CIL MT study materials
CIL MT study resources

CIL MT case studies

CIL MT · Put your knowledge to work in context.

Coal India Limited's Management Trainee (MT) recruitment is the main entry route into executive-cadre roles at CIL and its subsidiaries. It is aimed at graduates - most commonly in engineering disciplines such as Mining, Electrical, Mechanical, Civil and Chemical, and in Geology, Finance, HR and Marketing - who are starting a career rather than mid-career professionals. The CIL MT case studies are 5 cases and about 3,193 words.

1

Model Code in Force: What Can Still Be Done

On 5 March a general election is announced and the Model Code of Conduct takes effect in District X. On 12 March the executive engineer reports that a piped-water scheme funded under a centrally sponsored mission is 96% complete: 1,180 of 1,240 households already have functional taps, and the balance work needs nine days.

633 words, about 3 min
2

Sequencing Four Track Blocks on a Single Line

A single-line section between two stations must absorb four maintenance blocks - W, X, Y and Z - each occupying the section exclusively, one at a time, within one eight-hour window. Three planning rules are in force.

576 words, about 3 min
3

Diesel or Electric: A Bus Fleet Decision

A state transport corporation must replace 40 ageing city buses. A diesel bus costs Rs 42 lakh and returns 4.5 km per litre at Rs 90 per litre.

635 words, about 3 min
4

Tightening a Leave Circular Before Issue

The personnel department has drafted a circular on earned leave and three sentences are drawing complaints. (a) 'Employees who have not availed leave may apply before 31 March or their leave will lapse.' (b) 'The competent authority may reject any application without assigning reasons, if deemed necessary.' (c) 'It is hereby informed that the records pertaining to leave of all employees are being verified by the section and employees are requested to kindly cooperate in the matter.' The union has objected to (b).

635 words, about 3 min
5

A Gassy Development Panel: Airflow Against Target

A bord-and-pillar development panel in a 2.8 m thick seam is advancing at 60 m a month with a continuous miner. Measured airflow in the general body at the last-cut through is 28 m3/s.

714 words, about 4 min