- 11th-month warranty inspection
- A visual, non-invasive survey performed during the 11th month of a builder's one-year warranty so the owner can submit documented defects before the warranty period expires.
- 1-2-10 warranty structure
- Common builder limited warranty layout: year one covers workmanship and materials, year two covers systems such as plumbing, electrical, and HVAC, and years three through ten cover major structural defects.
- Substantial completion date
- The date the home was sufficiently finished for its intended use, typically tied to the certificate of occupancy; it usually starts the warranty clock and sets the 11th-month inspection window.
- Performance-based inspection
- An inspection that judges how building components have performed over time, such as cracking, settlement, or moisture intrusion, rather than verifying code compliance or design intent.
- Warranty claim submission
- The owner's written notice to the builder listing defects and requesting repair, submitted before the warranty anniversary date with the inspection report attached as supporting evidence.
- Seasonal cycle exposure
- The first year of occupancy subjects the house to heating, cooling, wetting, drying, and settlement; the 11th-month inspection captures defects that only appear after that cycle.
- Non-invasive inspection method
- Observation and operation of accessible systems using normal controls, without dismantling equipment, opening finished surfaces, or moving stored items to reveal concealed conditions.
- Warranty anniversary date
- The date one year after the warranty start; it marks expiration of year-one coverage and is the deadline by which the owner's defect claim should be submitted.
- Year-one workmanship coverage
- Builder responsibility for defects in materials and installation during the first year, such as drywall cracks, trim separation, door misalignment, flooring gaps, and finish defects.
- Year-two systems coverage
- Coverage during the second year for specified systems, commonly plumbing, electrical, and HVAC distribution, when failures are not caused by owner misuse or lack of maintenance.
- Ten-year structural coverage
- Long-term coverage for load-bearing structural defects that materially affect safety or habitability, typically excluding shrinkage cracking, settlement within tolerance, and non-structural movement.
- Warranty performance standards
- Written tolerances in the warranty document defining when a condition is a defect, such as allowable drywall crack width or floor deflection limits; they govern claim acceptance.
- Cosmetic exclusion
- A warranty provision excluding minor appearance issues such as hairline shrinkage cracks, paint touch-ups, and normal settlement marks that do not affect performance or safety.
- Maintenance condition precedent
- A requirement that the owner maintain caulking, grading, drainage, filters, and humidity control; failure can void claims for damage that proper maintenance would have prevented.
- Manufacturer warranty distinction
- Equipment and material warranties from manufacturers (roofing, windows, appliances, HVAC) run separately from the builder's warranty and are claimed through the manufacturer or its agent.
- Warranty transferability
- A clause stating whether remaining warranty coverage passes to a subsequent buyer; terms vary, so the inspector should cite the clause rather than assume coverage continues.
- Right-to-cure statute
- A state law requiring the homeowner to give the builder written notice and an opportunity to repair before filing suit; legal in nature and outside the inspector's professional scope.
- Implied warranty of habitability
- A legal doctrine in many jurisdictions holding builders to a standard of fitness for habitation, independent of the written warranty; interpretation requires an attorney.
- Standard of practice
- The published document defining which systems an inspector examines, the visual non-invasive method used, and the exclusions; it should be cited in the inspection report.
- Normal operating controls
- Thermostats, switches, valves, and fixtures a homeowner uses daily; operating them tests performance without dismantling equipment or accessing concealed components.
- Safety hazard classification
- A priority category for report items posing risk of injury, such as missing GFCI protection, gas leaks, blocked flues, exposed conductors, or absent handrails.
- Active water intrusion
- Observed or measured moisture entry at the time of inspection, documented with a moisture meter or thermal image and reported as a high-priority warranty defect.
- Defect versus maintenance
- A defect is a failure of the building or its components; maintenance is routine upkeep. Deteriorated caulk is maintenance, but resulting rot or staining is a reportable defect.
- Itemized defect report
- A written list grouped by system and location, each entry giving the observation, its location, and why it constitutes a warranty concern, supported by labeled dated photographs.
- Thermal imaging limitation
- Infrared imaging reveals temperature differences that may indicate moisture or missing insulation, but results require confirmation with a moisture meter and are not definitive alone.
- GFCI and AFCI testing
- Operating test and reset buttons on ground-fault and arc-fault circuit interrupters to confirm they trip; a device that fails to trip or reset is reported as a safety defect.
- Scope exclusion statement
- Report language clarifying that the inspection is visual and non-invasive, is not a code compliance inspection or engineering analysis, and does not guarantee future performance.
- Pre-inspection agreement
- A signed contract stating scope, fee, exclusions, limitation of liability, and dispute resolution, executed before the inspection so client expectations are documented in writing.
- Report delivery timeline
- The interval between inspection and report delivery, ideally 24 to 48 hours, because the client must submit the warranty claim before the anniversary date.
- Claim cover letter
- A concise client letter accompanying the report that lists priority items, cites the warranty anniversary date, and requests written response and a repair schedule from the builder.
- Referral to specialists
- A written recommendation that the client consult a licensed engineer, roofer, electrician, mold assessor, or attorney for conditions beyond the inspector's scope or competence.
- Reinspection report
- A separate dated document issued after builder repairs, limited to verifying whether previously identified items were corrected, without re- inspecting the entire home.