Iran Nezam Electrical Design Exam · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Load Estimation and Demand Calculations & Low-Voltage Distribution and Panelboard Design

  • Compute connected and demand loads for a 6-storey residential building using diversity factors, and tabulate results per feeder and per phase.

  • Size main and sub-panelboard busbars and incoming breakers for the calculated demand, selecting standard frame ratings.

  • Balance single-phase loads across the three phases of a distribution board and calculate the resulting neutral current.

  • Produce a one-line diagram showing the main board, sub-boards, and feeder ratings for the same building.

Your checkpoint

A load schedule spreadsheet plus a one-line diagram for a 6-storey residential building, with demand, diversity, and phase-balance calculations shown.

Week 2

Low-Voltage Distribution and Panelboard Design & Conductor Sizing, Voltage Drop, and Cable Routing

  • Select conductor cross-sections for each feeder using current-carrying capacity, correction factors for ambient temperature and grouping, and derating tables.

  • Calculate voltage drop for each feeder at full load and verify it stays within the permitted percentage at the furthest point.

  • Choose cable routing methods (tray, conduit, buried) for each feeder and justify the choice against installation conditions.

  • Size the neutral and protective conductors for each circuit and state the rule applied.

Your checkpoint

A cable schedule listing circuit, load, breaker rating, cable size, route, voltage drop percentage, and protective conductor size for every feeder in the week-1 building.

Week 3

Fault Current, Earthing, and Protection Coordination

  • Calculate prospective short-circuit current at the main board and at the furthest sub-board using transformer impedance and cable impedance.

  • Verify that breaker breaking capacity and let-through energy are adequate at each board.

  • Design the earthing system: earth electrode type, earthing conductor size, main equipotential bonding, and supplementary bonding in wet areas.

  • Check discrimination between upstream and downstream protective devices for at least three fault levels and adjust settings where needed.

Your checkpoint

A fault-current and protection-coordination study for the week-1 building, including a table of fault levels, device settings, and a discrimination check at three points.

Week 4

Electrical Building Services Design Fundamentals & Building Codes, Regulations, and National Standards

  • Map each design decision from weeks 1-3 to the relevant clause of the national building electrical code and record the clause number.

  • List the mandatory inspections and tests required before energizing a new installation, with acceptance criteria.

  • Identify code requirements for wet locations, bathrooms, kitchens, and common areas and note where the week-1 design must be revised.

  • Summarize the roles and liabilities of the designer and supervisor under the national regulations.

Your checkpoint

A code-compliance checklist of at least 40 items, each with clause reference, compliance status for the week-1 design, and corrective action where non-compliant.

Week 5

Lighting Design and Illumination Calculations

  • Perform lumen-method illuminance calculations for an office, a corridor, and a parking area, selecting luminaires and maintenance factors.

  • Verify calculated illuminance against the recommended maintained levels for each space type.

  • Lay out luminaires on a reflected ceiling plan and check uniformity and glare control.

  • Calculate the lighting load for each space and add it to the load schedule from week 1.

Your checkpoint

A lighting design package for three space types: layout drawing, lumen calculation sheet, illuminance verification table, and updated load contribution.

Week 6

Transformers, Generators, and Emergency Power Systems

  • Size a distribution transformer for the building load, including spare capacity and derating for altitude and ambient temperature.

  • Select and size a standby generator for essential loads, and define the automatic transfer scheme and its changeover time.

  • Design the emergency lighting and exit-sign circuit so it transfers to the generator or battery supply within the required time.

  • Calculate generator fuel consumption and starting capacity for the largest motor load.

Your checkpoint

A transformer and generator sizing report with calculation sheets, transfer scheme description, and emergency lighting circuit design.

Week 7

Fire Detection, Alarm, and Life-Safety Electrical Systems

  • Design a fire detection system for a commercial floor: detector type and spacing per area, manual call points, and sounders.

  • Calculate sound pressure levels at the furthest point and verify audibility above ambient noise.

  • Draw the fire alarm zone and loop wiring diagram and specify cable types with fire-resistance ratings.

  • Integrate fire alarm cause-and-effect actions with the transfer scheme, lifts, and smoke control from week 6.

Your checkpoint

A fire detection and alarm design for one commercial floor, including device layout, sound-pressure calculation, loop diagram, and cause-and-effect matrix.

Week 8

Design Documentation, Specifications, and Supervision Duties & Electrical Building Services Design Fundamentals & Building Codes, Regulations, and National Standards

  • Assemble a complete design documentation set: drawings index, specifications, calculation book, and bill of quantities.

  • Write technical specifications for cables, boards, transformers, and the fire alarm system using standard clauses.

  • Prepare a supervision plan listing inspection hold points, test records, and handover documents.

  • Complete two timed mock exams covering all ten domains and review every wrong answer against the source clause.

Your checkpoint

A full design documentation package for the building, plus a scored mock-exam review log with at least 30 corrected weak points.

Milestones

Week 2: Can size any feeder for ampacity and voltage drop without referring to worked examples, and explain each correction factor applied.

Week 4: Score at least 70% on a self-made 30-question quiz covering domains 1-5 and 9, with every missed item traced to a code clause.

Week 6: Produce transformer and generator sizing calculations from a blank sheet in under 45 minutes with correct unit handling.

Week 8: Complete both mock exams within time and score at least 75% overall, with no domain below 60%.