An arterial corridor in a city of 900,000 carries 18,000 passengers per hour per direction at peak in mixed traffic: two general lanes each way, a 22 m right-of-way, and a 3.2 km length. Average bus speed is 11 km/h; 40% of motorized trips on the corridor are under 3 km. Pedestrian crossings are 400 m apart, and crash data show 14 pedestrian injuries in two years. The roads department proposes widening to three lanes each way, which requires removing 2.5 m of sidewalk on each side and 60 mature trees. A transport consultant proposes a median BRT with 1.5 lanes per direction for general traffic, 26 m stations, and signal priority. Peak car occupancy is 1.3. The mayor wants a decision before the next budget cycle.

1. Assess whether widening can solve the peak problem, using the numbers in the setup.

Read the worked answer

Widening cannot solve the peak. The corridor carries 18,000 persons per hour per direction in mixed traffic. Adding one general lane each way adds roughly 1,800-2,000 vehicles per hour per lane at ideal conditions, or about 2,300-2,600 persons at 1.3 occupancy. That is a small fraction of 18,000, and it is optimistic because the corridor already has intersections, crossings, and only 22 m of space.

The 40% of trips under 3 km are the key. A large share of car trips are short and could shift to walking, cycling, or bus if those are made attractive. Widening removes 2.5 m of sidewalk on each side and 60 mature trees, which worsens pedestrian safety and comfort and induces additional car travel. The 14 pedestrian injuries in two years point to a design and speed problem, not a capacity problem. The roads department is counting vehicles, not people.

2. Compare BRT and widening on person throughput, induced demand, safety, and cost.

Read the worked answer

Person throughput: a median BRT with 26 m stations and signal priority can move roughly 8,000-20,000 persons per hour per direction depending on bus size and headway. Even a conservative 12,000 exceeds the incremental capacity of one extra general lane. Widening moves more cars but fewer people per meter of right-of-way.

Induced demand: extra car capacity fills over time, so the peak returns. BRT with priority protects bus speed and reliability and can be upgraded.

Safety: BRT with median stations and signalized crossings reduces conflicts. Widening with narrower sidewalks increases pedestrian exposure.

Cost: widening requires utility relocation, tree loss, and land. BRT requires stations, buses, and repaving but uses the same 22 m. The fair comparison is person-delay and safety, not vehicle level of service.

3. What would you recommend, and what design conditions would you attach?

Read the worked answer

Recommend the BRT, with conditions.

  • Keep 1.5 general lanes per direction only if a traffic model shows acceptable local access; otherwise use one general lane plus turn pockets.
  • Maintain at least 3 m clear sidewalks on both sides and plant replacement trees.
  • Add crossings every 200-250 m, especially near schools and markets.
  • Provide level boarding, shelter, and secure bicycle parking at stations.
  • Use camera enforcement of the bus lane and a defined freight and delivery window.

Before construction, publish a monitoring plan: bus speed (target 20-25 km/h), ridership, pedestrian injuries, sidewalk width, and peak car delay. If the corridor's through traffic is largely external, add a parallel route or a cordon charge rather than taking right-of-way from pedestrians. Frame the decision as a person-throughput and safety project, not a war on cars.