Assam ASSEB HS Skill Telecom study materials
Assam ASSEB HS Skill Telecom study resources

Assam ASSEB HS Skill Telecom study plan

Assam ASSEB HS Skill Telecom · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Telecom Fundamentals and Signal Theory

  • Define and distinguish amplitude, frequency, phase, wavelength and period, computing each from a given sinusoid

  • Convert between dB, dBm and linear power ratios without a calculator for common values (3 dB, 10 dB, 20 dB)

  • Explain sampling, aliasing and the Nyquist criterion, and state why anti-aliasing filters are needed

  • Classify modulation schemes as analog (AM, FM) or digital (ASK, FSK, PSK, QAM) and sketch their constellation or waveform shape

Your checkpoint

A one-page formula and conversion sheet plus 20 self-written solved numericals on dB, wavelength and sampling, scored against a worked answer key

Week 2

Telecom Fundamentals and Signal Theory & Telecommunication Networks and Transmission Media

  • Compare twisted pair, coaxial cable, microwave radio and optical fiber on bandwidth, attenuation and noise immunity

  • Describe the structure and impedance of a coaxial cable and explain characteristic impedance matching

  • Calculate free-space path loss and received power for a simple microwave link

  • Explain noise sources (thermal, shot, interference) and compute a signal-to-noise ratio in dB

Your checkpoint

A comparison table of five transmission media with typical bandwidth, attenuation per km and application, plus three solved link-budget problems

Week 3

Telecommunication Networks and Transmission Media & Switching, Routing and Network Protocols

  • Map the OSI seven layers and TCP/IP model to concrete telecom devices and protocols

  • Differentiate circuit switching, packet switching and message switching with a latency comparison

  • Explain IPv4 addressing, subnet masks and CIDR, and subnet a /24 into four equal subnets

  • Describe the role of ARP, DHCP, DNS and ICMP in bringing up a host on a network

Your checkpoint

A layered protocol map poster and a completed subnetting worksheet with ten addresses resolved to network, broadcast and host ranges

Week 4

Switching, Routing and Network Protocols

  • Trace a call setup and release through a digital exchange, naming the signaling stages

  • Compare static and dynamic routing and describe how a routing table selects a next hop

  • Explain VLANs, NAT and the difference between a router, switch and hub in forwarding behavior

  • Identify common protocol ports and match transport protocols to their reliability guarantees

Your checkpoint

A timed 30-question mixed quiz on switching and routing, with every wrong answer rewritten as a corrected note

Week 5

Wireless and Mobile Communication Systems

  • Explain cellular concepts: frequency reuse, cell splitting, handover and co-channel interference

  • Compare FDMA, TDMA, CDMA and OFDMA in capacity and multiple-access behavior

  • Describe the GSM and LTE/LTE-Advanced architecture at block level, including core network elements

  • Relate antenna gain, beamwidth, polarization and tilt to coverage planning

Your checkpoint

A hand-drawn block diagram of GSM and LTE architectures with a written explanation of each interface, plus ten solved frequency-reuse problems

Week 6

Optical Fiber and Broadband Access Technologies & Telecom Equipment, Installation and Cabling Practice

  • Explain fiber structure, total internal reflection, numerical aperture and single-mode versus multimode trade-offs

  • Compare PON architectures (GPON, EPON) and describe FTTH, xDSL and cable broadband access options

  • List the steps and safety checks for terminating and splicing fiber, and for pulling and dressing Cat6 cable

  • Describe connector types (SC, LC, RJ45), color codes, and the test acceptance limits for each

Your checkpoint

A step-by-step installation and termination procedure for one FTTH drop and one Cat6 run, including a tool list and acceptance test checklist

Week 7

Testing, Fault Diagnosis and Maintenance & Workplace Safety, EMF Hazards and Regulatory Compliance

  • Select the correct instrument (OTDR, power meter, VSWR meter, cable tester, multimeter) for a given fault and justify the choice

  • Interpret an OTDR trace and locate a splice loss or break from the event table

  • Diagnose common faults: high bit error rate, no dial tone, intermittent link drop, earth leakage

  • State EMF exposure limits, safe working distances from antennas, and lockout/tagout and PPE rules for tower and electrical work

Your checkpoint

A fault-diagnosis decision tree covering six symptoms with the test instrument, expected reading and corrective action for each

Week 8

Telecom Services, Customer Premises and Billing & Entrepreneurship, Employability and Communication Skills

  • Explain billing components: call detail records, tariff plans, proration, taxes and dispute handling steps

  • Describe customer premises equipment responsibilities and the demarcation point between operator and customer

  • Draft a short business pitch for a local telecom installation or repair service, covering cost, pricing and target customers

  • Practice a two-minute spoken explanation of a technical fault to a non-technical customer

Your checkpoint

A complete mock customer case file: a sample bill with a disputed charge resolved in writing, plus a recorded two-minute customer explanation and a one-page service business pitch

Milestones

Week 2: Score at least 70% on a self-made 25-question test covering signal theory and transmission media, and correctly solve two of three link-budget problems without notes

Week 4: Subnet a /24 into four subnets and list all usable host ranges from memory, and score at least 75% on the 30-question switching and routing quiz

Week 6: Explain GPON versus EPON and single-mode versus multimode aloud in under five minutes each, and complete the FTTH and Cat6 procedure with all acceptance limits correct

Week 7: Correctly match six fault symptoms to instrument and corrective action, and state the safe approach distance and PPE for antenna work without reference

Week 8: Resolve the disputed bill case in writing with correct tariff and tax arithmetic, deliver the two-minute customer explanation fluently, and complete a full 60-question timed mock exam at 65% or above