Maharashtra SSC Plumber (General) Pre-Voc/NSQF · Give each week a clear focus.
8 weeks · About 6 hours per week
Materials, Pipes, Fittings and Jointing Methods & Hand Tools, Power Tools and Measuring Instruments
Classify GI, CI, PVC, CPVC, HDPE and copper pipes by pressure rating, joining method and typical use, writing a one-line rule for each
Identify and state the correct use of pipe cutters, threading dies, bending springs, deburring tools and pipe wrenches
Demonstrate the sequence for cutting, reaming and threading a GI pipe and list three defects that cause leakage at a threaded joint
Measure pipe outer diameter and wall thickness with a vernier caliper and tape, and record readings in a table
Your checkpoint
A one-page pipe-and-fitting selection chart covering six materials with joining method, pressure rating and two common errors each
Materials, Pipes, Fittings and Jointing Methods & Occupational Safety, Health and Working Environment
Describe solvent cementing of PVC, compression fitting assembly and lead-caulked CI joint steps in correct order
Select the right fitting (elbow, tee, reducer, union, cap, bend, Y-branch) for a given change of direction or diameter
List personal protective equipment for threading, solvent cementing and hot-work, and state why each item is worn
Explain safe handling and storage of solvent cement, primer and LPG or blowlamp used for lead joints
Your checkpoint
A jointing procedure sheet for three joint types (threaded GI, solvent-welded PVC, compression) with PPE listed against each step
Water Supply Systems and Pipe Sizing & Hand Tools, Power Tools and Measuring Instruments
Distinguish direct and indirect (tank and pump) water supply and describe the function of ferrule, stopcock, float valve and gate valve in each
Size a branch pipe for a given number of fixture units using a fixture-unit table and state the resulting diameter
Determine required storage tank capacity for a household from daily demand per person and number of occupants
Use a spirit level and plumb bob to mark and check a level pipe run, and record the fall achieved
Your checkpoint
A worked sizing sheet for a two-storey house showing fixture units, chosen pipe diameters and tank capacity with calculations shown
Sanitary Drainage, Ventilation and Sewerage Systems & Water Supply Systems and Pipe Sizing
Draw a single-stack drainage layout showing soil pipe, waste pipe, vent pipe, gully trap, inspection chamber and connection to the sewer
Calculate the correct slope for a 100 mm soil line over a given run and state why self-cleansing velocity matters
Explain the purpose of a P-trap water seal, anti-siphonage venting and the minimum seal depth, and name two causes of seal loss
State the required test for a drainage line (water test or air test) and describe how it is carried out and accepted
Your checkpoint
A hand-drawn drainage and vent layout with slopes, pipe sizes and trap positions labelled, plus a short note on the test to be applied
Plumbing Fixtures, Sanitary Ware and Appliances & Sanitary Drainage, Ventilation and Sewerage Systems
Identify WC pans, wash basins, sinks, floor traps, urinals and bidets and state the correct outlet size and fixing height for each
Describe the flushing cistern mechanism and diagnose three common faults: continuous running, weak flush and no flush
Explain the working of a bib tap, pillar tap, mixer and ball float valve and name the washer or cartridge each uses
Describe the correct disposal of waste from a blocked drain and the precautions taken before entering a manhole
Your checkpoint
A fixture installation checklist giving fixing height, outlet size, trap type and one common fault with remedy for five fixtures
Installation, Testing, Commissioning and Maintenance & Occupational Safety, Health and Working Environment
Write the step-by-step procedure to pressure-test a newly installed water line and state the test pressure and duration
Commission a pumped overhead tank system: check float valve setting, pump cut-in and cut-off, and record observations
Prepare a preventive maintenance schedule for taps, traps, tanks and pumps covering frequency and action
Carry out a workplace risk assessment for a plumbing task and record hazard, risk and control in a register
Your checkpoint
A completed testing and commissioning report for one simulated water line, including test pressure, duration, result and a maintenance schedule
Engineering Drawing, Estimation and Costing & Employability Skills, Entrepreneurship and Green Practices
Read a simple plumbing drawing and extract pipe sizes, fixture positions and invert levels into a take-off list
Prepare a quantity estimate and cost sheet for a small toilet installation using current local rates
Identify three green practices in plumbing such as rainwater harvesting, low-flow fixtures and leak detection, and state the saving each gives
List the licences, registrations and basic record-keeping needed to run a small plumbing contracting business
Your checkpoint
A costed estimate with bill of quantities for a single toilet installation, plus a half-page note on two green practices and one business registration step
Digital Literacy, Communication and Soft Skills & Occupational Safety, Health and Working Environment & Employability Skills, Entrepreneurship and Green Practices
Write a short work report and a customer handover note in clear simple language
Explain a plumbing fault to a customer in plain words and describe how to handle a complaint politely
Use a smartphone or computer to search a pipe size table, store a photo record and send a quotation by message
Revise safety rules and take a timed 30-question mock test across all ten domains, then list weak areas
Your checkpoint
A mock-test score sheet with weak domains listed and a one-page customer handover note written as a sample
Milestones
Week 2: Can name the correct jointing method and one failure mode for GI, PVC, CPVC and copper without notes
Week 4: Can size a branch line from fixture units and state the slope for a 100 mm drain line from memory
Week 6: Can describe the pressure test procedure, test pressure and acceptance result in under two minutes
Week 8: Scores at least 70 percent on the 30-question mock test with no domain below 50 percent