Iran Nezam Electrical Design Exam flashcards
Iran Nezam Electrical Design Exam · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Diversity factor
- Ratio of maximum demand to connected load over a defined period; applied per load group before summing to avoid over-sizing transformers and main switchgear.
- ADMD
- After-diversity maximum demand per dwelling, typically 2–4 kVA in residential towers; used to size building transformers and main incoming feeders.
- Lumen method formula
- N = (E × A) / (Φ × UF × MF), giving the number of luminaires required for a maintained illuminance E over area A using lamp lumens, utilisation factor, and maintenance factor.
- Room index
- K = (L × W) / (H_m × (L + W)); relates room dimensions to mounting height above the working plane and drives utilisation factor selection from photometric tables.
- Maintenance factor
- Multiplier applied to lamp output to account for dirt and lumen depreciation; typically 0.8 for clean offices, 0.7 for industrial, and 0.6 for dirty environments.
- UGR limit
- Unified Glare Rating cap; ≤19 for offices and classrooms, ≤22 for general industry, and ≤25 for corridors, verified against luminaire photometric data.
- Ampacity rule
- Coordination condition I_b ≤ I_n ≤ I_z and I_2 ≤ 1.45 × I_z, where I_b is design current, I_n device rating, and I_z corrected cable capacity.
- Voltage drop three-phase
- ΔU = √3 × I × L × (R cos φ + X sin φ); the mV/A/m tabulated method gives ΔU = mV/A/m × I × L / 1000 for quick checks.
- Correction factors
- Temperature, grouping, soil, and burial factors multiply the tabulated cable capacity: I_z = I_t × k_temp × k_group × k_soil; they are multiplied, never added.
- Earth fault loop impedance
- Z_s must satisfy Z_s ≤ U_0 / I_a, where I_a is the current that trips the protective device within the required disconnection time; verified by measurement at commissioning.
- Adiabatic equation
- S = √(I²t) / k, sizing the protective conductor or earthing conductor for the let-through energy of the protective device and the conductor's k factor.
- TT system
- Installation has its own earth electrode separate from the supply neutral; RCD protection is required for socket outlets and most final circuits because loop impedance is high.
- TN-C-S system
- Combined PEN conductor upstream of the origin, split into separate PE and N at the installation origin; common for public LV supplies to buildings.
- Selectivity
- Coordination in which the upstream protective device does not trip for a fault cleared by the downstream device; verified by non-overlapping time-current curves or tested pairs.
- Form of separation
- IEC 61439-2 classification (Form 1–4b) defining internal barriers between busbars, functional units, and terminals; specifies maintainability and fault containment.
- Icw
- Rated short-time withstand current of an assembly for a stated duration (typically 1 s); a key specification for main and distribution switchboards per IEC 61439.
- Transformer fault level
- I_sc ≈ S / (√3 × U × Z_pu); typical distribution transformer impedance is 4–6%, giving fault levels that drive switchgear and cable thermal ratings.
- Dyn11 vector group
- Delta primary, star secondary with neutral brought out and 11 o'clock phase shift; common for distribution transformers and allows unbalanced LV loads with a neutral.
- Generator step load
- Acceptance of a sudden load block, typically 25–50% of rated kVA in one step; verified against manufacturer transient data and the largest motor start.
- ATS/AMF sequence
- Mains failure triggers generator start (10–15 s), transfer to generator, and retransfer with cool-down (5–10 min) after mains restoration; documented in the cause-and-effect matrix.
- UPS autonomy
- Battery runtime at rated load, specified at end-of-life capacity (typically 80%); sizing adds 20–25% spare and divides load kW by power factor and efficiency.
- Smoke detector spacing
- For flat ceilings up to 3 m, typically ≤10.6 m between detectors and ≤5.3 m from walls; spacing reduces for higher ceilings per the applicable fire code.
- Alarm audibility
- Alarm sound must be ≥65 dB(A) at all accessible points or ≥5 dB above ambient, whichever is greater, and ≥75 dB(A) at bedheads in sleeping areas.
- Fire-rated cable
- Cable with a rated survival time (e.g., PH30, PH60, PH120 or F30/F60/F120) used for life-safety circuits so they remain functional during a fire.
- Cause-and-effect matrix
- Document mapping every detection input to every required output (alarm, HVAC shutdown, lift homing, door release); forms the basis for fire system testing.
- IEC 60364
- Series of standards for low-voltage electrical installations covering protection, earthing, conductor sizing, and verification; national codes adapt it and take precedence where they differ.
- IEC 61439
- Standard for low-voltage switchgear and controlgear assemblies; specifies Form of separation, IP rating, Icw, and Ipk for panelboards and switchboards.
- IEC 62305
- Lightning protection standard; a risk assessment determines the class of lightning protection system (I–IV) and the resulting air termination, down conductor, and earthing arrangement.
- Load schedule
- Tabulation of every circuit with description, phase, kW, power factor, kVA, demand factor, diversified kVA, current, cable size, and breaker rating; the basis for all downstream sizing.
- Single-line diagram
- Schematic showing sources, transformers, switchgear, panelboards, and feeders with ratings and settings; the primary design document for fault level and coordination studies.
- Commissioning tests
- Insulation resistance, continuity, earth loop impedance, RCD trip time, polarity, and phase rotation; results recorded in test certificates before practical completion.
- Harmonic neutral current
- Triplen harmonics (3rd, 9th, 15th) add in the neutral; design neutral for 1.45–1.73 × phase current where SMPS, LED drivers, or VFDs dominate the load.