InterNACHI 11th-Month Warranty Inspector key terms
InterNACHI 11th-Month Warranty Inspector · Get comfortable with the vocabulary.
- 11th-month warranty inspection
- Related: builder warranty, punch list, warranty expiration date
A pre-expiration walkthrough performed near the end of a builder's first-year warranty so defects can be documented and submitted before the correction obligation lapses.
- builder warranty
- Related: 11th-month warranty inspection, expressed warranty, implied warranty
A written contractual promise from a builder or seller to repair or replace specified defects in a new home for a defined period, with stated standards and exclusions.
- expressed warranty
- Related: builder warranty, manufacturer warranty, warranty transfer
A warranty whose terms are stated in writing, such as a builder's limited one-year workmanship warranty or a manufacturer's product warranty document.
- implied warranty
- Related: expressed warranty, statute of repose, builder warranty
A warranty imposed by law rather than by written contract, such as implied warranties of workmanlike construction, habitability, or fitness for a particular purpose, varying by jurisdiction.
- warranty transfer
- Related: expressed warranty, warranty registration, builder warranty
The process by which remaining warranty coverage passes to a subsequent owner, typically requiring written notice to the builder and sometimes a fee within a stated window.
- warranty registration
- Related: warranty transfer, manufacturer warranty, warranty document review
The act of recording a new home or product with the builder or manufacturer so that coverage is activated and claims can be honored later.
- manufacturer warranty
- Related: expressed warranty, warranty registration, builder warranty
Coverage supplied by the maker of a component or material, such as shingles, windows, or water heaters, separate from the builder's own warranty obligations.
- warranty document review
- Related: exclusion clause, warranty registration, claim submission
Reading the builder's warranty, addenda, and manufacturer documents before the inspection to learn covered items, exclusions, claim deadlines, and required submission methods.
- exclusion clause
- Related: maintenance obligation, warranty document review, homeowner-caused damage
Contract language identifying conditions the builder will not correct, such as cosmetic cracks, normal shrinkage, landscaping, or damage caused by owner neglect.
- maintenance obligation
- Related: exclusion clause, homeowner-caused damage, water intrusion
The homeowner's duty to perform routine care such as caulking, grading, filter changes, and moisture control, which affects whether a defect remains warrantable.
- homeowner-caused damage
- Related: maintenance obligation, exclusion clause, warranty document review
Deterioration or failure resulting from owner actions or omissions, such as unrepaired leaks, blocked drains, or improper alterations, usually excluded from warranty coverage.
- latent defect
- Related: patent defect, statute of repose, implied warranty
A flaw not discoverable through reasonable inspection at the time of purchase that later becomes apparent, sometimes carrying longer or separate warranty or legal remedies.
- patent defect
- Related: latent defect, punch list, warranty document review
A defect that is visible or reasonably discoverable during an ordinary walkthrough, which may be subject to shorter notice periods under warranty terms or state law.
- statute of repose
- Related: latent defect, implied warranty, builder warranty
A law setting an absolute time limit, measured from substantial completion, after which construction defect claims are barred regardless of when the defect was discovered.
- punch list
- Related: 11th-month warranty inspection, defect documentation, photograph log
A written inventory of incomplete or defective items identified during a walkthrough, used to request correction before closing or during a warranty period.
- performance standard
- Related: tolerance, defect classification, inspection scope
A stated benchmark, such as a maximum allowable crack width or floor slope, against which an observed condition is judged acceptable or defective.
- tolerance
- Related: performance standard, defect classification, cosmetic defect
The permitted range of variation in workmanship or installation, within which a condition is considered normal and not a reportable defect.
- defect classification
- Related: safety hazard, cosmetic defect, performance standard
Sorting observed conditions by type and severity, such as safety, structural, water intrusion, workmanship, or cosmetic, to help the builder prioritize and respond.
- cosmetic defect
- Related: tolerance, defect classification, exclusion clause
A condition affecting appearance rather than function or safety, such as paint blemishes or minor drywall marks, often limited or excluded by warranty terms.
- safety hazard
- Related: defect classification, immediate notification, life-safety item
A condition presenting risk of injury, such as missing handrails, exposed wiring, or improper venting, which should be reported promptly regardless of warranty status.
- life-safety item
- Related: safety hazard, immediate notification, defect classification
A building component or condition whose failure could cause serious harm, including smoke alarms, egress paths, guardrails, and gas appliance venting.
- water intrusion
- Related: moisture meter, grading and drainage, maintenance obligation
Unwanted entry of moisture through the building envelope or plumbing, a leading warranty claim category because it causes rot, mold, and finish damage.
- grading and drainage
- Related: water intrusion, maintenance obligation, exclusion clause
The slope of soil and the performance of gutters, downspouts, and swales in directing water away from the foundation, commonly inspected for warranty defects.
- moisture meter
- Related: water intrusion, thermal imaging, defect documentation
A hand-held instrument that indicates relative moisture content in building materials, used to confirm suspected leaks or elevated readings behind finishes.
- thermal imaging
- Related: moisture meter, water intrusion, inspection scope
Use of an infrared camera to reveal temperature differences that may indicate missing insulation, air leakage, or hidden moisture, supporting but not replacing visual inspection.
- inspection scope
- Related: standards of practice, pre-inspection agreement, excluded systems
The defined list of systems and components examined, and the limits of that examination, stated in the agreement and report so expectations are clear.
- standards of practice
- Related: inspection scope, excluded systems, report writing
Published inspection guidelines defining minimum systems to examine, how to report findings, and what inspectors are not required to do.
- excluded systems
- Related: inspection scope, standards of practice, pre-inspection agreement
Building elements or conditions outside the agreed inspection scope, such as septic systems, wells, pools, or concealed components, which should be disclosed in writing.
- defect documentation
- Related: photograph log, punch list, report writing
Recording each defect with location, description, cause if evident, and supporting evidence so the builder can locate and verify the condition without dispute.
- photograph log
- Related: defect documentation, punch list, report writing
A numbered set of images with captions and locations that supports each reported item and helps the builder match findings to the written narrative.
- report writing
- Related: defect documentation, standards of practice, inspection scope
Producing a clear, organized written account of findings that separates observed facts from recommendations and states limitations and conditions present at inspection.
- pre-inspection agreement
- Related: inspection scope, excluded systems, client expectation management
A signed contract before the inspection that explains scope, fees, limitations, and liability terms, and confirms the client's consent to proceed.
- client expectation management
- Related: pre-inspection agreement, scope limitation disclosure, builder communication
Setting realistic expectations up front about what the inspection covers, what the warranty may or may not cover, and what the inspector can and cannot determine.
- scope limitation disclosure
- Related: inspection scope, client expectation management, report writing
A written statement identifying conditions that prevented full examination, such as stored items, finished surfaces, or weather, so findings are not overstated.
- claim submission
- Related: warranty document review, builder communication, claim follow-up
Delivering the defect list and supporting documentation to the builder through the method the warranty requires, with proof and date of delivery retained.
- builder communication
- Related: claim submission, claim follow-up, client expectation management
Professional, factual correspondence with the builder's warranty representative that states findings, requests correction, and documents responses and scheduled repair dates.
- claim follow-up
- Related: claim submission, builder communication, re-inspection
Tracking a submitted warranty claim through acknowledgment, scheduling, repair, and verification, and documenting any denial or incomplete correction.
- re-inspection
- Related: claim follow-up, punch list, defect documentation
A return visit after repairs to verify that listed items were corrected and that no new related conditions appeared, reported in a supplemental document.
- immediate notification
- Related: safety hazard, life-safety item, builder communication
Promptly alerting the client and, where appropriate, the builder about hazardous conditions found during the inspection rather than waiting for the written report.
- warranty expiration date
- Related: 11th-month warranty inspection, claim submission, warranty document review
The calendar date on which the builder's coverage period ends, which sets the deadline for inspection and for submitting claims to preserve rights.