IN Plumber study materials
IN Plumber study resources

IN Plumber study plan

IN Plumber · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Sanitary Drainage

  • Trace a complete building drain from fixture outlet to the public sewer on a blank sheet, labeling every fitting, slope change, and cleanout location

  • Size the drainage piping for a three-story stack using fixture-unit tables, showing each step of the calculation

  • State and apply the required slope for pipe sizes under three inches versus four inches and larger to a sample layout

  • List the connection rules for horizontal-to-vertical and vertical-to-horizontal transitions, including fitting type restrictions

  • Reconstruct the drainage sizing tables from memory, then correct your version against the code and note each error

Your checkpoint

A 40-question self-written sanitary drainage quiz scored at 85% or higher, with every missed item rewritten as a corrected explanatory note.

Week 2

Sanitary Drainage & Water Supply and Distribution

  • Solve 15 fixture-unit and drainage-fixture-unit conversion problems with no reference material open

  • Draw a combined waste-and-vent system beside a fully vented system and mark where each arrangement is permitted

  • Identify the support, anchoring, and joint requirements for buried versus above-ground DWV piping

  • Size a water service and meter for a single-family dwelling from fixture counts, available pressure, and developed length

Your checkpoint

A hand-drawn riser diagram of a three-bath dwelling with drainage and water supply both sized and fully annotated with numbers and code basis.

Week 3

Water Supply and Distribution & Backflow Prevention and Cross-Connection Control

  • Calculate friction loss through a given run of supply pipe using a friction-loss table and confirm residual pressure at the highest and farthest fixture

  • Apply developed-length rules to a supply piping layout and adjust pipe size where required

  • Classify ten cross-connection scenarios and select the correct protective device for each: air gap, reduced-pressure zone, double check, or vacuum breaker

  • State the installation orientation, drainage, and testing-interval rules for each backflow assembly type

  • Choose the appropriate thermal expansion control method for a closed potable water system and justify the choice

Your checkpoint

A cross-connection control matrix covering ten scenarios with device selected, written justification, and the governing rule cited by subject rather than by number.

Week 4

Vents and Venting

  • Determine vent size from fixture-unit load and stack height for four worked examples

  • Distinguish wet venting, common venting, circuit venting, and island venting, and state the conditions that permit each

  • Compute the maximum developed length of a vent and apply the size-increase rule when that length is exceeded

  • Locate where air admittance valves are allowed and where they are prohibited in a building

Your checkpoint

A timed 25-question venting test scored at 80% or higher, plus a corrected vent layout for a wet-vented bathroom group with each correction explained.

Week 5

Vents and Venting & Fixtures, Fixture Fittings, and Faucets

  • Verify trap arm length and fall limits for every fixture on a sample floor plan and flag violations

  • Match fixture clearances, spacing, and installation height requirements against an actual bathroom layout

  • Determine the minimum number and type of fixtures required for a given occupancy and occupant load

  • Explain flush volume limits and fixture fitting requirements that apply to accessible installations

Your checkpoint

A plan-review checklist applied to two sample floor plans, producing a written list of code-referenced findings for each plan.

Week 6

Fixtures, Fixture Fittings, and Faucets & Traps, Interceptors, and Special Wastes

  • Select the correct trap for each fixture type and reject improper arrangements such as S-traps, double trapping, and crown venting

  • Size a grease interceptor and a sand-and-oil interceptor from given fixture loads and show the calculation

  • Describe neutralization and dilution requirements for corrosive waste and identify where each applies

  • Explain trap seal protection and primer requirements for floor drains and infrequently used fixtures

  • Check faucet and fixture fitting flow rates against current maximums and identify noncompliant fixtures

Your checkpoint

A one-page decision tree covering trap selection and interceptor sizing, validated against ten practice scenarios with every branch confirmed.

Week 7

General Regulations, Permits, and Licensing Administration & Definitions and General Building Supply and Drainage Requirements

  • Outline the permit application, fee, and inspection sequence for a residential repipe from first filing to final inspection

  • List licensing, bonding, and continuing-education obligations together with the penalties for unlicensed or unpermitted work

  • Define 20 core code terms in your own words with no notes, including developed length, fixture unit, stack, branch, and riser

  • Apply general building supply and drainage requirements to a mixed-use occupancy scenario and document each determination

  • Classify ten work items as permit-required or exempt minor repair and justify each classification

Your checkpoint

A 50-card definition deck self-tested at 90% or higher, plus a one-page written permit-and-inspection flow summary.

Week 8

Water Heaters and Temperature Control & Storm Drainage

  • Size a water heater and its relief valve and expansion provisions for a stated dwelling demand

  • Verify temperature-and-pressure relief discharge piping, termination, and support requirements, plus strapping or anchoring where required

  • Compute roof drainage area and size conductors and leaders for a stated rainfall intensity

  • Distinguish primary from secondary roof drainage and state when secondary or overflow drainage is required

  • Complete two full-length timed practice exams and rework every missed item into a corrected written explanation

Your checkpoint

Two timed full-length practice exams scored at 80% or above, accompanied by an error log grouped by domain that names the specific rule missed.

Milestones

Week 2: Complete the three-bath riser diagram unaided and score 80% or higher on a 20-question mixed drainage-and-supply check.

Week 4: Explain the difference between wet, common, circuit, and island venting aloud in under three minutes and pass the timed venting test at 80%.

Week 6: Correctly size both interceptor types and select the proper trap for eight of ten fixtures without references.

Week 8: Average 80% or higher across two full-length timed exams with no domain scoring below 70%.