CIT study plan
CIT · Give each week a clear focus.
8 weeks · About 7 hours per week
Irrigation hydraulics and system design fundamentals
Define and distinguish static pressure, dynamic pressure, operating pressure, and pressure loss, and convert between PSI, feet of head, and GPM/LPM
Compute flow velocity and friction loss for common irrigation pipe sizes using a friction-loss chart or table
Calculate available flow and pressure at the point of connection given meter size, service line size, and elevation change
Explain how elevation gain/loss changes pressure in a closed vs. open system using 0.433 PSI per foot of elevation
Your checkpoint
A one-page hydraulic reference sheet with 10 fully worked pressure/flow/friction-loss problems and correct units on every answer
Irrigation hydraulics and system design fundamentals
Match zone flow demand to available supply by summing emitter/head flows per zone
Select lateral and mainline pipe diameters that keep velocity within acceptable limits and friction loss budgeted
Determine precipitation rate for a head type and spacing, and identify matched-precipitation issues
Lay out valve zones and size a backflow device and meter to the design flow demand
Your checkpoint
A complete design packet for a 6-zone residential system: zone flow table, pipe-size selection, pressure budget from POC to farthest head, and precipitation-rate calculations
Electrical and control systems (controllers, valves, wiring, sensors)
Apply Ohm's law and series/parallel resistance rules to 24 VAC valve circuits and controller output loads
Trace and label a valve-to-controller wiring run including common wire, hot wires, and wire-nut/splice locations
Diagnose a non-opening valve using voltage, resistance, solenoid, and continuity measurements in a defined sequence
Configure controller programs: start times, run times, soak/cycle, seasonal adjust, and sensor bypass
Explain how rain, soil-moisture, and flow sensors interrupt or modify a schedule
Your checkpoint
A hand-drawn system wiring diagram plus a one-page electrical troubleshooting flow chart listing expected voltage and resistance readings at each test point
System components and materials (heads, pipe, fittings, pumps, filters) & Backflow prevention and cross-connection control
Compare spray, rotor, rotary nozzle, bubbler, and drip emitters on flow, radius, pressure requirement, and application suitability
Select pipe, fittings, and valves by material, pressure rating, and application (PVC solvent-weld vs. poly insert, gate/globe/angle)
Size and match a pump to a system curve, and select the correct filter mesh for drip vs. spray
Identify the type of backflow assembly required for a given hazard level and explain the difference between RPZ, DCVA, PVB, and AVB
Determine where a backflow assembly must be located and what conditions make it compliant
Your checkpoint
A component specification matrix covering at least 10 devices (heads, valves, pipe, pump, filter, backflow) with flow, pressure rating, and typical use, plus a written backflow-device selection rationale for 4 scenarios
Maintenance, troubleshooting, and repair & Installation practices, trenching, and site preparation
Build a symptom-to-cause diagnostic sequence for low pressure, uneven coverage, dry spots, and continuously running valves
Perform systematic head-to-head coverage and pressure audits and document findings in a standard inspection form
Locate and repair a lateral or mainline leak involving trenching, cutting, coupling, and re-pressurizing
Describe correct trenching depth, bedding, slope, and marking requirements and prepare a site for a mainline run
Sequence a start-up and winterization procedure for both a poly and a PVC system
Your checkpoint
A troubleshooting decision tree covering 8 common field faults, plus a completed mock site-audit form with findings and recommended repairs
Installation practices, trenching, and site preparation & Backflow prevention and cross-connection control
Plan a full installation sequence from site assessment through flush, charge, and walk-through
Identify utility locate requirements, permit needs, and inspection checkpoints before breaking ground
Select proper thrust-blocking, transition fittings, and support where mainline changes direction or material
Explain backflow testing intervals, who may test, and how test records are documented in a typical jurisdiction
Describe cross-connection hazards from chemigation, hose bibbs, and submerged valves and the required protective devices
Your checkpoint
An installation SOP checklist covering pre-trench through final walk-through, plus a backflow/cross-connection compliance checklist referencing typical code requirements
Safety, codes, and water-management regulations & Maintenance, troubleshooting, and repair
Summarize electrical safety requirements for valve and controller work: lockout, GFCI protection, low-voltage vs. line-voltage separation
Interpret common water-management rules such as watering-day limits, run-off restrictions, and sensor requirements
Apply trenching and excavation safety rules for working near utilities and in open trenches
Identify the personal protective equipment and site practices required for valve boxes, chemical handling, and glue/solvent use
Review the top failure points for controllers, solenoids, and valves and the preventive maintenance interval for each
Your checkpoint
A one-page compliance and safety reference sheet mapping each rule to the on-site action it requires, plus a preventive-maintenance calendar for the year
Irrigation hydraulics and system design fundamentals & Electrical and control systems (controllers, valves, wiring, sensors) & System components and materials (heads, pipe, fittings, pumps, filters) & Installation practices, trenching, and site preparation & Maintenance, troubleshooting, and repair & Backflow prevention and cross-connection control & Safety, codes, and water-management regulations
Re-derive the hydraulic formulas and unit conversions from memory without notes
Reproduce the backflow-device selection logic and placement rules from memory
Complete timed practice sets weighted by domain percentage to build pace and question triage
Catalog every missed or uncertain item and convert each into a corrected flashcard with the verified answer
Simulate exam-day conditions with a full-length timed test and review every error
Your checkpoint
A scored full-length timed practice exam with a written error log and a set of corrected flashcards for every missed item
Milestones
Week 2: Complete the 6-zone design packet with no unit errors and correctly computed pressure budget from point of connection to the farthest head; score at least 80% on a self-made 20-question hydraulics set
Week 4: Explain aloud, without notes, the difference between RPZ, DCVA, PVB, and AVB, state when each is required, and sketch a compliant backflow installation layout
Week 6: Run through the installation SOP and backflow compliance checklist end to end and correctly diagnose 8 of 10 field-fault scenarios on the troubleshooting decision tree
Week 8: Score 80% or higher on the timed full-length practice exam, with no domain scoring below 70%, and a complete error log converted into flashcards