A plant surveys steam traps on a 150 psig saturated steam header, where saturation temperature is about 198 °C. An inverted-bucket trap on a drip leg has a downstream pipe reading of 120 °C at 0.5 m from the trap and 95 °C at 2 m. The technician declares the trap “failed open” because the downstream pipe is hot, and recommends replacement. The pipe is insulated except at the measurement points, and the trap cycles audibly. A second trap of the same type on a parallel drip leg has a downstream reading of 70 °C at the same distance and is considered good. The plant has a history of replacing traps that later proved normal. The survey was performed at steady load, but the trap discharge line feeds a flash vessel, and the downstream pipe has a slight upward slope. The technician did not use ultrasonic listening or a contact probe, and did not record the cycle time.

1. Is the “failed open” conclusion supported by the temperature data? Explain the failure modes and the limitations of the measurement.

Read the worked answer

The conclusion is not supported. A hot downstream pipe on an inverted-bucket trap can be normal because the trap discharges condensate and flash steam in cycles; the downstream pipe remains hot for some distance after each discharge. The 120 °C reading is well below the 198 °C steam temperature, which is more consistent with flashing condensate than with live steam passing continuously. The second trap at 70 °C may be cycling differently, may have different insulation, or may be closer to the flash vessel. Surface temperature alone cannot distinguish failed open from normal cycling, a partially plugged orifice, or a trap that is cold because it is failed closed. Insulation gaps, pipe slope, and the flash vessel also affect the readings. The technician did not record cycle time, did not use ultrasonic or acoustic listening, and did not confirm with a contact probe. A failed-open diagnosis requires evidence of continuous flow, not just a warm pipe.

2. What additional tests should be performed, and how should they be interpreted together?

Read the worked answer

The technician should listen to the trap with an ultrasonic probe or stethoscope and record whether flow is continuous or cyclic. A normal inverted-bucket trap should have a distinct discharge cycle followed by a quiet period. Continuous rushing flow suggests failed open; no flow with a cold trap suggests failed closed or a blockage. The inlet and outlet temperatures should be measured with a contact probe at fixed points, and the cycle timing should be recorded over several minutes. The upstream strainer and bypass should be checked for temperature anomalies, and the downstream line should be inspected for insulation damage. The trap should be compared with a known-good trap of the same type and service, not just a parallel line. If the trap is cycling, has a normal acoustic pattern, and the downstream temperature fluctuates, it is probably functioning. If ultrasonic flow is continuous and the downstream temperature remains high between cycles, failed open is credible. Replacement should follow agreement of at least two independent indicators.

3. How should the report phrase the finding and the recommendation?

Read the worked answer

The report should state that the downstream temperature was elevated but that this alone does not confirm a failed-open trap. It should give the measured temperatures, distances, insulation condition, steam pressure, trap type, and the fact that the trap was cycling audibly. It should explicitly state that ultrasonic listening, contact temperature, and cycle-time data were not obtained, and that the diagnosis is therefore provisional. The recommendation should be to perform an acoustic and contact-temperature check before replacement, and to compare the trap with a known-good reference under similar load. If the client wants a priority list, the trap can be ranked for inspection, not condemned. The report should avoid language such as “failed open” unless supported by continuous-flow evidence. It should also note the flash vessel and pipe slope as factors affecting downstream temperature. This wording prevents unnecessary replacement and gives the maintenance team a clear verification step.