GATE BM flashcards
GATE BM · Build recall with a focused review session.
33 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Michaelis constant Km
- The substrate concentration at which an enzyme-catalyzed reaction proceeds at half its maximum velocity (Vmax/2). It indicates enzyme affinity: lower Km means higher affinity for substrate.
- Competitive inhibition
- An inhibitor binds reversibly to the enzyme active site, competing with substrate. It increases apparent Km but leaves Vmax unchanged; can be overcome by raising substrate concentration.
- Polymerase chain reaction
- In vitro DNA amplification using thermal cycling: denaturation, primer annealing, and extension by a thermostable DNA polymerase. Product doubles each cycle, giving exponential amplification.
- Hybridoma technology
- Fusion of an antibody-producing B cell with an immortal myeloma cell to create a hybridoma that secretes monoclonal antibodies indefinitely. Selection is done in HAT medium.
- CRISPR-Cas9 mechanism
- A guide RNA base-pairs with target DNA and directs the Cas9 nuclease to create a double-strand break. Repair by NHEJ causes knockouts; HDR with a template enables knock-ins.
- Restriction enzyme Type II
- Recognizes a specific palindromic DNA sequence and cleaves within or near it, producing sticky or blunt ends. Widely used in cloning because cleavage is sequence-specific and predictable.
- BOD and ultimate BOD
- Biochemical oxygen demand measures oxygen consumed by microbes decomposing organic matter. BOD_t = L0(1 − e^(−kt)), where L0 is ultimate BOD and k is the deoxygenation constant.
- Effective stress principle
- Total stress σ equals effective stress σ' plus pore water pressure u: σ' = σ − u. Effective stress controls soil strength, compressibility, and volume change in saturated soils.
- Proctor compaction test
- Laboratory test relating dry unit weight to moisture content for a given compactive effort. Yields maximum dry unit weight and optimum moisture content; higher effort raises maximum dry density.
- Rational method runoff
- Peak runoff Q = C i A, where C is runoff coefficient, i is rainfall intensity, and A is catchment area. Used for small urban catchments; assumes uniform rainfall and linear response.
- Unit hydrograph
- Direct runoff hydrograph resulting from one unit of effective rainfall uniformly distributed over a catchment in a specified duration. Assumes linearity and time invariance for superposition.
- Master theorem
- Solves recurrences T(n)=aT(n/b)+f(n) by comparing f(n) with n^(log_b a). If f(n)=Θ(n^(log_b a) log^k n), then T(n)=Θ(n^(log_b a) log^(k+1) n).
- NP-complete problem
- A decision problem in NP to which every NP problem reduces in polynomial time. If any NP-complete problem has a polynomial algorithm, then P = NP. SAT is the canonical example.
- TCP three-way handshake
- Connection setup: client sends SYN, server replies SYN-ACK, client sends ACK. Establishes sequence numbers and confirms both sides are ready before data transfer begins.
- Deadlock conditions
- Four necessary conditions: mutual exclusion, hold and wait, no preemption, and circular wait. Deadlock prevention breaks at least one; avoidance uses the Banker's algorithm.
- Belady's anomaly
- In FIFO page replacement, increasing the number of page frames can increase the number of page faults. LRU and optimal replacement do not exhibit this anomaly.
- IEEE 754 single precision
- 32-bit floating-point format: 1 sign bit, 8 exponent bits with bias 127, and 23 fraction bits. Represents normalized numbers, denormals, infinity, and NaN with special exponent patterns.
- Thevenin's theorem
- Any linear two-terminal network can be replaced by an equivalent voltage source V_th in series with resistance R_th. V_th is open-circuit voltage; R_th is equivalent resistance with sources dead.
- Induction motor slip
- Slip s = (N_s − N_r)/N_s, where N_s is synchronous speed and N_r is rotor speed. Rotor frequency equals s times supply frequency; slip increases with load.
- Symmetrical components
- Unbalanced three-phase quantities decomposed into positive, negative, and zero sequence sets. Used for fault analysis; zero-sequence currents require a return path such as neutral or ground.
- Per-unit system
- Normalizes electrical quantities by base values: per-unit = actual/base. Base impedance Z_base = V_base^2/S_base. Simplifies transformer and power system calculations across voltage levels.
- Second-order overshoot
- Percent overshoot = 100 e^(−ζπ/√(1−ζ^2)), where ζ is damping ratio. Settling time for a 2% band is approximately 4/(ζω_n).
- Carnot efficiency
- Maximum theoretical efficiency of a heat engine operating between hot and cold reservoirs: η = 1 − T_L/T_H, with absolute temperatures. No real engine exceeds this limit.
- Euler buckling load
- Critical axial load for an ideal slender column: P_cr = π^2 EI/(KL)^2, where K depends on end conditions. Buckling occurs before yielding for long columns.
- Taylor's tool life equation
- V T^n = C, where V is cutting speed, T is tool life, n is a tool-material exponent, and C is a constant. Higher cutting speed shortens tool life.
- Chvorinov's rule
- Solidification time t = B (V/A)^2, where V is volume, A is surface area, and B is a mold constant. Riser design uses the modulus M = V/A to ensure feeding.
- Rankine cycle pump work
- For a liquid pump, specific work ≈ v_f (p_2 − p_1), where v_f is saturated liquid specific volume. Small compared with turbine work in a steam power plant.
- Break-even point
- Sales volume at which total revenue equals total cost: Fixed cost / (Selling price − Variable cost per unit). Contribution margin per unit drives the calculation.
- WACC formula
- Weighted average cost of capital = (E/V) R_e + (D/V) R_d (1 − T), where E is equity, D is debt, V = E + D, and T is tax rate. Interest tax shield lowers debt cost.
- NPV decision rule
- Net present value = Σ CF_t/(1+r)^t − initial outlay. Accept independent projects with NPV > 0; for mutually exclusive projects, choose the highest positive NPV.
- Accounting equation
- Assets = Liabilities + Equity. Every transaction preserves this balance through double-entry bookkeeping, with equal debits and credits recorded.
- Price elasticity of demand
- Percentage change in quantity demanded divided by percentage change in price. Demand is elastic if absolute value exceeds 1, inelastic if below 1, and unit elastic if equal to 1.
- Modus tollens
- A valid argument form: if P implies Q, and Q is false, then P is false. Denying the consequent is valid, unlike affirming the consequent, which is a fallacy.