, and respirators to capture asbestos fibers.
- decontamination unit
- Related: Containment (work area), Personal protective equipment (PPE)
A sequence of rooms where workers and equipment move from the work area to clean space, usually including a dirty room, shower, and clean room. The unit prevents fibers from being carried out on clothing, skin, or tools.
- personal protective equipment (PPE)
- Related: Respirator, Decontamination unit
Equipment worn to reduce exposure, including disposable coveralls, boots, gloves, and a properly fitted respirator. PPE must be removed and disposed of or cleaned before leaving the decontamination unit.
- respirator
- Related: Personal protective equipment (PPE), Fit test
A tight-fitting mask, usually a half-face or full-face air-purifying type with P100 filters, worn to filter asbestos fibers. Workers must be medically cleared, fit tested, and trained before use.
- fit test
- Related: Respirator, Personal protective equipment (PPE)
A test that verifies a respirator seals against a worker's face, using either qualitative or quantitative methods. It is repeated at least annually and whenever the model, size, or facial condition changes.
- wet methods
- Related: Amended water, Asbestos removal
Techniques that keep asbestos-containing material damp during removal, cutting, or cleanup so fibers are less likely to become airborne. Water or amended water is applied continuously, and dry sweeping or air blowing is prohibited.
- amended water
- Related: Wet methods, Asbestos removal
Water mixed with a surfactant that helps it penetrate asbestos-containing material and suppress dust. It is used in wet removal, cleaning, and misting to reduce airborne fiber concentrations.
- clearance air sampling
- Related: Phase contrast microscopy (PCM), Aggressive sampling
Air monitoring performed after abatement and cleaning to confirm fiber levels are acceptably low before the containment is removed. Results are compared with the project's stated clearance standard and documented in a report.
- aggressive sampling
- Related: Clearance air sampling, Containment (work area)
A clearance sampling technique that stirs up air, for example with fans or by brushing surfaces, to simulate normal activity and reveal any remaining contamination. It is often required for final clearance in school and public building projects.
- project designer
- Related: Abatement, Clearance air sampling
A licensed professional who writes the abatement plan, including scope, methods, containment, air monitoring, and clearance criteria. The design must match the site conditions and the regulatory requirements for the project type.
- asbestos contractor
- Related: Supervisor, Notification of renovation or demolition
A licensed firm that performs abatement work and is responsible for supervision, worker training, notifications, waste handling, and compliance on the job. The contractor must hold the license required by the state before bidding or working.
- supervisor
- Related: Asbestos contractor, Containment (work area)
The on-site person who directs abatement workers, enforces work practices and safety rules, and ensures the containment and decontamination systems function properly. Illinois requires a licensed supervisor on certain projects.
- notification of renovation or demolition
- Related: Regulated asbestos-containing material (RACM), Asbestos contractor
A written notice to the state or local air authority before starting work that disturbs regulated asbestos-containing material, describing the project, location, and scheduled dates. Late or missing notice can stop a project and bring penalties.
- asbestos waste disposal
- Related: Regulated asbestos-containing material (RACM), Wet methods
Placing removed asbestos material in leak-tight, labeled containers and transporting it to an approved landfill, with manifests tracking the shipment. Waste must be handled wet where required and kept from dusting during transport.
- clearance standard
- Related: Clearance air sampling, Phase contrast microscopy (PCM)
The maximum airborne fiber concentration allowed before a containment is released, stated in the project design and often expressed as fibers per cubic centimeter by PCM. Meeting it is required to finish the job.
- asbestos worker
- Related: Supervisor, Personal protective equipment (PPE)
A trained and licensed person who performs abatement tasks under supervision, including removal, cleanup, and containment work. Workers must complete an approved course and refresher training and use required protective equipment.