IL Well Driller study materials
IL Well Driller study resources

IL Well Driller study plan

IL Well Driller · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Water Well Construction, Drilling Methods, and Equipment & Illinois Water Well Construction Code, Licensing Rules, and Public Health Protection

  • Map the four exam domains against the Illinois Water Well Construction Code and identify which code sections govern drilling methods versus siting versus sealing.

  • List the major drilling methods (rotary air, rotary mud, cable tool, hollow-stem auger, sonic) and write one paragraph each on the formations and depth ranges where each is used in Illinois.

  • Define the licensed well driller and pump installer scope of practice and note which tasks require a licensed contractor versus an apprentice under supervision.

  • Build a personal glossary of 40 equipment and code terms with a one-line definition for each.

Your checkpoint

A 3-5 page domain map plus 40-term glossary that cross-references each term to the code section or method where it appears.

Week 2

Water Well Construction, Drilling Methods, and Equipment

  • Trace the sequence of a rotary mud well from site prep through casing setting, grouting, and development, and annotate where inspection points fall.

  • Compare casing and screen materials and specify when each is appropriate based on formation and water chemistry.

  • Calculate annular volume for a given borehole and casing diameter, and use that to estimate grout and filter pack quantities.

  • Diagnose three common drilling problems (lost circulation, stuck pipe, formation collapse) and write the corrective action for each.

Your checkpoint

A worked calculation set of five annular volume and grout quantity problems with answers and a one-page drilling sequence flowchart.

Week 3

Well Siting, Setback Distances, and Grouting/Sealing Requirements

  • State the setback distances from potential contamination sources (septic systems, privies, animal lots, property lines, buildings) and cite the code basis for each.

  • Explain the purpose of the sanitary seal and describe the grouting methods used for the annular space in different borehole conditions.

  • Identify when a variance or alternative construction is needed and describe the documentation a driller must submit.

  • Sketch a cross-section of a properly sealed well showing casing, grout, seal, and pitless adapter placement.

Your checkpoint

A labeled well cross-section drawing plus a setback distance reference table with code citations for at least 10 sources.

Week 4

Well Siting, Setback Distances, and Grouting/Sealing Requirements & Well Development, Disinfection, Pumping Equipment, and Abandonment

  • Describe development methods (surging, bailing, jetting, air lift, overpumping) and match each to the formation and screen type where it works best.

  • Write the disinfection procedure for a new well, including chlorine concentration, contact time, and how to verify the residual.

  • Explain pump selection variables (static level, drawdown, pumping rate, total dynamic head) and size a pump for a simple scenario.

  • List the steps and documentation required to abandon a well, including sealing materials and what must be recorded.

Your checkpoint

A one-page disinfection and abandonment procedure checklist plus a solved pump sizing problem showing head calculation.

Week 5

Illinois Water Well Construction Code, Licensing Rules, and Public Health Protection

  • Outline the licensing pathway in Illinois: application, examination, continuing education, and renewal requirements.

  • Summarize the enforcement and penalty provisions that apply to unlicensed practice and code violations.

  • Explain how well construction records, logs, and water quality test results feed into public health protection and reporting obligations.

  • Identify the roles of state and local health authorities and the circumstances that trigger notification.

Your checkpoint

A two-page licensing and compliance summary with a timeline of required submissions and renewals.

Week 6

Well Development, Disinfection, Pumping Equipment, and Abandonment & Illinois Water Well Construction Code, Licensing Rules, and Public Health Protection

  • Review water quality parameters commonly tested (nitrate, bacteria, arsenic, hardness) and state the action level or standard for each.

  • Describe pump installation, wiring, and pressure system components, and identify common failure modes and troubleshooting steps.

  • Explain well rehabilitation options for declining yield or water quality and when abandonment is the better choice.

  • Connect sampling and reporting requirements to the driller's recordkeeping duties under the code.

Your checkpoint

A water quality parameter table with standards and a troubleshooting matrix for five common pump and pressure system faults.

Week 7

Water Well Construction, Drilling Methods, and Equipment & Well Siting, Setback Distances, and Grouting/Sealing Requirements & Well Development, Disinfection, Pumping Equipment, and Abandonment & Illinois Water Well Construction Code, Licensing Rules, and Public Health Protection

  • Complete a timed 100-question mixed practice set and log every missed item by domain and topic.

  • Re-study the two weakest topics using the glossary, code citations, and worked calculations already built.

  • Redo all calculation problems from weeks 2 and 4 without notes and compare results to the originals.

  • Write out the setback, sealing, and disinfection requirements from memory and check against your reference tables.

Your checkpoint

A scored practice exam with an error log classifying every miss and a revised study priority list.

Week 8

Water Well Construction, Drilling Methods, and Equipment & Well Siting, Setback Distances, and Grouting/Sealing Requirements & Well Development, Disinfection, Pumping Equipment, and Abandonment & Illinois Water Well Construction Code, Licensing Rules, and Public Health Protection

  • Take a second timed practice exam and target a score improvement over week 7.

  • Review the error log and confirm every previously missed item can now be explained aloud in under a minute.

  • Recite the key numeric requirements (setbacks, grout depths, chlorine concentrations, contact times) from memory.

  • Finalize exam-day logistics: identification, testing location, permitted reference materials, and time allocation per question.

Your checkpoint

A final one-page memory sheet of numbers and procedures plus a second practice exam score at or above target.

Milestones

Week 2: Can explain the full drilling sequence for two different methods and correctly solve annular volume and grout quantity problems without notes.

Week 4: Can state setback distances and sealing requirements from memory and walk through disinfection and abandonment procedures step by step.

Week 6: Can describe the licensing pathway, reporting obligations, and water quality standards, and troubleshoot common pump faults.

Week 8: Second timed practice exam score meets or exceeds target, with no repeated errors from the week 7 error log.