ISA CCST Level II flashcards
ISA CCST Level II · Build recall with a focused review session.
33 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Calibration error formula
- Error equals indicated value minus true reference value. Report it as percent of span, percent of reading, or percent of upper range value, and always state which basis was used.
- Five-point calibration check
- A check at 0, 25, 50, 75, and 100 percent of span, run both upscale and downscale. It reveals hysteresis, deadband, and linearity in a single pass.
- Hysteresis versus deadband
- Hysteresis is the difference between upscale and downscale indication at the same input after a full-range excursion. Deadband is the largest input change that produces no measurable output change.
- Live zero purpose
- A 4–20 mA signal uses 4 mA at the lower range value, so a true zero reading is distinguishable from a broken wire or dead instrument.
- Milliamp to percent conversion
- Percent of span equals (mA minus 4) divided by 16, times 100. So 8 mA is 25 percent, 12 mA is 50 percent, and 16 mA is 75 percent.
- Test uncertainty ratio
- The reference standard should be at least four times more accurate than the device under test. This ratio keeps the standard's contribution to test uncertainty small.
- As-found versus as-left
- As-found data records drift before any adjustment and shows whether the device was in tolerance. As-left data proves the instrument was returned within tolerance after calibration.
- Zero then span rule
- On most analog transmitters, set zero at the lower range value first, then span at the upper range value. Re-check zero afterward on non-interactive designs.
- Manifold equalize sequence
- Equalize before opening the low side, and close the equalize valve before returning the transmitter to service. This protects the sensor from overrange differential pressure.
- Impulse line slope rule
- Gas and liquid impulse lines slope at least one in twelve. Steam lines are filled with condensate using a condensate pot, and lines are blown down before commissioning.
- Loop burden budget
- Total loop resistance, including receiver, wiring, and barriers, must stay below the transmitter's rated maximum load at the available supply voltage.
- Intrinsic safety maintenance rule
- Keep the hazardous-area device, barrier, and cable parameters within the entity or system approval. Never substitute uncertified parts, because that voids the safety certification.
- Ground loop diagnosis
- Noise, offset, and drifting readings often come from multiple earth connections. Ground cable shields at one end only and isolate the signal from earth elsewhere.
- Valve seat leakage class
- Seat leakage is specified by class, such as ANSI/FCI 70-2. Verify leakage against the specified class during maintenance, not simply that the valve closes.
- Preventive maintenance drivers
- Maintenance intervals are set by criticality, environment, and manufacturer recommendation. Instrument air quality, meaning dew point, oil, and particulate, drives many pneumatic failures.
- Split-the-loop troubleshooting
- Verify the symptom at the indicator, then divide the loop into field device, wiring, I/O card, controller, and HMI. Testing each half halves the search space.
- Signal substitution test
- Drive the loop with a milliamp source at the marshalling terminal. If the system responds correctly, the fault is field-side; if not, it is system-side.
- NAMUR NE43 fault band
- Values below 3.6 mA or above 21 mA are reserved for fault signalling on 4–20 mA devices. Check the configured fault direction before assuming a process change.
- Valve fails to stroke
- Check supply pressure at the actuator, then positioner output, then actuator diaphragm integrity, then stem or packing seizure. Work outward from the air supply.
- Repair record content
- A repair record states root cause, parts replaced, calibration as-left values, and any temporary workaround still in place. It supports later failure analysis.
- Intermittent signal causes
- Loose terminal torque, corrosion, and shield drain faults cause a large share of intermittent signals. Check terminations before condemning the instrument.
- Commissioning sequence
- Mechanical completion, leak test, instrument air blowdown, power-up, loop check, functional test, then first line-up and start-up. Each stage gates the next.
- Loop check definition
- A loop check verifies continuity from field device through marshalling, I/O card, controller tag, and graphic. One device, one tag, correct direction and scaling.
- Cold versus hot loop check
- A cold loop check verifies wiring and signal path only, with no process. A hot loop check is performed with process or simulated process at operating conditions.
- Cause-and-effect matrix test
- Each row of the cause-and-effect matrix is tested individually to prove that interlocks and shutdowns act as designed. Every row is signed off.
- SIF proof test scope
- A safety instrumented function proof test must demonstrate the full function including the final element, not only the sensor, and record detected and undetected failures.
- Punch list categories
- Category A prevents start-up, B must close before handover, and C may close after handover. Each item closes with documented evidence.
- Instrument index role
- The instrument index is the master register of tags. The I/O list must reconcile to it, and the difference count measures documentation quality.
- ISA-5.1 tag consistency
- The tag format of area, loop number, and function letters must be identical across the index, drawings, database, and field labels. Mismatches cause start-up trips.
- Work breakdown structure
- The work breakdown structure decomposes scope into installable packages. The schedule links them with dependencies and milestones such as mechanical completion and loop check complete.
- Turnover package contents
- The turnover package includes as-built drawings, calibration records, loop folders, vendor manuals, and training records. It transfers documented evidence to the owner.
- Earned value indices
- Cost performance index equals earned value divided by actual cost. Schedule performance index equals earned value divided by planned value. Below one means over budget or behind schedule.
- Contract risk allocation
- Lump sum shifts quantity risk to the contractor. Reimbursable or time-and-materials shifts it to the owner. Unit price shares quantity risk between both parties.