IWCF Level 2 Drilling study materials
IWCF Level 2 Drilling study resources

IWCF Level 2 Drilling study plan

IWCF Level 2 Drilling · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Drilling Well Control

  • Define primary well control, kick, influx, and blowout in your own words and distinguish a kick from a simple loss of hydrostatic overbalance.

  • List the primary barrier envelope for an onshore and an offshore well and identify at least three failure paths that lead to an influx.

  • Calculate formation pressure from mud weight and true vertical depth, and convert between pressure gradient (psi/ft), mud weight (ppg), and equivalent mud weight (EMW).

  • Explain the difference between pore pressure, fracture pressure, and overburden gradient and sketch them on a depth plot from memory.

Your checkpoint

A one-page handwritten formula and definition sheet covering hydrostatic pressure, EMW, gradients, and pore/fracture/overburden relationships, solved against three self-made numbers.

Week 2

Drilling Well Control

  • Describe the sequence of events during a kick: underbalance, influx entry, shut-in, and pressure stabilisation, and state what each pressure gauge should read at each stage.

  • Calculate slow circulating rate (SCR) pressures and explain why they are taken at a low pump rate.

  • Compute kill mud weight from shut-in drill pipe pressure (SIDPP) and true vertical depth, and verify the result against the fracture gradient.

  • Explain the U-tube model and use it to predict shut-in casing pressure from shut-in drill pipe pressure plus influx hydrostatic.

Your checkpoint

A worked kick sheet: given SIDPP, SICP, TVD, current mud weight, and pump rate, produce kill mud weight, initial and final circulating pressures, and a labelled pressure-versus-time sketch.

Week 3

Drilling Well Control

  • Compare the driller's method and the wait-and-weight method step by step, including when each is preferred and what stays constant in each.

  • Trace the pressure schedule for both methods and identify where bottomhole pressure is held constant and where it is not.

  • Calculate the kill-mud displacement schedule and state the pressure to hold at each stage (start of kill, kill mud at bit, kill mud at surface).

  • Identify at least four warning signs of a kick (flow check, pit gain, pump pressure change, gas cut mud) and rank their reliability.

Your checkpoint

A side-by-side comparison table of the driller's method and wait-and-weight method with pressure steps, timing, and three advantages and disadvantages each.

Week 4

Drilling Well Control

  • Explain the function of the BOP stack components: annular preventer, pipe rams, blind/shear rams, choke manifold, and choke and kill lines.

  • Describe a function test and a pressure test of the BOP stack and state typical test pressures and acceptance criteria relative to rated working pressure.

  • Explain the purpose of the accumulator and state the minimum usable volume and response-time requirement for closing and opening.

  • Walk through the correct shut-in procedure for a floating and a land rig and identify the common procedural errors that mask a kick.

Your checkpoint

A labelled BOP stack diagram drawn from memory with a written shut-in checklist of at least ten sequential steps, including the flow check.

Week 5

Drilling Well Control & Well Intervention Pressure Control

  • Complete a timed set of 20 mixed well-control calculations (EMW, MAASP, kill weight, SCR, lag) with at least 90 percent accuracy.

  • Explain MAASP and how it changes after a kill mud weight increase, and calculate the new MAASP.

  • Define the scope of well intervention pressure control: wireline, coiled tubing, and snubbing operations and how each maintains a barrier.

  • Identify the pressure control equipment for wireline: grease injection head, lubricator, stuffing box, and BOP, and state the function of each.

Your checkpoint

A timed 20-question calculation set scored and corrected, with every wrong answer rewritten correctly and the error cause noted.

Week 6

Well Intervention Pressure Control

  • Describe the two-barrier philosophy for well intervention and list the primary and secondary barriers for a wireline operation.

  • Explain lubricator and riser pressure ratings and how to calculate the maximum allowable surface pressure for a given intervention.

  • Describe how to calculate and control wireline tension, including the weight indicator reading and the effect of buoyancy.

  • Explain the procedures for pressure testing intervention equipment and the acceptance criteria for a successful test.

Your checkpoint

A written two-barrier analysis for a wireline entry into a live well, naming each barrier, its failure mode, and the verification step for each.

Week 7

Well Intervention Pressure Control

  • Explain coiled tubing pressure control: stripper, BOP stack, and the role of the circulating system in maintaining balance.

  • Describe snubbing operations and how the snubbing unit holds pressure while running pipe in or out of a live well.

  • Explain the hazard of gas migration in a shut-in well during intervention and describe at least two mitigation methods.

  • Describe emergency procedures for loss of primary barrier during wireline and coiled tubing operations, including shear and disconnect sequences.

Your checkpoint

A one-page emergency response flowchart for loss of well control during a coiled tubing or wireline operation, with decision points and actions at each.

Week 8

Drilling Well Control & Well Intervention Pressure Control

  • Complete a full-length timed mock exam covering both domains and score it against the pass threshold you have set.

  • Review every missed question and map it to the underlying concept, not the wording of the question.

  • Re-derive the ten most-used formulas from memory without notes.

  • State the key differences and shared principles between drilling well control and intervention pressure control in a short written summary.

Your checkpoint

A scored mock exam with a written remediation list of no more than ten weak concepts, each with a one-line corrective action.

Milestones

Week 2: Solve five EMW, hydrostatic, and kill-weight problems in 15 minutes with no formula sheet and score at least 4 of 5.

Week 4: Explain the driller's method and the BOP stack from memory to a study partner or on a voice recording for 10 minutes without notes, and pass a 15-question self-quiz at 80 percent or better.

Week 6: Score at least 85 percent on a 25-question mixed set covering Domain 1 calculations and Domain 2 barrier concepts.

Week 8: Score at least the target pass mark on the full timed mock exam and confirm the remediation list is closed out.