DGS GP Rating Exit Exam study materials
DGS GP Rating Exit Exam study resources

DGS GP Rating Exit Exam: Marine Engineering and Ship Machinery

DGS GP Rating Exit Exam · Work through your exam, one topic at a time.

All guide sections

Marine Engineering and Ship Machinery

Scope

Marine Engineering and Ship Machinery tests the main propulsion plant, auxiliaries, pumps, boilers, fuel and lubricating oil systems, cooling, watchkeeping parameters and pollution-prevention equipment. The rating must recognise normal readings and act on abnormal ones.

Core rules

  • A two-stroke slow-speed main engine uses scavenging and a turbocharger; starting air turns the engine before fuel is admitted.
  • Jacket-water cooling removes heat from liners and heads; lubricating oil reduces friction and carries heat away.
  • Fuel purifiers remove water and solids; the oily-water separator must alarm at 15 ppm and stop overboard discharge above that limit.
  • Boiler safety valves, low-water alarms and flame failure trips must never be isolated.
  • UMS alarms and dead-man alarms must be tested at the required intervals and never bypassed.

Worked example

An engine develops 8,000 kW at a specific fuel consumption of 180 g/kWh. Daily fuel use is 8,000 × 180 = 1,440,000 g/h = 1,440 kg/h. Over 24 hours: 1,440 × 24 = 34,560 kg, or 34.56 tonnes per day. Add a margin only if the question asks for it.

Traps

Mixing fuel-oil and lubricating-oil figures, treating the 15 ppm alarm as a target rather than a limit, and running a boiler with a low-water condition are serious errors. Also check units: g/kWh, kg/h and t/day are different.