Punjab PSEB Sr. Sec. NSQF Telecom (Optical Fibre Technician) study materials
Punjab PSEB Sr. Sec. NSQF Telecom (Optical Fibre Technician) study resources

Punjab PSEB Sr. Sec. NSQF Telecom (Optical Fibre Technician) study plan

Punjab PSEB Sr. Sec. NSQF Telecom (Optical Fibre Technician) · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Optical Fibre Fundamentals and Principles of Light Transmission & Optical Fibre Cables, Types, and Colour Coding

  • Explain the principles of light propagation in optical fibre, including total internal reflection, numerical aperture, and acceptance angle, using a ray diagram you draw yourself.

  • Differentiate between single-mode and multi-mode fibre in terms of core diameter, attenuation, bandwidth, and typical deployment scenarios.

  • Identify the standard colour coding for optical fibres in cables (e.g., TIA-598 or IEC 60793) and decode a 12-fibre colour sequence from memory.

  • List the main types of optical fibre cables (tight-buffered, loose-tube, ribbon, aerial, duct) and state one application for each.

  • Calculate the critical angle for a given core-cladding refractive index pair using Snell's law.

Your checkpoint

Create a one-page reference sheet with a labelled ray diagram, a table comparing single-mode and multi-mode fibre, and a colour-code chart for 12 fibres; score at least 80% on a self-made 10-question quiz covering these topics.

Week 2

Fibre Splicing (Fusion and Mechanical) and Connectorisation & Tools, Equipment, and Safety Practices in OFC Work

  • Describe the step-by-step procedure for fusion splicing, including fibre stripping, cleaning, cleaving, splicing, and splice protection.

  • Compare fusion splicing and mechanical splicing in terms of typical insertion loss, cost, and use cases.

  • Demonstrate the correct use of a fibre cleaver and explain how to achieve a good cleave angle (within 1 degree).

  • Identify the safety hazards in OFC work (laser radiation, glass shards, chemicals) and state the personal protective equipment required for each.

  • Explain the process of connectorisation using epoxy-polish and pre-polished connectors, and list common connector types (SC, LC, ST).

Your checkpoint

Produce a written procedure for fusion splicing and connectorisation (at least 300 words) and a safety checklist for an OFC work site; perform a dry run of fibre stripping and cleaving (without splicing) and record the cleave angles of five samples.

Week 3

Fibre Splicing (Fusion and Mechanical) and Connectorisation & Testing, Measurement, and Fault Localisation (OTDR, Power Meter, VFL)

  • Perform a fusion splice using a training splicer, achieving an estimated loss of 0.1 dB or less on at least three consecutive attempts.

  • Use an optical power meter and light source to measure the insertion loss of a mated connector pair.

  • Explain the working principle of an OTDR and how it locates faults and measures distance.

  • Interpret a simple OTDR trace, identifying events such as splices, connectors, and breaks.

  • Use a visual fault locator (VFL) to detect a break or high-loss point in a fibre patch cord.

Your checkpoint

Splice a 2-metre fibre pigtail to a length of fibre and measure the splice loss using an OTDR; submit a short report with the splice loss value and an annotated OTDR trace screenshot (or hand-drawn trace) showing at least two events.

Week 4

Testing, Measurement, and Fault Localisation (OTDR, Power Meter, VFL) & OFC Laying, Ducting, Aerial and Underground Installation

  • Set up an OTDR with correct parameters (range, pulse width, refractive index, averaging time) for a given fibre link and explain the effect of each parameter.

  • Measure end-to-end loss and optical return loss of a fibre link using a power meter and light source.

  • Describe the steps for laying optical fibre cable in ducts, including pulling tension limits, bend radius, and lubrication.

  • Explain aerial installation methods (ADSS, lashed) and underground installation (direct burial, duct) with their advantages and constraints.

  • Identify the causes of common faults (high loss, breaks, reflections) and the appropriate test equipment to localise them.

Your checkpoint

Create a troubleshooting flowchart that maps symptoms (e.g., high loss, no signal, high reflectance) to test procedures using OTDR, power meter, and VFL; include at least five fault scenarios and the correct tool for each.

Week 5

OFC Laying, Ducting, Aerial and Underground Installation & Optical Network Termination, FTTH, and Customer Premises Installation

  • Outline the procedure for installing an FTTH drop cable from a distribution box to a customer premises, including wall penetrations and cable routing.

  • Terminate an optical outlet (OTB) or fibre access terminal and perform connectorisation with SC/APC connectors.

  • Explain the architecture of a simple FTTH network: OLT, splitter, ONT, and the role of each.

  • Describe the process of splicing a drop cable to a feeder cable in a closure, including closure sealing and fibre management.

  • List the tests required before handing over a customer connection (power level, loss, continuity) and their acceptable limits.

Your checkpoint

Produce a step-by-step installation guide for a single FTTH customer connection (at least 400 words) that includes a diagram of the network from OLT to ONT, and a handover test checklist with pass/fail criteria.

Week 6

Optical Network Termination, FTTH, and Customer Premises Installation & Maintenance, Restoration, and Documentation of Optical Networks

  • Configure a basic ONT (or simulate configuration) for VLAN and Wi-Fi settings, and verify service using a power meter.

  • Explain the importance of documentation (as-built drawings, splice schedules, test results) and describe how to maintain them.

  • Perform a restoration procedure for a cut fibre cable: locate the fault, prepare the cable, splice, and test.

  • Use an OTDR to measure the distance to a break and calculate the required cable length for replacement.

  • Describe preventive maintenance activities for an OFC network (inspection, cleaning, power monitoring).

Your checkpoint

Create a restoration report template that includes fault location, cause, repair actions, splice loss measurements, and post-repair test results; fill it out for a simulated cut fibre scenario using OTDR data.

Week 7

Maintenance, Restoration, and Documentation of Optical Networks & Employability Skills, Entrepreneurship, and Workplace Communication

  • Draft a professional email to a customer explaining a service interruption and the expected restoration time.

  • Explain the concept of entrepreneurship and identify two business opportunities in the OFC sector (e.g., FTTH installation contractor, maintenance services).

  • Demonstrate effective workplace communication skills, including active listening and clear reporting, through a role-play scenario.

  • Describe the importance of teamwork and coordination during a fibre restoration operation.

  • List the key components of a cost estimate for a small OFC installation project.

Your checkpoint

Write a one-page proposal for a small OFC maintenance business, including services offered, target customers, and a basic cost structure; also prepare a 5-minute oral presentation (or written script) on the importance of documentation in network maintenance.

Week 8

Optical Fibre Fundamentals and Principles of Light Transmission & Optical Fibre Cables, Types, and Colour Coding & Tools, Equipment, and Safety Practices in OFC Work & Fibre Splicing (Fusion and Mechanical) and Connectorisation & OFC Laying, Ducting, Aerial and Underground Installation & Testing, Measurement, and Fault Localisation (OTDR, Power Meter, VFL) & Optical Network Termination, FTTH, and Customer Premises Installation & Maintenance, Restoration, and Documentation of Optical Networks & Employability Skills, Entrepreneurship, and Workplace Communication

  • Review all domains by completing a comprehensive 50-question practice test covering all nine domains, with at least 80% accuracy.

  • Revisit weak areas identified from the practice test and create a summary sheet of key formulas, colour codes, and procedures.

  • Simulate a full end-to-end FTTH installation and testing scenario within 2 hours, including splicing, connectorisation, and OTDR testing.

  • Explain the safety protocols and documentation requirements for a typical OFC project.

  • Demonstrate the ability to troubleshoot a fibre fault using OTDR and VFL in a timed exercise.

Your checkpoint

Pass a self-administered final exam (minimum 80%) and submit a complete project portfolio containing: colour code chart, splice and test reports, FTTH installation guide, restoration report, and business proposal.

Milestones

Week 2: Complete a written quiz on fibre fundamentals and cable colour codes with at least 80% accuracy, and demonstrate correct fibre stripping and cleaving technique on five samples with cleave angles within 1 degree.

Week 4: Achieve a fusion splice loss of 0.1 dB or less on three consecutive splices and correctly interpret an OTDR trace by identifying at least three events (splice, connector, break) with their distances.

Week 6: Successfully perform a simulated FTTH customer installation, including splicing, connectorisation, and testing, and complete a restoration report for a simulated cable cut with accurate fault location and repair documentation.

Week 8: Score at least 80% on a comprehensive 50-question practice test covering all domains, and submit a complete project portfolio with all required documents.