Trade Safety

  • Personal protective equipment for plumbing work: safety helmet for overhead work, impact goggles when cutting or chiselling, gloves for handling cement and solvents, and safety footwear with steel toe caps on site.

  • Before entering any manhole or septic tank, test the atmosphere for oxygen, hydrogen sulphide and combustible gas; oxygen below 19.5 percent by volume means do not enter.

  • Confined-space entry requires a permit, a standby person outside, a harness with lifeline, and forced ventilation; never use a naked flame to test for gas.

  • Electrical safety rule: treat every circuit as live until isolated and tagged; use 110 V or residual current device protected tools in wet areas.

  • Excavation safety: trench sides deeper than 1.5 m require shoring, and excavated soil is stacked at least 0.6 m from the trench edge.

  • Lead and solvent hazards: lead solder fume and PVC solvent cement vapour require local exhaust ventilation and respiratory protection; keep solvents away from flame.

  • Fire classes and extinguishers: Class A solid combustibles use water, Class B flammable liquids use foam or dry powder, Class C gases use dry powder, and electrical fires use carbon dioxide.

  • Ladder rule: the 4-to-1 rule sets the base one unit out for every four units of height, and the ladder top must extend about 1 m above the landing point.

  • First aid for chemical eye splash: irrigate with clean running water for at least 15 minutes and seek medical help; for acid on skin, wash and remove contaminated clothing.

Quick reference

Tools and Equipment

  • Pipe wrench: the jaw teeth face the direction of rotation so the pull is toward the handle; a Stillson wrench grips and turns threaded pipe, while a strap wrench is used on polished or plastic pipe.

  • Pipe cutter: a wheel cutter scores and severs metal pipe; tighten the knob a quarter turn per revolution and apply cutting oil to avoid flattening the pipe end.

  • Hacksaw blade selection: 18 teeth per inch for thick metal and pipe, 24 for general work, 32 for thin-walled tube and sheet; at least three teeth must contact the work.

  • Bench vice, pipe vice and chain vice: the pipe vice holds pipe for threading and cutting, the chain vice holds large diameter pipe, and the bench vice holds small work and fittings.

  • Threading equipment: hand die stock with dies for sizes 6 mm to 50 mm, power threading machine for larger work; dies are marked with the nominal pipe size and thread standard.

  • Flaring and swaging tools are used on copper tube for flare joints and socket swages; a deburring tool removes the internal burr after cutting.

  • Level and plumb tools: spirit level checks horizontal, plumb bob or plumb rule checks vertical, and a laser level transfers levels across rooms for drainage gradients.

  • Measuring and testing equipment: steel tape for lengths, vernier caliper for outside and inside diameters, pressure gauge and hydrostatic test pump for pipeline testing.

Quick reference

Plumbing Materials

  • Galvanised iron pipe is mild steel pipe coated with zinc by hot-dip galvanising; it is used for cold water supply and is joined by threaded sockets and fittings.

  • Copper tube is classified by wall thickness: type K heavy, type L medium, type M light; it resists corrosion and is joined by soldering, brazing or compression fittings.

  • PVC is unplasticised polyvinyl chloride for cold water and drainage, CPVC is chlorinated PVC for hot water up to about 90 degrees Celsius, and UPVC is the common drainage material.

  • PPR pipes are joined by heat fusion welding with a socket fusion tool; the pipe and fitting are heated and pushed together to form a homogeneous joint.

  • Asbestos cement pipe is used for sewer and rainwater lines; cutting generates dust that is a health hazard and requires wet cutting and respiratory protection.

  • Cast iron soil pipe is joined with lead and oakum in traditional work, or with rubber gaskets in modern hubless couplings for soil and waste stacks.

  • Material selection rule: use GI or copper for hot water and exposed lines, PVC or UPVC for buried drainage, and PPR or CPVC where hot water and plastic economy are both required.

  • Valves and fittings: gate valve for on-off isolation, globe valve for throttling, ball valve for quick quarter-turn isolation, check valve for preventing backflow, and air release valve at high points.

Quick reference

Pipes and Fittings

  • Nominal bore is the approximate internal diameter used to designate pipe size; a 25 mm nominal bore GI pipe has an outside diameter of about 33.4 mm.

  • Pipe schedule numbers, such as schedule 40 and schedule 80, indicate wall thickness for a given nominal size; a higher schedule number means a thicker wall and higher pressure rating.

  • Elbow fittings are named by the angle of deflection: 90 degree elbow, 45 degree elbow, and 22.5 degree elbow; a street elbow has one male and one female end.

  • A tee has three openings: equal tee has all outlets the same size, reducing tee has one branch smaller; a cross has four openings.

  • A reducer connects two different pipe sizes: concentric reducer is centred for vertical runs, eccentric reducer is offset for horizontal runs to avoid air pockets.

  • A union is a three-part fitting that allows a pipe to be disconnected without cutting; a coupling is a simple sleeve joining two pipes of the same size.

  • A cap closes a pipe end permanently, a plug closes a threaded opening, a nipple is a short length of pipe threaded at both ends, and a bushing reduces a threaded opening.

  • Bend radius rule: a long radius elbow has a centre-to-face dimension of 1.5 times the nominal diameter, a short radius elbow is 1.0 times the nominal diameter.

Quick reference

Hand Tools

  • Pipe wrench sizing: an 18 inch wrench suits pipe up to 50 mm nominal bore, a 24 inch wrench up to 65 mm, and a 36 inch wrench up to 100 mm; never use a pipe on the handle as a cheater bar.

  • Adjust the pipe wrench jaw to the pipe before applying force, and pull rather than push so that the load is taken toward the handle.

  • Files are graded by cut: single cut for sharpening and finishing, double cut for rapid metal removal; a bastard file is coarser than a second cut file.

  • Chisels and hammers: a cold chisel cuts metal and is held at about 45 degrees; a ball pein hammer is the standard for metalwork and centre punching.

  • Screwdriver rule: the blade tip must match the slot width and thickness; a Phillips driver is chosen by point size, and a Pozidriv has extra cross marks.

  • Spanners: open-end for two-point access, ring or box for full grip, adjustable wrench for odd sizes; the correct size is the one that fits the nut flats fully.

  • Tin snips: straight cut snips for straight lines, aviation snips with colour coding, left cutting and right cutting, for curves in sheet metal.

  • Tool care rule: wipe tools after use, oil the adjusting screw of a pipe wrench, keep files clean with a file card, and never use a file without a handle.

Quick reference

Measuring and Cutting Operations

  • Steel tape and folding rule measure lengths; record pipe lengths as centre-to-centre or end-to-end and state which, because fitting allowances differ.

  • Fitting allowance formula: cut length equals centre-to-centre distance minus the sum of the fitting take-outs at each end; take-out is the distance the pipe inserts into the fitting.

  • For a 90 degree elbow, the take-out equals the centre-to-face dimension of the elbow, which is 1.5 times nominal diameter for a long radius elbow.

  • Marking rule: use a scriber or fine marker and a try square to mark a square cut line all round the pipe; wrap a paper strip or use a pipe wrap for a true circumference line.

  • Cutting with a hacksaw: clamp the pipe in a vice, cut on the waste side of the line, keep the blade square and use full strokes with light pressure.

  • Cutting with a pipe cutter: rotate the cutter around the pipe, tighten a quarter turn each revolution, and ream the inside burr after cutting.

  • Plastic pipe cutting: use a plastic pipe cutter or fine-tooth saw, cut square, remove burrs with a deburring tool, and mark the insertion depth equal to the socket depth.

  • Threading operation: chamfer the pipe end, clamp in a pipe vice, apply cutting oil, cut the thread with a die, and check with a thread gauge; the thread should have about 2 to 3 exposed threads when tight.

Quick reference

Pipe Joining Methods and Jointing Techniques

  • Threaded joint procedure: cut and ream the pipe, cut the thread, clean with a wire brush, apply jointing compound or PTFE tape to the male thread only, and tighten with a pipe wrench.

  • PTFE tape is wound clockwise around the male thread, in the direction of tightening, about three turns, leaving the first thread bare.

  • Solvent cement joint for PVC: clean the pipe and socket, apply primer, apply cement to both surfaces, insert with a quarter turn, hold for about 30 seconds, and allow full cure before pressure testing.

  • Soldered copper joint: clean the tube and fitting to bright metal, apply flux, heat the fitting evenly with a torch, and feed solder into the joint gap until a ring appears.

  • Compression joint: slide the nut and olive onto the tube, insert the tube fully into the fitting, and tighten the nut about one and a quarter turns by hand plus a spanner; do not overtighten the olive.

  • Push-fit joint: mark the insertion depth, cut square and deburr, push the pipe past the grab ring until it seats, and use the manufacturer's locking clip or release tool for demounting.

  • Flanged joint: use a gasket between flanges, align the bolt holes, insert bolts and tighten in a diagonal or star pattern in stages to avoid uneven gasket loading.

  • Welded and brazed joints: brazing uses a filler melting above 450 degrees Celsius with capillary action, while fusion welding of PPR uses a heated socket and spigot to melt and fuse the surfaces.

Quick reference

Water Supply Systems and Plumbing Layouts

  • Direct supply system delivers mains water straight to fixtures; indirect supply system stores water in an underground tank and an overhead tank and then distributes by gravity.

  • Overhead tank height rule: the tank must give a minimum head of about 2 to 3 m above the highest fixture for adequate pressure at the top floor.

  • Distribution layouts: the tree or branch system runs a main with branches, the loop or ring system feeds each fixture from two directions, and the upfeed and downfeed systems differ in whether supply rises or falls to fixtures.

  • Pipe sizing rule: cold water branch to a wash basin about 15 mm, to a water closet about 15 mm, to a kitchen sink about 15 mm, and the main riser sized from the total fixture loading units.

  • Fixture unit method: each fixture is assigned loading units, for example a water closet about 3 units and a wash basin about 1 unit, and the total selects the pipe size from a sizing table.

  • Air lock prevention: slope horizontal supply pipes slightly upward toward the air release point, avoid sharp dips, and fit air release valves at high points of the line.

  • Backflow prevention: provide an air gap between a tap and the fixture rim, fit a check valve or vacuum breaker where a hose connection may be submerged.

  • Testing rule: a new water supply line is hydrostatically tested at about 1.5 times the working pressure, or a minimum of 10 bar for a period of at least one hour, with no drop in pressure.

Quick reference

Sanitary Fixtures

  • Water closet types: the wash-down WC has a shallow trap and a visible water surface, the siphon wash-down uses a jet to flush, and the one-piece WC has the tank integral with the bowl.

  • Flush tank mechanism: a ball float or float valve controls the inlet, a flush valve or siphon controls the outlet, and the overflow pipe discharges above the floor level.

  • Wash basin: fitted with a 32 mm or 40 mm waste outlet, a basin trap, and an overflow; the rim must be at about 780 to 800 mm above finished floor level.

  • Kitchen sink: standard size about 600 x 450 x 200 mm, supplied with a 40 mm waste coupling, a sink trap, and a tap with a minimum 15 mm supply.

  • Floor trap or nahani trap: a gully trap with a water seal of about 50 mm prevents sewer gas entry; it is placed at the lowest point of a wet area floor.

  • Water seal depth rule: traps must retain a water seal of at least 50 mm; a P-trap or S-trap under a fixture must be accessible for cleaning.

  • Bidet and urinal: a urinal is fitted with a flush valve or cistern and a 40 mm waste; a bidet requires a 15 mm supply and a 40 mm waste with a trap.

  • Fixing heights: WC pan top about 400 mm, wash basin rim about 780 mm, and shower head about 2000 mm above finished floor level.

Quick reference

Drainage and Sewerage

  • Drainage gradient rule: a 100 mm soil pipe is laid at about 1 in 60 to 1 in 80 fall, while a 150 mm sewer uses about 1 in 100 to 1 in 150, so that flow velocity reaches about 0.6 to 0.9 m per second.

  • Self-cleansing velocity is the minimum flow velocity that keeps solids moving, about 0.6 m per second; the maximum permissible velocity is about 3 m per second to avoid pipe erosion.

  • Separate system carries sewage and rainwater in separate pipes; combined system carries both in one sewer; the partially separate system takes rainwater from roofs separately and surface water with sewage.

  • House drain components: soil pipe carries human waste from WCs, waste pipe carries sullage from sinks and basins, vent pipe equalises pressure, and rainwater pipe carries roof water.

  • Two-pipe system provides separate soil and waste stacks with separate vents; the one-pipe system collects soil and waste in one stack with a vent pipe, and the single-stack system uses one pipe with a vent.

  • Manhole spacing rule: manholes are provided at every change of direction, gradient or diameter, at junctions, and at intervals of about 45 m for 300 mm sewers.

  • Inspection chamber and gully trap: an inspection chamber gives access for rodding, and a gully trap receives waste water from floors and sinks before it enters the sewer.

  • Ventilation rule: the drain must be ventilated by a vent pipe carried above roof level, and anti-siphon or vent pipes prevent trap seal loss from pressure changes.

Quick reference

Plumbing Repairs, Maintenance and Fault Finding

  • Leaking tap diagnosis: water drips from the spout means a worn washer or ceramic cartridge; water leaks from the spindle means a worn gland packing or O-ring.

  • Ball valve fault: water overflows into the WC pan means the float valve is not shutting off, caused by a worn washer, a punctured float, or a misadjusted float arm.

  • No water at a tap: check the isolation valve and stop cock first, then check for an air lock, a blocked aerator, or a frozen or damaged line.

  • Gurgling or slow drainage in a fixture usually indicates a partially blocked trap or waste pipe, or a blocked vent causing trap seal siphonage.

  • Sewer odour indoors points to a dry trap, a broken or disconnected vent, a leaking soil pipe joint, or a faulty floor trap seal; pour water into unused traps first.

  • Low water pressure causes include a choked aerator, scale in galvanised pipes, a partially closed valve, undersized pipe, or insufficient overhead tank head.

  • Hydrostatic test method: isolate the section, fill with water, expel air, pressurise with a test pump, and observe the gauge; a falling gauge indicates a leak in the tested section.

  • Smoke or water test for drains: a smoke test locates leaks in the soil system, and a water or air test is used to check drain joints before backfilling.

Quick reference

Employability Skills

  • Communication sequence for a job: listen to the customer, restate the requirement, confirm the measurement and material, and record the agreed price and time before starting work.

  • Resume essentials for a plumber: name and contact, trade qualification such as NSQF level, list of skills including pipe fitting and fixture installation, and work experience with dates.

  • Interview preparation: know your trade terms, be ready to describe a recent job step by step, and carry certificates and a small portfolio of work photographs.

  • Workplace documents: a job card records the work done, a material requisition requests stores, an invoice bills the customer, and a measurement sheet records quantities for payment.

  • Digital skills: use a smartphone for measurement photographs, customer contact, digital payment, and reading manufacturer installation instructions or QR codes on fittings.

  • Teamwork on site: coordinate with masons before pipe chasing, with electricians before concealed conduit work, and with painters after fixture installation.

  • Time and cost control: estimate material quantity from drawings, add a wastage allowance of about 5 to 10 percent, and record daily progress against the schedule.

  • Safety and rights at work: a worker is entitled to a safe workplace, protective equipment, minimum wages, and timely payment; report unsafe conditions to the supervisor.

Quick reference

Work Ethics and Entrepreneurship

  • Professional ethics in plumbing: quote honestly, use the specified material grade, do not conceal defects, complete the agreed scope, and give a written warranty period for the work.

  • Customer relations rule: keep the work area clean, protect the customer's property, explain the fault in plain language, and provide a written bill with itemised materials and labour.

  • Pricing method: total cost equals material cost plus labour cost plus overheads plus profit margin; a typical small contractor adds 10 to 20 percent overhead and 10 to 15 percent profit.

  • Business registration: a small plumbing enterprise may register as a proprietorship, partnership or company, obtain a GST registration where turnover crosses the threshold, and hold a shop and establishment licence.

  • Quotation contents: scope of work, material brand and grade, quantity, rate, total amount, time schedule, payment terms, and validity period of the quotation.

  • Record keeping: maintain a cash book, purchase bills, a wage register, and a job register; these support tax filing, bank loans and warranty claims.

  • Marketing for a plumbing business: register on local service platforms, keep a photograph portfolio, collect customer references, and display licence and qualification.

  • Warranty and complaint handling: respond to a complaint within the agreed time, rectify defects at no charge within the warranty period, and record the complaint and action taken.

  • Risk and contract: take an advance for material, use a written work order for large jobs, and insure against third-party damage and worker injury where required.

Quick reference

Hand Tools

  • A pipe wrench is sized by handle length in inches; the jaw teeth must point in the direction of rotation so that the pull is toward the handle.

  • A hacksaw uses 18 teeth per inch for pipe and thick metal, 24 for general work, and 32 for thin tube and sheet; at least three teeth should be in contact with the work.

  • A pipe cutter has a cutting wheel, two guide rollers and an adjusting knob; tighten the knob about a quarter turn per revolution and use cutting oil.

  • A file card cleans file teeth; a file must have a handle fitted and must be used with forward pressure on the forward stroke only.

  • A cold chisel is held at about 45 degrees to the work and struck with a ball pein hammer; wear goggles because chips fly.

  • A try square checks squareness of cut ends and marked lines; a spirit level checks horizontal and a plumb rule checks vertical alignment.

  • A spanner must fit the nut flats fully; an adjustable wrench is set to the nut size and pulled toward the fixed jaw.

  • A screwdriver blade must match the slot width and thickness; a Phillips driver is selected by point size and a Pozidriv has extra cross marks.

Quick reference

Measuring and Cutting Operations

  • Cut length equals centre-to-centre length minus the sum of fitting take-outs at both ends; take-out is the depth the pipe enters the fitting.

  • A 90 degree long radius elbow take-out equals 1.5 times the nominal pipe diameter; a short radius elbow take-out equals 1.0 times the nominal diameter.

  • Mark a square cut line with a try square or a pipe wrap; a paper strip wrapped around the pipe gives a true circumference line.

  • Cut on the waste side of the marked line; after cutting, ream the internal burr with a deburring tool or half-round file.

  • For plastic pipe, mark the socket depth on the pipe before jointing and cut square with a plastic pipe cutter or fine-tooth saw.

  • Thread length rule: after tightening, about 2 to 3 threads should remain exposed; a thread gauge checks the thread form and pitch.

  • Steel tape and folding rule measure lengths; a vernier caliper measures outside and inside diameter, and a micrometer measures wall thickness.

  • Drainage gradient is measured with a spirit level and a straight edge; a fall of 1 in 60 means 1 unit drop for every 60 units of run.

Quick reference

Pipe Joining Methods and Jointing Techniques

  • Threaded joint: clean the male thread, apply PTFE tape clockwise in the tightening direction or jointing compound, and tighten with a pipe wrench until about 2 to 3 threads remain exposed.

  • Solvent cement joint: clean and prime both surfaces, apply cement to pipe and socket, insert with a quarter turn, hold about 30 seconds, and cure before testing.

  • Soldered copper joint: clean to bright metal, apply flux, heat the fitting evenly, and feed solder into the gap until a ring shows at the mouth of the fitting.

  • Compression joint: slide the nut and olive onto the tube, insert the tube fully, and tighten the nut hand tight plus about one and a quarter turns with a spanner.

  • Push-fit joint: cut square, deburr, mark insertion depth, push past the grab ring until seated, and fit the locking clip; use a release tool to demount.

  • Flanged joint: align the bolt holes, insert the gasket, and tighten bolts in a diagonal star pattern in stages to load the gasket evenly.

  • PPR fusion joint: heat the pipe and fitting on the fusion tool at the set temperature and time, then push together without twisting and hold until set.

  • Brazing uses a filler that melts above 450 degrees Celsius and flows by capillary action; soldering uses a filler melting below that temperature.

Quick reference

Water Supply Systems and Plumbing Layouts

  • Direct supply feeds fixtures from the mains; indirect supply stores water in an underground tank and an overhead tank and distributes by gravity.

  • The overhead tank must give a minimum head of about 2 to 3 m above the highest fixture to produce adequate pressure at the top floor.

  • Distribution layouts: tree or branch system, loop or ring system, upfeed system and downfeed system; the loop system gives more uniform pressure at fixtures.

  • Fixture unit method assigns loading units to fixtures, such as about 3 units for a water closet and about 1 unit for a wash basin, and the total selects the pipe size.

  • Common branch sizes: 15 mm for a wash basin, water closet or kitchen sink supply; the main riser is sized from the total fixture units.

  • Air lock prevention: avoid dips in horizontal supply pipes, slope slightly toward an air release point, and fit air release valves at high points.

  • Backflow prevention: keep an air gap between the tap and the fixture rim and fit a check valve or vacuum breaker on hose connections.

  • Hydrostatic test: test new supply lines at about 1.5 times working pressure with a minimum of 10 bar for at least one hour with no pressure drop.

Quick reference

Sanitary Fixtures

  • Water closet types include wash-down, siphon wash-down and one-piece; the wash-down has a shallow trap and a visible water surface.

  • Flush tank parts: float valve controls inlet, siphon or flush valve controls outlet, and the overflow discharges above floor level.

  • Wash basin: 32 mm or 40 mm waste outlet, basin trap and overflow; rim height about 780 to 800 mm above finished floor.

  • Kitchen sink: about 600 x 450 x 200 mm, with a 40 mm waste coupling, sink trap and a 15 mm supply tap.

  • Floor trap or gully trap: retains a water seal of at least 50 mm to prevent sewer gas entry and is placed at the lowest point of a wet floor.

  • Fixing heights: WC pan top about 400 mm, wash basin rim about 780 mm, and shower head about 2000 mm above finished floor level.

  • Urinal: fitted with a flush valve or cistern and a 40 mm waste; a bidet needs a 15 mm supply and a 40 mm trapped waste.

  • Trap rule: every fixture must have a trap with a water seal of at least 50 mm, and the trap must be accessible for cleaning.

Quick reference

Drainage and Sewerage

  • Drainage gradient: a 100 mm soil pipe is laid at about 1 in 60 to 1 in 80, and a 150 mm sewer at about 1 in 100 to 1 in 150.

  • Self-cleansing velocity is about 0.6 m per second minimum, and the maximum permissible velocity is about 3 m per second.

  • Separate system carries sewage and rainwater in separate pipes; combined system carries both in one sewer; partially separate takes roof water separately.

  • Soil pipe carries human waste from WCs, waste pipe carries sullage from sinks and basins, vent pipe equalises pressure, and rainwater pipe carries roof water.

  • One-pipe system collects soil and waste in one stack with a vent; two-pipe system uses separate soil and waste stacks; single-stack uses one pipe with a vent.

  • Manholes are provided at every change of direction, gradient or diameter, at junctions, and at intervals of about 45 m for a 300 mm sewer.

  • Inspection chamber gives access for rodding; a gully trap receives floor and sink waste before it enters the sewer.

  • Vent pipe must be carried above roof level to ventilate the drain, and anti-siphon pipes prevent trap seal loss from pressure changes.

Quick reference

Plumbing Repairs, Maintenance and Fault Finding

  • Dripping tap from the spout indicates a worn washer or ceramic cartridge; leakage at the spindle indicates worn gland packing or an O-ring.

  • Water overflowing into the WC pan indicates the float valve is not shutting off, caused by a worn washer, punctured float or misadjusted float arm.

  • No water at a tap: check the stop cock and isolation valve first, then an air lock, a blocked aerator, or a frozen or damaged line.

  • Gurgling or slow drainage indicates a partially blocked trap or waste pipe, or a blocked vent causing trap seal siphonage.

  • Sewer odour indoors points to a dry trap, a broken vent, a leaking soil joint or a faulty floor trap seal; pour water into unused traps first.

  • Low pressure causes include a choked aerator, scale in galvanised pipes, a partly closed valve, undersized pipe, or insufficient tank head.

  • Hydrostatic test: isolate the section, fill and expel air, pressurise with a test pump, and observe the gauge; a falling gauge indicates a leak.

  • Smoke test locates leaks in the soil system, and a water or air test checks drain joints before backfilling.

Quick reference

Employability Skills

  • Job communication sequence: listen, restate the requirement, confirm measurement and material, and record the agreed price and time before starting.

  • Resume essentials: contact details, NSQF trade qualification, skill list including pipe fitting and fixture installation, and dated work experience.

  • Interview preparation: know trade terms, describe a recent job step by step, and carry certificates and work photographs.

  • Workplace documents: job card records work done, material requisition requests stores, invoice bills the customer, and measurement sheet records quantities for payment.

  • Digital skills: use a smartphone for measurement photographs, customer contact, digital payment, and reading manufacturer instructions or QR codes on fittings.

  • Site coordination: work with masons before pipe chasing, with electricians before concealed conduit work, and with painters after fixture installation.

  • Time and cost control: estimate material from drawings, add about 5 to 10 percent wastage, and record daily progress against the schedule.

  • Worker rights: entitlement to a safe workplace, protective equipment, minimum wages and timely payment; report unsafe conditions to the supervisor.

Quick reference

Work Ethics and Entrepreneurship

  • Professional ethics: quote honestly, use the specified material grade, do not conceal defects, complete the agreed scope, and give a written warranty period.

  • Customer relations: keep the work area clean, protect the customer's property, explain the fault plainly, and give a written itemised bill.

  • Pricing method: total cost equals material plus labour plus overheads plus profit; a small contractor adds about 10 to 20 percent overhead and 10 to 15 percent profit.

  • Business registration: proprietorship, partnership or company, GST registration where turnover crosses the threshold, and a shop and establishment licence.

  • Quotation contents: scope, material brand and grade, quantity, rate, total, time schedule, payment terms, and validity period.

  • Record keeping: cash book, purchase bills, wage register and job register support tax filing, bank loans and warranty claims.

  • Marketing: register on local service platforms, keep a photograph portfolio, collect customer references, and display licence and qualification.

  • Warranty handling: respond to a complaint within the agreed time, rectify defects free within warranty, and record the complaint and action taken.

  • Risk and contract: take an advance for material, use a written work order for large jobs, and insure against third-party damage and worker injury.