InterNACHI CPI study materials
InterNACHI CPI study resources

InterNACHI CPI cheat sheet

InterNACHI CPI · Keep the key ideas within reach.

Quick reference

Home Inspector Job Task Analysis - CPI Inspection Tasks

  • Standard inspection scope covers readily accessible visual systems: structure, exterior, roof, plumbing, electrical, heating, cooling, insulation/ventilation, interior, and fireplaces.

  • Inspection is visual and non-invasive; concealed components, dismantling, and destructive testing are outside the task scope unless separately agreed in writing.

  • Report must describe inspected systems, note material defects, and state items not inspected and why (e.g., inaccessible, unsafe, not present).

  • Inspector must identify the type of each system (e.g., roof covering material, heating fuel and distribution, service amperage) as part of the description task.

  • Life-safety observations-missing GFCI protection, absent smoke/CO alarms, blocked combustion vents, exposed conductors-are reported as such, not as code compliance.

  • Defect classification: safety hazard, material defect, cosmetic issue, or deferred-maintenance item; only the first two are standard reportable findings.

  • Inspection agreement must be signed before or at the start of the inspection and state scope, limitations, fee, and dispute-resolution terms.

  • Photographs and written narrative support findings; verbal statements alone do not satisfy the reporting task.

  • Inspector does not pass or fail a home and does not warrant future performance or predict life expectancy of components.

Quick reference

Knowledge, Skills, and Abilities (KSA) for Competent CPI Practice

  • Knowledge: building science fundamentals-load paths, water management, combustion air, electrical grounding/bonding, and heat transfer through the envelope.

  • Knowledge: typical failure modes per system (e.g., flashing leaks, aluminum branch-circuit connections, cracked heat exchangers, failed TPR discharge piping).

  • Skill: systematic inspection routine (e.g., roof to foundation, or exterior-to-interior) to reduce missed items and ensure repeatable coverage.

  • Skill: clear technical writing-plain-language findings with location, condition observed, implication, and recommended action (further evaluation by a qualified specialist).

  • Skill: safe operation of tools-ladders, moisture meters, GFCI/testers, combustion analyzers-and recognition of unsafe conditions that require stopping.

  • Ability: distinguish material defects from cosmetic or maintenance items and calibrate language to avoid alarmism and avoid minimizing hazards.

  • Ability: apply standards of practice and code-of-ethics limits-no repair work on inspected properties within the conflict-of-interest period, no undisclosed referral fees.

  • Ability: communicate scope limits and manage client expectations, including referral to licensed specialists for systems beyond visual inspection.

Quick reference

Home Inspector Job Task Analysis - Roof, Exterior, and Structure Tasks

  • Roof task: report covering material, approximate age if determinable, number of layers where visible, flashing condition, and evidence of active or past leakage.

  • Roof task: walking the roof is not required; if not walked, state the method used (e.g., binoculars, drone, ladder at eaves) and access limitations.

  • Exterior task: inspect wall cladding, trim, grading, drainage, driveways, decks, and guardrails for defect, deterioration, or unsafe attachment.

  • Grading rule: soil should slope away from the foundation; negative grade or downspouts discharging at the foundation is a reportable water-management defect.

  • Structure task: observe foundation, floor, wall, and roof framing where accessible for cracks, settlement, rot, insect damage, and improper alterations.

  • Deck safety: ledger attachment, flashing, post-to-footing connection, diagonal bracing, and stair/guardrail geometry are standard observation points.

  • Chimney task: report visible flue lining condition, cap, crown, and clearance from combustibles; recommend Level II evaluation when the flue cannot be seen.

Quick reference

Home Inspector Job Task Analysis - Plumbing, Electrical, HVAC, Interior Tasks

  • Plumbing task: identify supply piping material and drain/waste/vent material; report active leaks, corrosion, improper slope, and unsupported or missing traps.

  • Water heater task: report energy source, capacity, TPR valve and discharge pipe routing, seismic strapping where required, and combustion venting for gas units.

  • Electrical task: report service type and amperage, main disconnect, panel labeling, double-tapped or improperly sized breakers, and presence of GFCI/AFCI protection.

  • Electrical safety rule: any panel with signs of overheating, arcing, water intrusion, or a compromised service conductor is reported and referred to a licensed electrician; no cover removal beyond safe visual access.

  • HVAC task: describe heating and cooling equipment type, energy source, and distribution; operate with normal controls and report response, not measured capacity.

  • HVAC limitation: heat exchanger internal condition is not visually verifiable in most units; report visible flame distortion, rust, or CO evidence and recommend evaluation.

  • Interior task: report water intrusion evidence, ceiling/wall cracks, stair and handrail defects, and windows/doors that are inoperable or unsafe.

  • Ventilation task: report bath and kitchen exhaust termination, dryer vent material and routing, and attic/under-floor ventilation adequacy as observed.

Quick reference

Knowledge, Skills, and Abilities (KSA) - Reporting, Ethics, and Client Communication

  • Report standard: each finding includes location, observation, implication, and recommendation; ambiguous single-word entries are inadequate.

  • Recommendation language rule: use 'recommend evaluation/repair by a qualified licensed contractor' rather than specifying a repair method the inspector will not verify.

  • Ethics rule: inspector may not accept compensation from more than one party for the same inspection without full disclosure and consent.

  • Confidentiality: report contents are provided to the client; release to third parties (agents, lenders) requires client authorization.

  • Continuing education: CPI credential requires meeting annual CE hours and renewing membership; track credits against the current requirement.

  • Liability management: document conditions observed, limitations, and client-requested exclusions; contemporaneous notes and photos support the report.

  • Client communication skill: explain the difference between a material defect and a maintenance item, and clarify that the report is a snapshot of conditions at the time of inspection.

  • Scope boundary skill: recognize when a condition exceeds the standard of practice (e.g., suspected mold, structural engineering questions) and refer appropriately.

Quick reference

Knowledge, Skills, and Abilities (KSA) - Building Science and Diagnostic Reasoning

  • Water management principle: bulk water control (roof, flashing, drainage) precedes vapor control; most moisture damage traces to a bulk-water entry path.

  • Vapor/air rule: air leakage transports far more moisture than diffusion; attic and rim-joist air sealing matters more than vapor retarder selection in most climates.

  • Combustion safety: a naturally drafting appliance needs adequate combustion air and a proper vent; backdrafting is tested with a flame or smoke at the draft hood.

  • Electrical principle: grounding and bonding are distinct-bonding provides a fault path, grounding references the system to earth; both are needed for overcurrent clearing.

  • Temperature/pressure relief: TPR valve opens near 150 psi or 210°F; discharge must terminate within 6 inches of the floor and not be capped or reduced.

  • Deck/guardrail rule: guardrails typically at 36 inches minimum with balusters spaced so a 4-inch sphere cannot pass; stair rails 34–38 inches.

  • Roof slope rule: low-slope roofs (below about 4:12) require different underlayment and flashing details than steep-slope coverings.

  • Diagnostic skill: correlate findings across systems-staining below a roof penetration, high moisture readings near a downspout, or corrosion at a flue-before concluding cause.

Quick reference

Home Inspector Job Task Analysis - Client Intake, Pre-Inspection, and Post-Inspection Tasks

  • Pre-inspection task: confirm scope, access, occupancy, utilities on, and any known conditions (recent repairs, permits, disclosures) before arriving.

  • Pre-inspection task: verify the client understands exclusions (e.g., septic, well, pool, detached structures) and that ancillary services require separate agreement.

  • On-site task: verify utilities are energized and pilot lights lit before testing; if not, document and reschedule or exclude affected systems.

  • On-site task: maintain a safe working environment-secure ladders, avoid disturbing occupants' belongings, and stop inspection in unsafe conditions.

  • Post-inspection task: deliver the written report within the timeframe stated in the agreement and be available for follow-up questions.

  • Post-inspection task: correct or clarify report errors promptly and in writing; do not alter findings after the fact without documenting the reason.

  • Record-keeping task: retain agreements, reports, and supporting photos for the period required by the agreement and applicable law.

Quick reference

Knowledge, Skills, and Abilities (KSA) - Tools, Safety, and Professional Judgment

  • Tool knowledge: moisture meters read percent wood moisture or relative scale on other materials; readings above roughly 20% wood moisture indicate conditions favorable to decay.

  • Tool knowledge: a non-contact voltage tester is a screening device only; confirm with a solenoid tester or multimeter before concluding a circuit is de-energized.

  • Tool knowledge: GFCI testers verify trip function at the receptacle; test at the device and note downstream protection where applicable.

  • Safety skill: ladder use-3-point contact, 4:1 base-to-height ratio, secure footing, and never on a roof in high wind, rain, or frost.

  • Safety skill: recognize asbestos-containing materials, lead paint in pre-1978 homes, and mold-like growth; do not disturb, and refer for specialist evaluation.

  • Judgment skill: distinguish 'not inspected' from 'not present' in the report; conflating the two misrepresents the scope.

  • Judgment skill: when a defect's cause is unclear, describe the observation and recommend further evaluation rather than asserting a diagnosis.

  • Professional skill: maintain impartiality-findings and recommendations are not influenced by agents, sellers, or the prospect of future work.