Iran Nezam Architecture Design Exam study materials
Iran Nezam Architecture Design Exam study resources

Adding a Fourth Storey to a 1974 Brick School in Tabriz

Iran Nezam Architecture Design Exam · Put your knowledge to work in context.

All case studies

Adding a Fourth Storey to a 1974 Brick School in Tabriz

A three-storey school building in Tabriz, completed in 1974, is an unreinforced brick masonry structure with 450 mm thick longitudinal walls, 350 mm cross walls, timber joists, and a flexible timber roof diaphragm. There are no reinforced concrete tie columns, ring beams, or bond beams. The building is 48 m long and 14 m wide, with a 12 m wide central corridor and classrooms on both sides. The site is in a very high seismic zone; the design ground acceleration for the current code is 0.35g. The client wants to add a fourth storey of four classrooms and a library, using lightweight steel framing, and to keep the school operating during construction. A preliminary survey found diagonal cracking in the spandrels above the corridor doors and out-of-plane bulging of the north wall at roof level. The architect is asked to advise on feasibility and to propose a retrofit and phasing strategy that does not rely on evacuating the whole school for two years.

1. Identify the seismic deficiencies and explain why adding a storey changes the probable failure mode.

Read the worked answer

The building has four linked deficiencies: unreinforced masonry walls with low tensile and shear capacity; no ring beams or vertical ties, so the walls act as independent leaves; a flexible timber diaphragm that cannot distribute lateral loads; and a 48 m long plan with stiff end walls, which attracts torsion and shear cracking at spandrels. The diagonal spandrel cracks are in-plane shear distress; the north wall bulge is out-of-plane flexure, probably from roof thrust and weak wall-to-diaphragm anchorage. Adding a fourth floor increases seismic mass at the top, raises base shear, and increases axial load in already overstressed piers. It also changes the failure mode: the new floor will brace against the old walls, so the roof diaphragm and wall ties see larger demand. The critical mechanism becomes out-of-plane collapse of the long north wall and separation of the roof diaphragm, not just cosmetic spandrel cracking. A lightweight steel fourth floor does not solve this if it relies on the existing walls; it may reduce mass but adds a stiff storey and a new concentration of load.

2. Propose a retrofit scheme and a phased construction sequence. Address the diaphragm, the walls, and the foundation.

Read the worked answer

I would decouple the new floor from the historic structure. Build a new steel frame on independent pad footings around the perimeter and through the cross-wall lines, carrying the fourth floor and a new roof; leave a 50–100 mm seismic gap from the existing walls, with flexible flashings. Then retrofit the unreinforced masonry: install reinforced concrete ring beams at each floor and vertical tie columns at wall intersections, anchored into the foundation; jacket the critical piers with 50–75 mm shotcrete and welded-wire mesh on both faces, using through-wall connectors; repair the north wall bulge by temporary shoring, remove loose brick, and rebuild with lime mortar before jacketing. Strengthen the timber diaphragm with a plywood or steel-braced overlay and steel wall plates. Phasing: survey and monitoring first; install temporary props and perimeter scaffolding; work in two halves, closing one wing at a time during summer; complete ties and ring beams before removing props; build the new frame and roof last. Foundation: expose and widen existing strip footings under the jacketed walls; new frame pads are separate. This keeps most classrooms open and avoids loading old walls with the new floor.

3. Should the architect recommend refusal or conditional approval? State the decision criteria and the professional steps.

Read the worked answer

Conditional approval only if the independent frame, ring beams, ties, and wall jacketing are funded and sequenced; otherwise refuse the fourth floor. Decision criteria: can the existing foundation take the jacketing and ring-beam loads without differential settlement? Can the school vacate one wing at a time? Is the retrofit cost below, say, 60% of replacement, and does it preserve a building of local value? Does the new frame remain independent under drift? If the client will not accept the disruption or the cost, the safer option is a separate new classroom block on the site, not a vertical extension. The architect should issue a written structural assessment, not a verbal opinion, and require a qualified structural engineer to verify the diaphragm and foundation. The presence of out-of-plane bulging means the building should not be occupied at full capacity until temporary shoring is in place. The architect should also document that the client was warned in writing before any approval.