ISO 45001 LA flashcards
ISO 45001 LA · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Occupational health and safety
- Conditions and factors at a workplace that affect, or could affect, the health and safety of workers and other persons, covering physical, mental and cognitive aspects of work.
- Hazard
- A source with the potential to cause injury and ill health, such as a chemical, machine, work practice, work organisation factor, or an environmental condition at the workplace.
- OH&S risk
- The combination of the likelihood of occurrence of a work-related hazardous event or exposure and the severity of injury and ill health that the event or exposure can cause.
- Hierarchy of controls
- ISO 45001 order for reducing risk: eliminate the hazard, substitute, apply engineering controls and reorganisation of work, use administrative controls including training, and finally personal protective equipment.
- Consultation and participation
- ISO 45001 clause 5.4 processes giving workers at all levels the means to contribute to OH&S decisions and to be consulted on matters affecting their health and safety.
- Context of the organisation
- Clause 4.1 requirement to determine external and internal issues, including cultural, social, legal, technological and organisational factors, that affect the ability to achieve intended OH&S outcomes.
- OH&S policy
- Documented top management commitment including providing safe and healthy working conditions, fulfilling legal and other requirements, eliminating hazards and reducing risks, consultation and participation, and continual improvement.
- Management of change
- Clause 8.1.3 process for controlling planned permanent or temporary changes, assessing new hazards and consequences before implementation and considering knowledge, information and legal requirements.
- Evaluation of compliance
- Clause 9.1.2 process to evaluate fulfilment of legal and other requirements, with the frequency and method determined by the organisation and results retained as documented information.
- Incident and corrective action
- Clause 10.2 requirement to react to incidents and nonconformities, investigate root causes, determine and implement action, review effectiveness, and update risks and opportunities from planning.
- Objectives and planning
- Clause 6.2 requires measurable (where practicable) OH&S objectives consistent with policy, with planned actions specifying what, resources, who, timeframe and how results are evaluated.
- Audit criteria
- The set of requirements used as a reference against which audit evidence is compared, such as ISO 45001, the OH&S policy, procedures, contracts, and applicable legal and other requirements.
- Audit evidence
- Records, statements of fact or other verifiable information relevant to the audit criteria; evidence must be objective and is gathered by sampling within the agreed audit scope.
- Fair presentation
- Audit principle requiring truthful, accurate, objective and timely reporting of significant audit findings, audit conclusions and unresolved divergences of opinion between the audit team and the auditee.
- Audit finding
- Result of evaluating collected audit evidence against audit criteria; findings indicate conformity or nonconformity and may also record risks, opportunities and improvement points supporting the audit conclusion.
- Independence
- Audit principle requiring objectivity and impartiality of the audit conclusion; auditors must not audit their own work or activities for which they carry direct responsibility.
- Audit plan
- Description of arrangements for a specific audit: objectives, criteria, scope, dates and locations, expected time, roles, resources, communication and reporting arrangements, prepared by the team leader.
- Stage 1 audit
- Initial certification assessment reviewing documented information and site-specific conditions, evaluating readiness for stage 2 and identifying areas of concern to be examined in depth later.
- Audit scope
- The agreed extent and boundaries of an audit, including locations, functions, activities, processes, shifts and time period covered, consistent with the OH&S management system scope.
- Work documents
- Checklists, forms and sampling plans used by the audit team to guide and record evidence; they support but never replace the auditor's judgement or limit additional investigation needed.
- Opening meeting
- Formal start-of-audit meeting, chaired by the team leader, confirming plan, criteria, scope, communication, sampling and safety arrangements and resolving any misunderstanding before evidence gathering.
- Audit sampling
- Selecting less than the whole population of items for evidence, based on risk, importance, complexity and resources; samples are not fully representative, so findings need corroboration.
- Major nonconformity
- Nonconformity affecting the management system's capability to achieve intended results, a systemic failure, or a significant unmet requirement, normally blocking certification until corrective action is verified.
- Audit trail
- Technique of following a process, activity or record through each stage from planning to execution and back, verifying implementation and effectiveness of controls along the whole sequence.
- Technical expert
- Person who provides specific knowledge or expertise relevant to the audit team, such as OH&S technology or legal matters, giving advice without acting as an auditor.
- Audit conclusion
- Outcome of an audit, reached after considering the audit objectives and all findings, describing conformity with criteria, system effectiveness and any recommendations or required follow-up.
- Audit report
- Formal, dated record issued by the team leader containing objectives, scope, criteria, participants, findings, conclusions, degree of conformity, divergent opinions and any agreed follow-up requirements.
- Follow-up verification
- Post-audit activity confirming that corrections and corrective actions for nonconformities have been implemented and are effective, typically required before a certification decision is taken.
- Completing the audit
- Point at which all activities in the agreed audit plan are accomplished or otherwise agreed with the client, the report is distributed, and audit records are retained.
- Audit programme
- Arrangements for one or more audits planned for a specific time frame and purpose, including objectives, schedule, scope, criteria, resources and the processes for monitoring and improving it.
- Programme manager
- Person responsible for establishing, implementing, monitoring, reviewing and improving the audit programme, including resourcing it and ensuring auditor competence and performance.
- Combined audit
- Audit carried out together at a single auditee on two or more management systems, for example ISO 45001 together with ISO 9001 and ISO 14001 in one audit visit.