Question 1Project management concepts

In ITIL 4, which term describes the practice of ensuring that risks are properly assessed, that appropriate treatment is selected, and that residual risk is monitored?

  1. Service continuity management
  2. Change enablement
  3. Risk management Correct answer.
  4. Problem management

Explanation

Risk management is the practice of ensuring that uncertainty and its potential effects on services and projects are understood and treated. It covers identification, assessment, treatment selection and ongoing monitoring of residual risk.

Question 2Project management concepts

A project team is defining the boundaries of what the project will and will not deliver. Which project management concept are they establishing?

  1. Cost baseline
  2. Scope Correct answer.
  3. Quality register
  4. Resource plan

Explanation

Scope defines the boundaries of the product and the work needed to deliver it, including explicit exclusions. Clarifying what is out of scope protects against uncontrolled expansion of the work.

Question 3Project management concepts

Which ITIL 4 concept states that an organization is a complex system where components interact and cannot be understood in isolation?

  1. Systems thinking Correct answer.
  2. Service value chain
  3. Value stream
  4. Guiding principles

Explanation

Systems thinking is one of the four dimensions of service management, recognising that organizations are systems of interacting parts. Changes in one component produce effects elsewhere, so analysis must consider the whole.

Question 4Project management concepts

A sponsor asks a project manager to describe what success will look like and how it will be measured. Which document should the project manager produce?

  1. Communication plan
  2. Project brief
  3. Risk register
  4. Business case Correct answer.

Explanation

The business case justifies the investment and states the expected benefits, costs, risks and success criteria used to judge whether the project delivered value. It is the reference for measuring outcomes after delivery.

Question 5Project management concepts

Which combination of constraints is commonly used to describe the traditional project performance trade-off that a project manager must balance?

  1. Scope, time and cost Correct answer.
  2. People, process and technology
  3. Vision, mission and values
  4. Demand, capacity and utilization

Explanation

The classic trade-off balances scope against time and cost, with quality affected by how the three are combined. Adjusting one constraint normally requires compensating changes in at least one other.

Question 6Project management concepts

In ITIL 4, which activity of the service value chain is concerned with ensuring that products and services continually meet stakeholder expectations?

  1. Obtain/build
  2. Engage
  3. Deliver and support
  4. Improve Correct answer.

Explanation

The improve activity covers continual improvement of products, services and practices, including assessing whether they still meet stakeholder expectations. It feeds lessons and improvement opportunities back into the value chain.

Question 7Project management concepts

What is the primary purpose of a project manager establishing a RACI matrix for a project?

  1. To record the approved budget by work package
  2. To clarify who is responsible, accountable, consulted and informed for activities Correct answer.
  3. To schedule dependencies between project tasks
  4. To list the quality criteria for each deliverable

Explanation

A RACI matrix maps roles against activities so that each activity has one accountable owner and clearly assigned responsibility, consultation and information flows. This reduces ambiguity and duplicated effort in project governance.

Question 8Project management concepts

Which statement best describes how the ITIL 4 guiding principle 'progress iteratively with feedback' applies to project delivery?

  1. Delegate all decisions to the project board to avoid local variation
  2. Break work into smaller increments and use feedback to adjust the next increment Correct answer.
  3. Freeze requirements at the start so that feedback cannot change scope
  4. Deliver the entire solution in one release to minimise disruption

Explanation

The principle recommends organising work into smaller, manageable increments and using feedback from each increment to steer the next. This reduces risk and allows the solution to evolve as understanding improves.

Question 9Project management concepts

A project is delivering a new self-service portal. The project manager maps the sequence of activities from request capture through fulfilment to user confirmation. Which concept is being applied?

  1. Stakeholder analysis
  2. Capacity planning
  3. Cost-benefit analysis
  4. Value stream mapping Correct answer.

Explanation

Value stream mapping identifies the steps, handoffs and delays that transform demand into value for the consumer. Mapping the request-to-fulfilment flow exposes waste and improvement opportunities in the delivery path.

Question 10Project management concepts

During a project, the team discovers that a planned supplier component will arrive four weeks late, threatening the critical path. Which response is most consistent with effective risk treatment?

  1. Escalate the delay to the supplier's account manager only
  2. Extend the project end date without informing stakeholders
  3. Re-sequence dependent activities and evaluate an alternative component Correct answer.
  4. Record the delay in the issue log and continue as planned

Explanation

Treating a risk or issue means selecting a response that changes the likelihood or impact, such as re-sequencing work or sourcing an alternative. The chosen response should then be reflected in the plan and communicated to affected stakeholders.

Question 11Project management concepts

A project board wants assurance that the project remains justified as circumstances change. What should the project manager provide at each stage boundary?

  1. A resource histogram
  2. A service level agreement
  3. An updated business case Correct answer.
  4. A test completion report

Explanation

The business case is a living document that should be reviewed and refreshed at key decision points to confirm the investment is still justified. Stage boundaries are natural points to revalidate benefits, costs and risks before committing further funding.

Question 12Project management concepts

Which factor most strongly indicates that an Agile delivery approach suits a project better than a predictive approach?

  1. The regulatory environment mandates documented stage approvals
  2. The supplier contract fixes price against a fully specified scope
  3. The solution is novel and stakeholder needs are expected to evolve Correct answer.
  4. Requirements are well understood and unlikely to change

Explanation

Iterative and Agile approaches suit work where uncertainty is high and requirements will emerge through feedback. When the problem is novel and needs evolve, short cycles allow the team to learn and adapt before large investments are committed.

Question 13Project management concepts

In ITIL 4, what distinguishes an 'output' from an 'outcome' in the context of a project?

  1. An output is measured in money, while an outcome is measured in time
  2. An output is a benefit realized after closure, while an outcome is produced during delivery
  3. An output is a contractual obligation, while an outcome is an internal target
  4. An output is a tangible deliverable, while an outcome is a result or change experienced by stakeholders Correct answer.

Explanation

Outputs are the things a project produces, such as a new portal or a report, whereas outcomes are the effects those outputs create for the organization or its customers. Value is realized through outcomes, not through outputs alone.

Question 14Project management concepts

A project manager is planning how to engage a group of users who have high interest but low influence over a new service. Which engagement approach is most appropriate?

  1. Keep them informed and use their feedback to refine usability Correct answer.
  2. Ignore them until the service goes live
  3. Escalate every concern they raise to the project board
  4. Give them decision rights over the project budget

Explanation

Stakeholders with high interest but limited influence should be kept informed and consulted so their needs shape the solution without over-allocating decision authority. This maintains goodwill and improves adoption while preserving governance.

Question 15Project management concepts

Which statement correctly describes the relationship between a project, a programme and a portfolio?

  1. A project delivers defined outputs, a programme coordinates related projects for shared benefits, and a portfolio manages the overall investment mix Correct answer.
  2. A portfolio delivers a single product, a programme manages its stages, and a project governs the investment
  3. A project and a programme are synonyms, while a portfolio is a supplier category
  4. A programme is a temporary structure within a project, and a portfolio is a type of project team

Explanation

Projects are temporary endeavours producing defined outputs; programmes group related projects to achieve benefits that could not be realized individually; portfolios group programmes, projects and other work to optimise the overall investment. Each level has a distinct governance focus.

Question 16Project management concepts

A project manager wants to forecast the project's final cost using earned value data. Which formula expresses the estimate at completion when current cost performance is expected to continue?

  1. EAC = BAC / CPI Correct answer.
  2. EAC = EV / AC
  3. EAC = AC + (BAC - EV)
  4. EAC = PV - EV

Explanation

When the current cost performance is assumed to continue, the estimate at completion is the budget at completion divided by the cost performance index. This scales the original budget by the observed rate of spending efficiency.

Question 17Project management concepts

Which ITIL 4 dimension addresses the culture, roles and competences needed to deliver a project successfully?

  1. Partners and suppliers
  2. Information and technology
  3. Organizations and people Correct answer.
  4. Value streams and processes

Explanation

The organizations and people dimension covers structure, roles, responsibilities, culture and the skills required to deliver value. It recognises that technology and process alone cannot succeed without capable and motivated people.

Question 18Project management concepts

A project team is deciding how to control changes to the agreed scope during delivery. Which action best reflects good change enablement practice?

  1. Batch all changes and decide at project closure
  2. Assess each change for value, risk and impact before authorising it through the agreed authority Correct answer.
  3. Reject all changes after the design phase to protect the baseline
  4. Allow any team member to accept changes directly from users

Explanation

Change enablement ensures changes are assessed for value, risk and impact and authorised by the appropriate authority before implementation. This balances the need to respond to new requirements with protection of the agreed baseline.

Question 19Project management concepts

Which statement best explains why a project manager should define acceptance criteria for each deliverable?

  1. They identify which team member is accountable for the budget
  2. They specify the supplier payment schedule
  3. They replace the need for stakeholder engagement
  4. They provide an objective basis for confirming that the deliverable meets stakeholder requirements Correct answer.

Explanation

Acceptance criteria state the conditions a deliverable must satisfy to be accepted, giving an objective test of fitness for purpose. They reduce disputes at handover and align the team with stakeholder expectations.

Question 20Project management concepts

In ITIL 4, what is the main purpose of the 'engage' activity in the service value chain when applied to a project?

  1. To build and configure the components of the service
  2. To understand stakeholder needs and maintain good relationships throughout delivery Correct answer.
  3. To run day-to-day support for live services
  4. To ensure the project plan is approved by the finance team

Explanation

The engage activity covers understanding stakeholder needs, managing relationships and maintaining transparency across the value chain. In a project context it ensures requirements and expectations are captured and continuously aligned.

Question 21Project management concepts

A project has a cost performance index of 0.85 and a schedule performance index of 1.10. What does this combination indicate?

  1. The project is behind schedule and under budget
  2. The project is ahead of schedule and under budget
  3. The project is ahead of schedule but over budget Correct answer.
  4. The project is behind schedule and over budget

Explanation

A schedule performance index above 1.0 indicates more work has been earned than planned, so the project is ahead of schedule. A cost performance index below 1.0 indicates more has been spent than earned, so the project is over budget.

Question 22Project management concepts

A project manager is choosing how to estimate effort for a new project when little historical data exists and experts are available. Which technique is most appropriate?

  1. Analogous estimating using a single past project
  2. Three-point estimating using optimistic, most likely and pessimistic values Correct answer.
  3. Parametric estimating using a fixed unit rate
  4. Bottom-up estimating using a completed work breakdown structure

Explanation

Three-point estimating uses optimistic, most likely and pessimistic estimates to reflect uncertainty when historical data is limited. Expert judgement supplies the three values, and the weighted result gives a more realistic estimate than a single figure.

Question 23Project management concepts

Which statement best explains the difference between a risk and an issue in project management?

  1. A risk has already occurred, while an issue may occur in the future
  2. A risk is always negative, while an issue is always positive
  3. A risk is owned by the sponsor, while an issue is owned by the supplier
  4. A risk is an uncertain future event, while an issue is a problem that has already happened and needs resolution Correct answer.

Explanation

A risk is an uncertain event that may affect objectives if it occurs, whereas an issue is a problem that has already materialised and requires action. Risks are managed proactively; issues are resolved reactively.

Question 24Project management concepts

A project manager must decide whether to escalate a decision to the project board. Which consideration is most relevant to that decision?

  1. Whether the project manager personally agrees with the recommended option
  2. Whether the decision can be made more quickly by the team
  3. Whether the decision falls within the delegated authority and tolerance defined for the project manager Correct answer.
  4. Whether the supplier has already been informed of the situation

Explanation

Escalation should be driven by the delegation of authority and agreed tolerances; decisions outside those limits belong with the board. Decisions within tolerance should be taken at the appropriate level to maintain pace.

Question 25Project management concepts

An organization wants to reduce the risk of a large transformation by delivering it in increments while preserving formal investment control. Which approach best combines these needs?

  1. An ad hoc approach with decisions made as events arise
  2. A predictive lifecycle with a single final acceptance gate
  3. A pure Agile approach with no investment governance
  4. An iterative lifecycle with stage boundaries and continued business case review Correct answer.

Explanation

An iterative lifecycle delivers value in increments while stage boundaries and business case reviews preserve formal investment control. This combination allows learning and adaptation without losing accountability for spending.

Question 26Project management concepts

In ITIL 4 project management, which term describes the measurable, tangible result produced directly by a project activity, such as a completed design document or a deployed server?

  1. An output Correct answer.
  2. A benefit
  3. A value stream
  4. An outcome

Explanation

An output is the immediate, tangible result of an activity, such as a document or a configured component. Outcomes are the wider effects that the output enables for stakeholders, and benefits are the positive outcomes realized over time. Value streams describe the sequence of activities that create value, not a single deliverable.

Question 27Project management concepts

A project manager is defining the roles and responsibilities for a cross-functional project team. Which ITIL 4 dimension primarily addresses the authority structures, reporting lines, and decision rights needed for the project?

  1. The organizations and people dimension Correct answer.
  2. The information and technology dimension
  3. The partners and suppliers dimension
  4. The value streams and processes dimension

Explanation

The organizations and people dimension covers the structure of the organization, including roles, responsibilities, authority, and culture. Information and technology focuses on data and systems, partners and suppliers on external dependencies, and value streams and processes on workflows. Authority and decision rights therefore belong to the organizations and people dimension.

Question 28Project management concepts

A project manager is preparing a business case for a new service. Which statement best explains why the business case should be revisited at key decision points throughout the project?

  1. To satisfy the requirement that all projects follow a predictive lifecycle
  2. To provide a detailed record of every change request raised during the project
  3. To confirm that the project still aligns with organizational strategy and remains viable as assumptions change Correct answer.
  4. To calculate the earned value of the project at each reporting period

Explanation

A business case justifies the investment and should be reviewed at key decision points to ensure the project remains desirable, viable, and achievable as circumstances change. It is not a change log, a mandate for predictive delivery, or an earned value calculation. Keeping it current supports informed decisions to continue, adjust, or stop the project.

Question 29Project management concepts

A project manager is planning how to engage stakeholders for a project that will affect several departments. According to ITIL 4, what is the primary purpose of the 'engage' activity in the service value chain when applied to a project?

  1. To design and transition new services into the live environment
  2. To provide a good understanding of stakeholder needs and ensure continual engagement and transparency Correct answer.
  3. To plan and manage the project's resources and activities
  4. To ensure that all project deliverables are produced within the agreed budget

Explanation

The engage activity focuses on understanding stakeholder needs, maintaining relationships, and ensuring transparency and continual engagement. Designing and transitioning services belongs to the design and transition activity, while planning resources and activities relates to the plan activity. Budget control is a project management concern, not the primary purpose of engage.

Question 30Project management concepts

A project manager is selecting an estimation approach for a project with limited historical data and high uncertainty. Which technique is most appropriate for deriving an estimate by combining expert judgment with structured group consensus?

  1. Analogous estimating
  2. Bottom-up estimating
  3. The Delphi technique Correct answer.
  4. Parametric estimating

Explanation

The Delphi technique gathers expert opinions through multiple anonymous rounds to reach a consensus estimate, which is useful when historical data is scarce. Parametric and analogous estimating rely on historical data or relationships, and bottom-up estimating requires a detailed decomposition of work. Delphi therefore suits high-uncertainty situations where expert judgment must be structured.

Question 31Project management concepts

A project manager is deciding how to control changes to the agreed scope during delivery. Which action best reflects good change control practice in an ITIL 4 context?

  1. Approve all change requests to avoid delaying the project schedule
  2. Assess the impact of each change request on the project's value, risk, and constraints before approving or rejecting it Correct answer.
  3. Delegate all change decisions to the project team without documentation
  4. Reject all change requests after the project baseline has been set

Explanation

Good change control evaluates each change request for its impact on value, risk, cost, and schedule before a decision is made. Approving all changes undermines scope control, rejecting all changes ignores legitimate needs, and undocumented delegation removes accountability. The assessment step ensures changes are managed rather than simply allowed or blocked.

Question 32Project management concepts

A project manager is analyzing stakeholder engagement for a new service rollout. A group of users has high interest in the project but low influence over its decisions. Which engagement approach is most appropriate according to ITIL 4 stakeholder management principles?

  1. Involve them closely in decision-making and seek their approval for key changes
  2. Keep them informed and consult them to gather feedback and maintain support Correct answer.
  3. Monitor them with minimal communication to avoid distracting the project team
  4. Escalate all their concerns directly to the project board for resolution

Explanation

Stakeholders with high interest but low influence should be kept informed and consulted so they feel engaged and their feedback can be captured. Involving them in decision-making overstates their influence, while minimal communication risks losing their support. Escalating every concern to the board is disproportionate and bypasses normal engagement channels.

Question 33Project management concepts

A project manager is reviewing earned value data. The cost performance index (CPI) is 0.90 and the schedule performance index (SPI) is 0.85. Which interpretation of this combination is most accurate?

  1. The project is under budget and ahead of schedule
  2. The project is over budget and behind schedule Correct answer.
  3. The project is under budget but behind schedule
  4. The project is over budget but ahead of schedule

Explanation

A CPI below 1.0 indicates that costs are higher than planned for the work completed, meaning the project is over budget. An SPI below 1.0 indicates that less work has been completed than planned, meaning the project is behind schedule. Both indices below 1.0 therefore point to an over-budget and delayed project.

Question 34Project management concepts

An organization is planning a large transformation and wants to reduce risk by delivering it in increments while preserving formal governance. Which ITIL 4 concept best supports combining iterative delivery with oversight of outcomes?

  1. The guiding principle 'progress iteratively with feedback' applied within a governed value stream Correct answer.
  2. The guiding principle 'start where you are' applied by retaining all legacy processes unchanged
  3. The guiding principle 'optimize and automate' applied by automating every manual approval
  4. The guiding principle 'focus on value' applied by eliminating all governance checkpoints

Explanation

Progressing iteratively with feedback allows work to be delivered in small increments that can be adjusted based on feedback, while a governed value stream maintains oversight and control. Eliminating governance checkpoints or retaining legacy processes unchanged does not balance iteration with formal governance. Automating approvals does not by itself provide the iterative delivery and oversight described.

Question 35Project management practices and ITIL practices

Which ITIL 4 management practice is primarily responsible for ensuring that risks are identified, assessed, and managed across the service value chain?

  1. Service desk
  2. Capacity and performance management
  3. Incident management
  4. Risk management Correct answer.

Explanation

Risk management is the ITIL 4 practice that identifies, assesses, and controls risks, and it provides guidance that other practices use when making decisions. It is a distinct practice from operational practices such as incident management or the service desk.

Question 36Project management practices and ITIL practices

In ITIL 4, which practice owns the process of identifying, capturing, and prioritizing opportunities for improvement?

  1. Service level management
  2. Change enablement
  3. Continual improvement Correct answer.
  4. Problem management

Explanation

Continual improvement is the practice of aligning an organization's practices and services with changing business needs through ongoing identification and improvement of services, practices, and products. It provides the improvement register and prioritization logic.

Question 37Project management practices and ITIL practices

A project manager needs a single practice to formalize agreements with customers about what services will be delivered and at what measurable level. Which ITIL 4 practice fits best?

  1. Supplier management
  2. Service catalogue management
  3. Relationship management
  4. Service level management Correct answer.

Explanation

Service level management negotiates, agrees, and monitors service levels with customers, producing service level agreements and supporting service reviews. Supplier management and relationship management address different stakeholder groups and contracts.

Question 38Project management practices and ITIL practices

Which ITIL 4 practice is responsible for making new and changed services and products available for use?

  1. Change enablement
  2. Release management
  3. Deployment management Correct answer.
  4. Service configuration management

Explanation

Deployment management moves new or changed components, products, and services into live environments. Release management makes them available to users, which is a related but distinct responsibility.

Question 39Project management practices and ITIL practices

A team wants to define the sequence of activities and workflows used to deliver a service, including inputs, outputs, and controls. Which ITIL 4 practice provides this capability?

  1. Service value system
  2. Workforce and talent management
  3. Service design Correct answer.
  4. IT asset management

Explanation

Service design is the practice of designing products and services fit for purpose and use, including their workflows, interfaces, and controls. It addresses how a service is structured rather than who performs it or which assets support it.

Question 40Project management practices and ITIL practices

Which practice maintains reliable, accurate information about configuration items and their relationships throughout their lifecycle?

  1. Information security management
  2. Service configuration management Correct answer.
  3. IT asset management
  4. Monitoring and event management

Explanation

Service configuration management ensures that accurate and reliable information about configuration items and their relationships is available when and where it is needed. IT asset management is related but focuses on financial and lifecycle value of assets.

Question 41Project management practices and ITIL practices

During a project, a supplier repeatedly misses agreed delivery dates. Which ITIL 4 practice should the project manager use to address this with the supplier?

  1. Service level management
  2. Problem management
  3. Incident management
  4. Supplier management Correct answer.

Explanation

Supplier management manages the performance of suppliers and their contracts, ensuring they meet agreed obligations. Service level management deals with customer-facing targets, so supplier performance issues belong to supplier management.

Question 42Project management practices and ITIL practices

What is the primary purpose of the problem management practice in ITIL 4?

  1. To capture and categorize user requests for service
  2. To restore service as quickly as possible after an outage
  3. To authorize changes to the production environment
  4. To reduce the likelihood and impact of incidents by identifying actual and potential causes Correct answer.

Explanation

Problem management identifies actual and potential causes of incidents and manages workarounds and known errors to reduce likelihood and impact. Incident management restores service, while change enablement authorizes changes.

Question 43Project management practices and ITIL practices

Which ITIL 4 practice ensures that the organization has the right people with the right skills and knowledge in the right roles?

  1. Continual improvement
  2. Relationship management
  3. Service desk
  4. Workforce and talent management Correct answer.

Explanation

Workforce and talent management ensures the organization has the right people, skills, and knowledge to support its business objectives. It covers planning, recruitment, development, and retention.

Question 44Project management practices and ITIL practices

A project must ensure that changes to a critical service are assessed for risk and authorized before implementation. Which ITIL 4 practice should be applied?

  1. Deployment management
  2. Service validation and testing
  3. Release management
  4. Change enablement Correct answer.

Explanation

Change enablement maximizes successful changes by assessing risk, authorizing changes, and scheduling them. It provides the authorization control point before implementation.

Question 45Project management practices and ITIL practices

Which practice is responsible for planning and managing the full lifecycle of IT assets, including financial and contractual aspects?

  1. Capacity and performance management
  2. Service catalogue management
  3. IT asset management Correct answer.
  4. Service configuration management

Explanation

IT asset management plans and manages the lifecycle of IT assets, covering acquisition, financial control, and disposal. Service configuration management focuses on configuration items and relationships rather than financial value.

Question 46Project management practices and ITIL practices

Which practice provides a single point of contact between the service provider and users for capturing demand and handling communication?

  1. Service desk Correct answer.
  2. Service request management
  3. Relationship management
  4. Incident management

Explanation

The service desk is the single point of contact for users, capturing demand and communicating with users. Incident management and service request management use the service desk but are separate practices.

Question 47Project management practices and ITIL practices

A project team is defining how to measure whether a new service meets agreed targets and how to report performance to the customer. Which practice applies?

  1. Continual improvement
  2. Service level management Correct answer.
  3. Service financial management
  4. Measurement and reporting

Explanation

Service level management negotiates agreed service targets and manages service reviews and reporting against those targets. Measurement and reporting supports this but does not own the customer agreement.

Question 48Project management practices and ITIL practices

Which ITIL 4 practice focuses on protecting the confidentiality, integrity, and availability of information?

  1. Risk management
  2. Supplier management
  3. Change enablement
  4. Information security management Correct answer.

Explanation

Information security management protects the organization's information by ensuring confidentiality, integrity, and availability. Risk management is broader and does not specifically own information security controls.

Question 49Project management practices and ITIL practices

Which practice ensures that services and service components meet agreed capacity and performance requirements in a cost-effective way?

  1. Service continuity management
  2. Availability management
  3. Monitoring and event management
  4. Capacity and performance management Correct answer.

Explanation

Capacity and performance management ensures that services and components meet agreed capacity and performance requirements cost-effectively. Availability management focuses on uptime and continuity rather than capacity.

Question 50Project management practices and ITIL practices

A project requires a structured way to record and manage user requests such as access provisioning and information queries. Which practice should be used?

  1. Problem management
  2. Service request management Correct answer.
  3. Incident management
  4. Change enablement

Explanation

Service request management supports the agreed quality of a service by handling pre-defined, user-initiated requests. Incidents are unplanned disruptions, and changes require authorization rather than request fulfillment.