ISO 13485 LA flashcards
ISO 13485 LA · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Medical Device File
- A documented set of records for each device or device family that demonstrates conformity to ISO 13485 and applicable regulatory requirements, including design, production, and post-market information.
- Objective Evidence
- Records, statements of fact, or other verifiable information that can be checked and confirmed, used by auditors to evaluate conformity against audit criteria.
- Major Nonconformity
- A finding indicating a systemic failure, absence of a required control, or a condition that would likely result in the device not meeting requirements or regulatory obligations.
- Audit Criteria
- The set of requirements used as a reference against which objective evidence is compared, such as ISO 13485 clauses, regulations, and the organization's own procedures.
- Process Approach
- A management principle where activities are understood and managed as interrelated processes, with their inputs, outputs, sequence, and interaction defined and measured for effectiveness.
- Design Transfer
- The activity ensuring that design outputs are translated into production specifications and that manufacturing processes can consistently produce the device as designed.
- Management Review
- A planned top-management activity reviewing QMS suitability, adequacy, and effectiveness, with defined inputs such as audit results and outputs including improvement actions.
- Corrective Action
- Action taken to eliminate the cause of a detected nonconformity and prevent recurrence, requiring root cause analysis and verification of effectiveness.
- Audit Plan
- A document describing the activities and arrangements for an audit, including scope, criteria, schedule, auditor assignments, and processes to be audited.
- Opening Meeting
- A meeting at the start of an audit to confirm the audit plan, scope, criteria, schedule, and communication arrangements with the auditee's management.
- Audit Sampling
- Selecting a subset of records or activities for examination, based on risk, criticality, and volume, with the rationale documented in the audit records.
- Auditor Competence
- The demonstrated ability to apply knowledge, skills, and personal attributes to conduct audits, maintained through education, training, experience, and evaluation.
- Nonconformity Report
- A document recording a nonconformity that states the requirement, the objective evidence observed, and the specific location or record where the finding was identified.
- Triangulation
- Confirming a finding by gathering evidence from multiple independent sources, such as interviews, observation, and records, before concluding nonconformity.
- Closing Meeting
- A meeting at the end of an audit where findings and conclusions are presented to the auditee, and corrective action expectations and timelines are discussed.
- Audit Report
- A document recording the audit scope, criteria, findings, conclusions on conformity, and any limitations, distributed to authorized parties after the audit.
- Corrective Action Verification
- The process of confirming that actions taken in response to a nonconformity have been implemented and are effective in preventing recurrence.
- Audit Program
- A set of one or more audits planned for a specific timeframe and purpose, managed to ensure coverage of QMS processes and effective use of audit resources.
- Audit Program Manager
- The person responsible for establishing, implementing, monitoring, and reviewing an audit program, including resource allocation and auditor competence.
- Auditor Independence
- The principle that auditors must not audit their own work or have a conflict of interest, ensuring impartiality and objectivity in audit conclusions.
- Documented Information
- Information required to be controlled and maintained by the organization, including procedures and records, covering both creation and retention requirements.
- Validation
- Confirmation through objective evidence that requirements for a specific intended use or application have been fulfilled, often through testing or clinical evaluation.
- Verification
- Confirmation through objective evidence that specified requirements have been fulfilled, typically applied at each stage of design and production.
- Risk-Based Thinking
- An approach that considers risks and opportunities in planning and controlling QMS processes and product realization, linking to ISO 14971 risk management.
- Supplier Evaluation
- The process of assessing and selecting suppliers based on defined criteria, and monitoring their performance to ensure purchased product meets requirements.
- Contamination Control
- Requirements to control the work environment and personnel to prevent contamination of product, particularly important for sterile and cleanroom-manufactured devices.
- Audit Scope
- The extent and boundaries of an audit, including the organizational units, processes, locations, and time period covered by the audit.
- Checklist Tailoring
- Adapting audit checklists to the specific audit criteria, processes, and risks of the organization rather than using a generic template unchanged.
- Follow-Up Audit
- An audit conducted after corrective actions are implemented to verify their effectiveness, often required after major nonconformities.
- Audit Conclusion
- The auditor's judgment on the conformity of the audited QMS against the audit criteria, based on the objective evidence gathered during the audit.
- Audit Frequency
- The planned interval between audits of a process or area, determined by risk, criticality, prior results, and regulatory requirements within the audit program.
- Auditor Rotation
- The practice of assigning different auditors to successive audits of the same area to reduce familiarity bias and maintain objectivity.