CGRC study materials
CGRC study resources

CGRC study plan

CGRC · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Security and Privacy Governance, Risk Management, and Compliance Program

  • Diagram the governance hierarchy and map decision rights for executives, the risk executive function, the authorizing official, and the system owner to the artifacts each produces.

  • Explain the risk management process components (frame, assess, respond, monitor) and match each to a concrete governance artifact.

  • Differentiate laws, regulations, standards, policies, and procedures and supply one CGRC-relevant example of each.

  • Build a glossary of at least 30 Domain 1 terms, including risk appetite, risk tolerance, inherent risk, residual risk, and the four risk response types.

  • Identify privacy and ethical obligations that constrain a security and privacy compliance program.

Your checkpoint

A one-page governance and risk process map plus a 30-term Domain 1 glossary, self-quizzed to at least 90% accuracy.

Week 2

Security and Privacy Governance, Risk Management, and Compliance Program & Scope of the System

  • Perform a FIPS 199 categorization across confidentiality, integrity, and availability for a sample system and justify the resulting high-water mark.

  • Draw a system boundary that separates system components, interconnected systems, and the environment of operation.

  • Document system registration inputs: mission or business function, information types, user populations, and deployment environment.

  • Trace how organizational risk tolerance translates into system-level risk decisions and categorization choices.

  • Re-test Domain 1 weak areas identified in the week 1 self-quiz.

Your checkpoint

A completed system scoping and categorization worksheet for a fictional system, including boundary diagram, FIPS 199 table, and registration inputs.

Week 3

Selection and Approval of Framework, Security, and Privacy Controls

  • Compare at least three control frameworks (for example NIST, ISO/IEC 27001, COBIT) on purpose, structure, and applicability, and select one for a scenario with written rationale.

  • Select a NIST SP 800-53B baseline that matches the FIPS 199 categorization and document tailoring decisions, including scoping, parameterization, and compensating controls.

  • Classify controls as common, hybrid, or system-specific and assign inheritance responsibility to a named owner.

  • Assemble a control selection package that supports authorizing official approval, including justification for every deviation from the baseline.

Your checkpoint

A framework selection memo plus a tailored control baseline spreadsheet with common, hybrid, and system-specific designations.

Week 4

Implementation of Security and Privacy Controls

  • Write implementation statements that state what is done, where, how, by whom, and with what evidence, avoiding future-tense placeholders.

  • Distinguish implemented, planned, alternative, and not-applicable control states and record each correctly in the system security plan.

  • Specify the evidence each control will generate, such as configuration exports, screenshots, signed policies, or log samples.

  • Sequence implementation tasks against dependencies, resource constraints, and a schedule.

  • Review the system security plan against a quality checklist before peer review.

Your checkpoint

A system security plan draft covering at least 20 controls with complete implementation statements and a matching evidence inventory.

Week 5

Assessment/Audit of Security and Privacy Controls

  • Write an assessment plan that specifies objectives, methods, sampling approach, scope, and assessor independence requirements.

  • Apply the examine, interview, and test methods to at least five controls and record objective evidence for each.

  • Separate findings from observations and rate each by likelihood and impact.

  • Draft per-control determination statements and assemble them into a security assessment report.

Your checkpoint

A complete assessment plan and a security assessment report for 10 controls, with evidence citations and risk ratings.

Week 6

System Compliance

  • Compare authorization decisions (ATO, DATO, IATO, denial) and identify the residual risk each one accepts and who accepts it.

  • Assemble an authorization package from the system security plan, security assessment report, and plan of action and milestones, and defend its completeness.

  • Write plan of action and milestones entries with milestones, resources, responsible parties, and remediation dates.

  • Draft a continuous monitoring strategy that is explicitly tied to the authorization decision and its conditions.

Your checkpoint

A mock authorization package containing an ATO memo, a five-entry plan of action and milestones, and a continuous monitoring strategy summary.

Week 7

Compliance Maintenance

  • Design a continuous monitoring calendar covering automated data feeds, annual assessments, and control re-testing cadence.

  • Explain how change management, significant-change triggers, and reauthorization decisions connect to one another.

  • Define compliance metrics and reporting cadence for executives and the authorizing official.

  • Re-test the three weakest domains identified by prior quizzes and close at least ten gaps.

Your checkpoint

A 12-month continuous monitoring calendar with owners, frequencies, and escalation triggers, plus a one-page executive compliance dashboard.

Week 8

Security and Privacy Governance, Risk Management, and Compliance Program & Scope of the System & Selection and Approval of Framework, Security, and Privacy Controls & Implementation of Security and Privacy Controls & Assessment/Audit of Security and Privacy Controls & System Compliance & Compliance Maintenance

  • Complete two timed 125-question practice exams under exam conditions and score at least 80% on each.

  • Convert every missed question into a one-line knowledge gap note and close the 15 highest-priority gaps.

  • Recite all seven domains and their key artifacts from memory in under ten minutes.

  • Finalize exam-day logistics, including scheduling, identification, and time-management plan.

Your checkpoint

A practice exam score log showing at least 80% on both attempts, a closed gap list, and a one-page exam-day plan.

Milestones

Week 2: Categorization worksheet is complete and defensible: boundary, FIPS 199 ratings, and high-water mark all agree with each other.

Week 4: Score at least 80% on a 40-question mixed quiz covering domains 1 through 4, and obtain peer review sign-off on the system security plan quality checklist.

Week 6: Mock authorization package passes an internal completeness review with zero missing artifacts across the system security plan, security assessment report, and plan of action and milestones.

Week 8: Both timed practice exams scored at least 80%, and no domain scored below 70% on either attempt.