Drilling Well Control - Core Facts and Rules

  • Hydrostatic pressure: HP (psi) = 0.052 × mud weight (ppg) × true vertical depth (ft). Use TVD, never measured depth, for pressure calculations.

  • Formation pressure is balanced when mud hydrostatic pressure equals pore pressure; overbalance means HP exceeds pore pressure, underbalance means HP is less and influx can enter.

  • Kill mud weight (ppg) = current mud weight + (SIDPP ÷ (0.052 × TVD)). SIDPP is shut-in drill pipe pressure read after stabilization.

  • Slow circulating rate pressure (SCR) is recorded with the bit off bottom at a low pump rate; it is the reference for all kill-sheet pressure calculations.

  • Initial circulating pressure (ICP) = SIDPP + SCR. Final circulating pressure (FCP) = kill mud weight ÷ old mud weight × SCR.

  • MAASP = (formation fracture pressure equivalent − current mud weight) × 0.052 × shoe TVD; it is the maximum surface pressure allowed with the well shut in.

  • Shut-in procedure: stop rotation, lift string off bottom, stop pumps, close BOP, then read and record SIDPP and SITP once pressures stabilize.

  • Kick indicators while drilling: flow with pumps off, pit volume gain, increase in flow rate or pump pressure drop, gas or oil shows, and reduced drill rate.

  • BOP stack components: annular preventer for stripping and closing on any shape, pipe rams for specific pipe sizes, blind/shear rams to close the open hole and shear pipe, and choke manifold for controlled flow.

Quick reference

Well Intervention Pressure Control - Core Facts and Rules

  • Well intervention workover operations must maintain two independent barriers at all times; a single barrier is never acceptable during intervention.

  • Wireline lubricator length must exceed the maximum length of the toolstring so the tools can be fully housed before the well is opened.

  • Snubbing is used when wellbore pressure would push the pipe out of the hole; stripping is moving pipe through the BOP with pressure contained but not requiring snubbing force.

  • Coiled tubing fatigue is tracked by accumulated bending cycles; the string is retired when remaining life reaches the operator's limit.

  • Bullheading pumps fluid into the formation to displace wellbore fluids; it is used when circulation is impossible or when killing a gas well with a safe formation.

  • BOP test frequency for intervention: function test weekly, pressure test at specified intervals (commonly 14 or 21 days depending on operator policy) and after any seal repair.

  • Kill fluid density for intervention = current density + (SITHP ÷ (0.052 × TVD)); SITHP is shut-in tubing head pressure.

  • Hydraulic workover units use slips and a traveling snubbing jack to move pipe under pressure; the BOP stack must be rated above the maximum anticipated surface pressure.

  • Pressure testing of lubricator and intervention stack is done to the lower of MAASP or the rated working pressure of the weakest component.