IL Well Driller study materials
IL Well Driller study resources

IL Well Driller cheat sheet

IL Well Driller · Keep the key ideas within reach.

Quick reference

Water Well Construction, Drilling Methods, and Equipment

  • Rotary drilling uses a circulating fluid (mud, water, or air) to cool the bit, carry cuttings to surface, and stabilize the borehole wall; cable-tool drilling breaks rock by percussion and removes cuttings with a bailer.

  • Casing must extend at least 12 inches above the finished ground surface (or above the floor of a pit), and the annular space outside the casing must be sealed to prevent surface water entry.

  • Grout is placed by the pump-and-treat method from the bottom of the annular space upward; free-fall dumping of grout is prohibited because it bridges and leaves voids.

  • A well screen or perforated interval is set opposite the producing formation; screen openings are sized to retain formation material while passing water, commonly using the sieve analysis of the aquifer sand.

  • Drilling fluid density and viscosity must be controlled: excessive mud weight can fracture shallow formations, and excessive sand content accelerates pump wear.

  • Temporary casing is removed as grout is placed, or the annulus is tremied in stages, so that the seal is continuous from the bottom of the seal to the surface.

  • Well construction records must document borehole diameter, casing size and depth, screen setting, grout type and volume, and static water level for the completion report.

  • Artesian (flowing) wells require a control valve and a sealed casing annulus to prevent uncontrolled discharge and cross-contamination between aquifers.

Quick reference

Well Siting, Setback Distances, and Grouting/Sealing Requirements

  • Illinois requires a minimum horizontal separation of 50 feet between a private water well and a septic tank, and 75 feet between a well and a septic absorption field (soil absorption system).

  • A well must be at least 50 feet from a sanitary sewer line and at least 25 feet from a storm sewer or drainage ditch, with the casing extended above flood level where flooding is possible.

  • Minimum setback from a privy, cesspool, or pit latrine is 75 feet; from a livestock yard or animal confinement area the minimum is 50 feet.

  • Grout seals must extend from the top of the well down to at least 25 feet below the ground surface, and deeper where the well passes through a shallow aquifer that must be protected from surface contamination.

  • Neat cement grout is mixed at no more than 6 gallons of clean water per 94-pound sack of cement; bentonite grout is mixed per manufacturer specification and must not be diluted below the specified density.

  • Grout volume is calculated from the annular volume between borehole wall and casing, multiplied by an excess factor (commonly 1.1 to 1.5) to account for washouts and lost circulation.

  • A well may not be located in a floodway, in a pit that can collect surface water, or within 10 feet of a building foundation or property line where local ordinance is stricter.

  • Where a well is completed in a bedrock aquifer overlain by a shallower aquifer, the casing and grout must seal off the shallow aquifer so that the two are not hydraulically connected.

Quick reference

Well Development, Disinfection, Pumping Equipment, and Abandonment

  • Well development removes drilling fluid, fines, and filter-cake from the borehole and screen; methods include surging, jetting, air-lifting, and overpumping until the discharge runs clear.

  • A developed well should produce sand-free water at the design pumping rate; development continues until turbidity and sand content stabilize, not merely until the water first clears.

  • New wells are disinfected with a chlorine solution producing at least 50 mg/L free chlorine throughout the water column, held for a minimum contact time of 12 hours (24 hours is common practice) before pumping to waste.

  • After disinfection, the well is pumped to waste until chlorine residual is gone, and a bacteriological sample is collected only after the residual has dissipated.

  • Pump capacity is selected from the well yield, static water level, pumping water level, and total dynamic head; the pump intake is set above the screen or above the bottom of the well to avoid drawing sand.

  • A pitless adapter allows the discharge line to pass through the casing below the frost line so the well can be sealed at the surface with a sanitary well cap.

  • Abandonment of an unusable well requires removal of obstructions where practicable, disinfection, and filling the entire borehole with grout or clean impermeable material placed from the bottom up.

  • Abandoned wells must be sealed by a licensed well driller and the sealing record filed with the state; an open, unsealed well is a direct pathway for surface contamination to reach the aquifer.

Quick reference

Illinois Water Well Construction Code, Licensing Rules, and Public Health Protection

  • The Illinois Water Well Construction Code is administered by the Illinois Department of Public Health; the code sets construction, sealing, and pump installation requirements for water wells in the state.

  • Water well drilling and pump installation are licensed activities: a Water Well Driller license and a Water Well Pump Installation license are separate credentials, and work must be performed under the responsible licensee.

  • A well completion report (driller's log) must be filed with the Department for each well, recording location, depth, geology, casing, grout, and yield.

  • The code requires a sanitary well cap, a watertight casing, and a grouted annular seal; a well lacking any of these is a construction deficiency subject to correction.

  • Public health protection focuses on preventing cross-connections and backflow: the well discharge must not be connected to a system carrying nonpotable water without an approved backflow prevention device.

  • Bacteriological samples are collected in sterile containers after disinfection and chlorine dissipation; a confirmed total coliform positive result triggers investigation and corrective action.

  • The licensee is responsible for ensuring that equipment and materials contacting drinking water meet NSF/ANSI Standard 61 or an equivalent health-effects standard.

  • Violations of the code can result in license suspension or revocation, and the Department may order a well sealed or repaired when it poses a contamination risk to the aquifer.