Maharashtra SSC Plumber (General) Pre-Voc/NSQF study materials
Maharashtra SSC Plumber (General) Pre-Voc/NSQF study resources

Maharashtra SSC Plumber (General) Pre-Voc/NSQF study plan

Maharashtra SSC Plumber (General) Pre-Voc/NSQF · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Materials, Pipes, Fittings and Jointing Methods & Hand Tools, Power Tools and Measuring Instruments

  • Classify GI, CI, PVC, CPVC, HDPE and copper pipes by pressure rating, joining method and typical use, writing a one-line rule for each

  • Identify and state the correct use of pipe cutters, threading dies, bending springs, deburring tools and pipe wrenches

  • Demonstrate the sequence for cutting, reaming and threading a GI pipe and list three defects that cause leakage at a threaded joint

  • Measure pipe outer diameter and wall thickness with a vernier caliper and tape, and record readings in a table

Your checkpoint

A one-page pipe-and-fitting selection chart covering six materials with joining method, pressure rating and two common errors each

Week 2

Materials, Pipes, Fittings and Jointing Methods & Occupational Safety, Health and Working Environment

  • Describe solvent cementing of PVC, compression fitting assembly and lead-caulked CI joint steps in correct order

  • Select the right fitting (elbow, tee, reducer, union, cap, bend, Y-branch) for a given change of direction or diameter

  • List personal protective equipment for threading, solvent cementing and hot-work, and state why each item is worn

  • Explain safe handling and storage of solvent cement, primer and LPG or blowlamp used for lead joints

Your checkpoint

A jointing procedure sheet for three joint types (threaded GI, solvent-welded PVC, compression) with PPE listed against each step

Week 3

Water Supply Systems and Pipe Sizing & Hand Tools, Power Tools and Measuring Instruments

  • Distinguish direct and indirect (tank and pump) water supply and describe the function of ferrule, stopcock, float valve and gate valve in each

  • Size a branch pipe for a given number of fixture units using a fixture-unit table and state the resulting diameter

  • Determine required storage tank capacity for a household from daily demand per person and number of occupants

  • Use a spirit level and plumb bob to mark and check a level pipe run, and record the fall achieved

Your checkpoint

A worked sizing sheet for a two-storey house showing fixture units, chosen pipe diameters and tank capacity with calculations shown

Week 4

Sanitary Drainage, Ventilation and Sewerage Systems & Water Supply Systems and Pipe Sizing

  • Draw a single-stack drainage layout showing soil pipe, waste pipe, vent pipe, gully trap, inspection chamber and connection to the sewer

  • Calculate the correct slope for a 100 mm soil line over a given run and state why self-cleansing velocity matters

  • Explain the purpose of a P-trap water seal, anti-siphonage venting and the minimum seal depth, and name two causes of seal loss

  • State the required test for a drainage line (water test or air test) and describe how it is carried out and accepted

Your checkpoint

A hand-drawn drainage and vent layout with slopes, pipe sizes and trap positions labelled, plus a short note on the test to be applied

Week 5

Plumbing Fixtures, Sanitary Ware and Appliances & Sanitary Drainage, Ventilation and Sewerage Systems

  • Identify WC pans, wash basins, sinks, floor traps, urinals and bidets and state the correct outlet size and fixing height for each

  • Describe the flushing cistern mechanism and diagnose three common faults: continuous running, weak flush and no flush

  • Explain the working of a bib tap, pillar tap, mixer and ball float valve and name the washer or cartridge each uses

  • Describe the correct disposal of waste from a blocked drain and the precautions taken before entering a manhole

Your checkpoint

A fixture installation checklist giving fixing height, outlet size, trap type and one common fault with remedy for five fixtures

Week 6

Installation, Testing, Commissioning and Maintenance & Occupational Safety, Health and Working Environment

  • Write the step-by-step procedure to pressure-test a newly installed water line and state the test pressure and duration

  • Commission a pumped overhead tank system: check float valve setting, pump cut-in and cut-off, and record observations

  • Prepare a preventive maintenance schedule for taps, traps, tanks and pumps covering frequency and action

  • Carry out a workplace risk assessment for a plumbing task and record hazard, risk and control in a register

Your checkpoint

A completed testing and commissioning report for one simulated water line, including test pressure, duration, result and a maintenance schedule

Week 7

Engineering Drawing, Estimation and Costing & Employability Skills, Entrepreneurship and Green Practices

  • Read a simple plumbing drawing and extract pipe sizes, fixture positions and invert levels into a take-off list

  • Prepare a quantity estimate and cost sheet for a small toilet installation using current local rates

  • Identify three green practices in plumbing such as rainwater harvesting, low-flow fixtures and leak detection, and state the saving each gives

  • List the licences, registrations and basic record-keeping needed to run a small plumbing contracting business

Your checkpoint

A costed estimate with bill of quantities for a single toilet installation, plus a half-page note on two green practices and one business registration step

Week 8

Digital Literacy, Communication and Soft Skills & Occupational Safety, Health and Working Environment & Employability Skills, Entrepreneurship and Green Practices

  • Write a short work report and a customer handover note in clear simple language

  • Explain a plumbing fault to a customer in plain words and describe how to handle a complaint politely

  • Use a smartphone or computer to search a pipe size table, store a photo record and send a quotation by message

  • Revise safety rules and take a timed 30-question mock test across all ten domains, then list weak areas

Your checkpoint

A mock-test score sheet with weak domains listed and a one-page customer handover note written as a sample

Milestones

Week 2: Can name the correct jointing method and one failure mode for GI, PVC, CPVC and copper without notes

Week 4: Can size a branch line from fixture units and state the slope for a 100 mm drain line from memory

Week 6: Can describe the pressure test procedure, test pressure and acceptance result in under two minutes

Week 8: Scores at least 70 percent on the 30-question mock test with no domain below 50 percent