Odisha CHSE +2 Vocational Building Maintenance study materials
Odisha CHSE +2 Vocational Building Maintenance study resources

Odisha CHSE +2 Vocational Building Maintenance study plan

Odisha CHSE +2 Vocational Building Maintenance · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Building Materials and Construction Basics

  • Classify the physical properties (density, porosity, water absorption, thermal conductivity, soundness) of the main construction materials - bricks, stones, cement, sand, timber, steel and concrete - in a hand-drawn comparison table.

  • Explain the manufacturing process and field identification tests for ordinary Portland cement, including how to check colour, fineness, setting behaviour and lump formation without a laboratory.

  • Describe the classification, standard dimensions and quality tests (frog, soundness, water absorption, efflorescence) of burnt clay bricks and how to reject a bad consignment on site.

  • Outline the functions of the main building components - foundation, plinth, wall, beam, slab, roof, parapet - and the sequence in which a small residential building is constructed from excavation to finishing.

  • Distinguish between shallow and deep foundations and state which soil conditions require each, with at least three site indicators for weak soil.

Your checkpoint

A one-page hand-drawn building section labelled with every major component plus a 20-term materials glossary written in your own words.

Week 2

Building Materials and Construction Basics & Estimation, Costing and Work Measurement

  • Calculate the number of bricks required per cubic metre of brickwork and per square metre of a 230 mm wall, and verify the result against the standard thumb rule.

  • Compute cement, sand and coarse aggregate quantities for nominal concrete mixes (1:1.5:3, 1:2:4, 1:3:6) for a stated volume, including the dry-volume factor.

  • Prepare a quantity estimate for a small room - brickwork, plaster, flooring and concrete slab - using the centre-line or long-wall short-wall method.

  • Explain how rates are built up from material cost, labour cost, tools and plant, overheads and contractor profit, and prepare a simple rate analysis for 1 cubic metre of brickwork.

  • List and define the standard units of measurement used in building work (cubic metre, square metre, running metre, quintal, number) for at least eight items of work.

Your checkpoint

A handwritten estimate sheet for one 3 m × 4 m room covering brickwork, plaster and floor, with quantities and costs totalling correctly.

Week 3

Masonry, Plastering and Finishing Works

  • Identify the standard masonry bonds (English, Flemish, stretcher, header, rat-trap) in a sketch and state where each is used and why.

  • Describe the correct procedure for laying a brick wall: soaking bricks, mortar consistency, frog orientation, joint thickness, plumb and level checks, and curing.

  • Explain the purpose of each plaster coat - backing coat and finishing coat - and specify the correct mortar mixes for internal and external plaster on brick and concrete surfaces.

  • Diagnose common plaster defects (cracks, crazing, blistering, efflorescence, hollowness, uneven surface) and state one corrective action for each.

  • Describe the sequence of finishing operations - curing, POP or putty application, sanding and surface preparation - before painting a new plastered wall.

Your checkpoint

A defect-diagnosis chart listing at least eight plaster or masonry defects with cause, prevention and repair, prepared from memory without notes.

Week 4

Plumbing, Sanitary Fittings and Drainage

  • Trace the path of water from the overhead tank to a tap and of waste from a fixture to the sewer, naming every pipe, fitting and trap on the way.

  • Distinguish between the two-pipe and single-pipe plumbing systems and state the venting requirements that keep water seals intact.

  • Explain the purpose, types and correct positioning of traps (P, S, Q, bottle) and the role of the gully trap and inspection chamber in a drainage line.

  • Identify common sanitary fittings - wash basin, water closet, cistern, floor trap, bib cock, stop cock - and state the standard height or position at which each is installed.

  • List at least six causes of blocked or leaking drainage and describe the maintenance response for each, including when to call for jetting or excavation.

Your checkpoint

A labelled schematic of the water supply and drainage layout for one toilet block, drawn from memory, with pipe sizes and fitting positions marked.

Week 5

Electrical Installations and Safety in Buildings

  • Identify the components of a domestic wiring circuit - service entrance, energy meter, main switch, distribution board, MCB, earth wire, sub-circuits - and explain each one's function.

  • Distinguish between earthing and grounding practice, describe pipe and plate earthing, and explain why an earth wire must never be fused or switched.

  • Explain the working of MCB, ELCB and RCCB and state which one protects against earth leakage and which against overload and short circuit.

  • Specify the correct wire size and circuit rating for lighting, socket and power circuits, and describe how to test a circuit safely before energising it.

  • Apply electrical safety rules on site: lockout before work, no work on live lines, correct use of tester and multimeter, and safe response to a shock or electrical fire.

Your checkpoint

A single-line wiring diagram of a two-bedroom house showing the distribution board, sub-circuits, MCB ratings and earthing, with a written safety checklist of ten rules.

Week 6

Carpentry, Doors, Windows and Joinery & Painting, Varnishing and Surface Protection

  • Identify common carpentry hand tools and power tools and state the correct use and maintenance of each, including sharpening and safe storage.

  • Describe the standard door frame and shutter construction, including sizes, section dimensions, holdfast fixing and the clearance required for the shutter to swing freely.

  • Explain the joinery terms - mortise and tenon, dovetail, halving, housing - and match each joint to a suitable application in doors, windows and furniture.

  • Specify the surface preparation and number of coats required for painting on new wood, new plaster, old painted surfaces and metal, and select an appropriate paint type for each.

  • Explain the difference between paint, varnish, lacquer and polish, and describe the correct application of varnish on wood including sanding between coats.

Your checkpoint

A reference card of eight joinery joints drawn and labelled, plus a paint and varnish schedule for one room stating surface, preparation, primer, coats and finish.

Week 7

Maintenance, Repair and Renovation Techniques

  • Assess the condition of a building systematically - cracks, dampness, settlement, corrosion, roof leakage - and record findings in a simple inspection format.

  • Distinguish between structural and non-structural cracks and classify at least five crack patterns by their likely cause.

  • Describe the repair sequence for common defects: crack stitching and grouting, damp-proof course renewal, re-plastering, waterproofing of roofs and terraces, and treatment of rising damp.

  • Explain the procedure for renovating a room - stripping finishes, checking services, re-plastering, re-wiring, re-flooring and repainting - in the correct order.

  • Prepare a preventive maintenance calendar for a residential building covering at least eight routine tasks with their frequency.

Your checkpoint

A completed mock inspection report for one real or imagined building listing at least ten observed defects with cause, repair method and priority.

Week 8

Workplace Safety, Tools, Equipment and Environmental Practices & Estimation, Costing and Work Measurement & Building Materials and Construction Basics & Masonry, Plastering and Finishing Works & Plumbing, Sanitary Fittings and Drainage & Electrical Installations and Safety in Buildings & Carpentry, Doors, Windows and Joinery & Painting, Varnishing and Surface Protection & Maintenance, Repair and Renovation Techniques

  • Demonstrate correct selection, inspection and safe use of personal protective equipment and hand tools for masonry, plumbing, electrical and carpentry tasks.

  • Explain safe scaffolding and ladder practice, excavation safety, and the correct handling and storage of cement, paint and solvents to prevent accidents and environmental harm.

  • Describe waste segregation on a construction site and the safe disposal or recycling route for debris, empty paint containers, solvent residue and electrical waste.

  • Revise the highest-weight domains by re-solving one worked numerical problem each in estimation, concrete mix quantity and brickwork quantity under timed conditions.

  • Complete at least two full-length timed mock tests and analyse every wrong answer to identify the underlying concept gap.

Your checkpoint

A two-hour timed mock test scored and fully reviewed, plus a one-page personal safety and environmental practice checklist for a small site.

Milestones

Week 2: You can compute brick, mortar and concrete quantities for a small room from memory and your estimate sheet totals without arithmetic error.

Week 4: You can draw the supply and drainage schematic for a toilet block unaided and name every trap, fitting and pipe size on it.

Week 6: You can explain the full wiring layout of a house, including earthing and protective devices, and match eight joinery joints and four paint systems to their applications.

Week 8: You score at least 60 percent on a full-length timed mock test and can state the cause and repair for ten common building defects without notes.