CIT · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Irrigation hydraulics and system design fundamentals

  • Define and distinguish static pressure, dynamic pressure, operating pressure, and pressure loss, and convert between PSI, feet of head, and GPM/LPM

  • Compute flow velocity and friction loss for common irrigation pipe sizes using a friction-loss chart or table

  • Calculate available flow and pressure at the point of connection given meter size, service line size, and elevation change

  • Explain how elevation gain/loss changes pressure in a closed vs. open system using 0.433 PSI per foot of elevation

Your checkpoint

A one-page hydraulic reference sheet with 10 fully worked pressure/flow/friction-loss problems and correct units on every answer

Week 2

Irrigation hydraulics and system design fundamentals

  • Match zone flow demand to available supply by summing emitter/head flows per zone

  • Select lateral and mainline pipe diameters that keep velocity within acceptable limits and friction loss budgeted

  • Determine precipitation rate for a head type and spacing, and identify matched-precipitation issues

  • Lay out valve zones and size a backflow device and meter to the design flow demand

Your checkpoint

A complete design packet for a 6-zone residential system: zone flow table, pipe-size selection, pressure budget from POC to farthest head, and precipitation-rate calculations

Week 3

Electrical and control systems (controllers, valves, wiring, sensors)

  • Apply Ohm's law and series/parallel resistance rules to 24 VAC valve circuits and controller output loads

  • Trace and label a valve-to-controller wiring run including common wire, hot wires, and wire-nut/splice locations

  • Diagnose a non-opening valve using voltage, resistance, solenoid, and continuity measurements in a defined sequence

  • Configure controller programs: start times, run times, soak/cycle, seasonal adjust, and sensor bypass

  • Explain how rain, soil-moisture, and flow sensors interrupt or modify a schedule

Your checkpoint

A hand-drawn system wiring diagram plus a one-page electrical troubleshooting flow chart listing expected voltage and resistance readings at each test point

Week 4

System components and materials (heads, pipe, fittings, pumps, filters) & Backflow prevention and cross-connection control

  • Compare spray, rotor, rotary nozzle, bubbler, and drip emitters on flow, radius, pressure requirement, and application suitability

  • Select pipe, fittings, and valves by material, pressure rating, and application (PVC solvent-weld vs. poly insert, gate/globe/angle)

  • Size and match a pump to a system curve, and select the correct filter mesh for drip vs. spray

  • Identify the type of backflow assembly required for a given hazard level and explain the difference between RPZ, DCVA, PVB, and AVB

  • Determine where a backflow assembly must be located and what conditions make it compliant

Your checkpoint

A component specification matrix covering at least 10 devices (heads, valves, pipe, pump, filter, backflow) with flow, pressure rating, and typical use, plus a written backflow-device selection rationale for 4 scenarios

Week 5

Maintenance, troubleshooting, and repair & Installation practices, trenching, and site preparation

  • Build a symptom-to-cause diagnostic sequence for low pressure, uneven coverage, dry spots, and continuously running valves

  • Perform systematic head-to-head coverage and pressure audits and document findings in a standard inspection form

  • Locate and repair a lateral or mainline leak involving trenching, cutting, coupling, and re-pressurizing

  • Describe correct trenching depth, bedding, slope, and marking requirements and prepare a site for a mainline run

  • Sequence a start-up and winterization procedure for both a poly and a PVC system

Your checkpoint

A troubleshooting decision tree covering 8 common field faults, plus a completed mock site-audit form with findings and recommended repairs

Week 6

Installation practices, trenching, and site preparation & Backflow prevention and cross-connection control

  • Plan a full installation sequence from site assessment through flush, charge, and walk-through

  • Identify utility locate requirements, permit needs, and inspection checkpoints before breaking ground

  • Select proper thrust-blocking, transition fittings, and support where mainline changes direction or material

  • Explain backflow testing intervals, who may test, and how test records are documented in a typical jurisdiction

  • Describe cross-connection hazards from chemigation, hose bibbs, and submerged valves and the required protective devices

Your checkpoint

An installation SOP checklist covering pre-trench through final walk-through, plus a backflow/cross-connection compliance checklist referencing typical code requirements

Week 7

Safety, codes, and water-management regulations & Maintenance, troubleshooting, and repair

  • Summarize electrical safety requirements for valve and controller work: lockout, GFCI protection, low-voltage vs. line-voltage separation

  • Interpret common water-management rules such as watering-day limits, run-off restrictions, and sensor requirements

  • Apply trenching and excavation safety rules for working near utilities and in open trenches

  • Identify the personal protective equipment and site practices required for valve boxes, chemical handling, and glue/solvent use

  • Review the top failure points for controllers, solenoids, and valves and the preventive maintenance interval for each

Your checkpoint

A one-page compliance and safety reference sheet mapping each rule to the on-site action it requires, plus a preventive-maintenance calendar for the year

Week 8

Irrigation hydraulics and system design fundamentals & Electrical and control systems (controllers, valves, wiring, sensors) & System components and materials (heads, pipe, fittings, pumps, filters) & Installation practices, trenching, and site preparation & Maintenance, troubleshooting, and repair & Backflow prevention and cross-connection control & Safety, codes, and water-management regulations

  • Re-derive the hydraulic formulas and unit conversions from memory without notes

  • Reproduce the backflow-device selection logic and placement rules from memory

  • Complete timed practice sets weighted by domain percentage to build pace and question triage

  • Catalog every missed or uncertain item and convert each into a corrected flashcard with the verified answer

  • Simulate exam-day conditions with a full-length timed test and review every error

Your checkpoint

A scored full-length timed practice exam with a written error log and a set of corrected flashcards for every missed item

Milestones

Week 2: Complete the 6-zone design packet with no unit errors and correctly computed pressure budget from point of connection to the farthest head; score at least 80% on a self-made 20-question hydraulics set

Week 4: Explain aloud, without notes, the difference between RPZ, DCVA, PVB, and AVB, state when each is required, and sketch a compliant backflow installation layout

Week 6: Run through the installation SOP and backflow compliance checklist end to end and correctly diagnose 8 of 10 field-fault scenarios on the troubleshooting decision tree

Week 8: Score 80% or higher on the timed full-length practice exam, with no domain scoring below 70%, and a complete error log converted into flashcards