InterNACHI 11th-Month Warranty Inspector study materials
InterNACHI 11th-Month Warranty Inspector study resources

InterNACHI 11th-Month Warranty Inspector: 11th-Month Warranty Inspection Fundamentals

InterNACHI 11th-Month Warranty Inspector · Work through your exam, one topic at a time.

All guide sections

11th-Month Warranty Inspection Fundamentals

11th-Month Warranty Inspection Fundamentals

This domain tests why an 11th-month inspection exists, when it should be performed, and what role the inspector plays in the builder-warranty process. The inspection is a visual, non-invasive review near the end of the builder's first-year workmanship-and-materials warranty, typically scheduled in month 10 or 11 so the homeowner can submit claims before expiration.

Core rules

  • The inspection is not a code-compliance inspection, a warranty adjudication, or a technically exhaustive investigation. It documents observable conditions and recommends qualified specialists where needed.
  • Coverage varies by builder and contract. Common builder warranties are described as 1-2-10: one year for workmanship and materials, two years for mechanical, plumbing, and electrical systems, and ten years for major structural defects. Treat that as a common model, not a universal rule; read the actual warranty.
  • Timing matters. Perform early enough for the homeowner to review the report, submit a claim, and let the builder respond before expiration.
  • The inspector reports conditions, not coverage decisions. Whether an item is covered is the builder's determination under the warranty document.

Worked example

A homeowner books in month 11 after noticing a drywall crack above a door. The inspector documents the crack, checks for displacement, notes no active moisture, and recommends monitoring and submission to the builder as a possible workmanship item. The inspector does not call it structural or promise repair. Reasoning: the observation is visual and the cause is not determined; the report gives the homeowner evidence and a clear next step.

Traps

Calling every crack structural; promising that the builder will pay; inspecting after the deadline; and treating the inspection as a substitute for the builder's own warranty process.