IWCF Level 2 Drilling study plan
IWCF Level 2 Drilling · Give each week a clear focus.
8 weeks · About 6 hours per week
Drilling Well Control
Define primary well control, kick, influx, and blowout in your own words and distinguish a kick from a simple loss of hydrostatic overbalance.
List the primary barrier envelope for an onshore and an offshore well and identify at least three failure paths that lead to an influx.
Calculate formation pressure from mud weight and true vertical depth, and convert between pressure gradient (psi/ft), mud weight (ppg), and equivalent mud weight (EMW).
Explain the difference between pore pressure, fracture pressure, and overburden gradient and sketch them on a depth plot from memory.
Your checkpoint
A one-page handwritten formula and definition sheet covering hydrostatic pressure, EMW, gradients, and pore/fracture/overburden relationships, solved against three self-made numbers.
Drilling Well Control
Describe the sequence of events during a kick: underbalance, influx entry, shut-in, and pressure stabilisation, and state what each pressure gauge should read at each stage.
Calculate slow circulating rate (SCR) pressures and explain why they are taken at a low pump rate.
Compute kill mud weight from shut-in drill pipe pressure (SIDPP) and true vertical depth, and verify the result against the fracture gradient.
Explain the U-tube model and use it to predict shut-in casing pressure from shut-in drill pipe pressure plus influx hydrostatic.
Your checkpoint
A worked kick sheet: given SIDPP, SICP, TVD, current mud weight, and pump rate, produce kill mud weight, initial and final circulating pressures, and a labelled pressure-versus-time sketch.
Drilling Well Control
Compare the driller's method and the wait-and-weight method step by step, including when each is preferred and what stays constant in each.
Trace the pressure schedule for both methods and identify where bottomhole pressure is held constant and where it is not.
Calculate the kill-mud displacement schedule and state the pressure to hold at each stage (start of kill, kill mud at bit, kill mud at surface).
Identify at least four warning signs of a kick (flow check, pit gain, pump pressure change, gas cut mud) and rank their reliability.
Your checkpoint
A side-by-side comparison table of the driller's method and wait-and-weight method with pressure steps, timing, and three advantages and disadvantages each.
Drilling Well Control
Explain the function of the BOP stack components: annular preventer, pipe rams, blind/shear rams, choke manifold, and choke and kill lines.
Describe a function test and a pressure test of the BOP stack and state typical test pressures and acceptance criteria relative to rated working pressure.
Explain the purpose of the accumulator and state the minimum usable volume and response-time requirement for closing and opening.
Walk through the correct shut-in procedure for a floating and a land rig and identify the common procedural errors that mask a kick.
Your checkpoint
A labelled BOP stack diagram drawn from memory with a written shut-in checklist of at least ten sequential steps, including the flow check.
Drilling Well Control & Well Intervention Pressure Control
Complete a timed set of 20 mixed well-control calculations (EMW, MAASP, kill weight, SCR, lag) with at least 90 percent accuracy.
Explain MAASP and how it changes after a kill mud weight increase, and calculate the new MAASP.
Define the scope of well intervention pressure control: wireline, coiled tubing, and snubbing operations and how each maintains a barrier.
Identify the pressure control equipment for wireline: grease injection head, lubricator, stuffing box, and BOP, and state the function of each.
Your checkpoint
A timed 20-question calculation set scored and corrected, with every wrong answer rewritten correctly and the error cause noted.
Well Intervention Pressure Control
Describe the two-barrier philosophy for well intervention and list the primary and secondary barriers for a wireline operation.
Explain lubricator and riser pressure ratings and how to calculate the maximum allowable surface pressure for a given intervention.
Describe how to calculate and control wireline tension, including the weight indicator reading and the effect of buoyancy.
Explain the procedures for pressure testing intervention equipment and the acceptance criteria for a successful test.
Your checkpoint
A written two-barrier analysis for a wireline entry into a live well, naming each barrier, its failure mode, and the verification step for each.
Well Intervention Pressure Control
Explain coiled tubing pressure control: stripper, BOP stack, and the role of the circulating system in maintaining balance.
Describe snubbing operations and how the snubbing unit holds pressure while running pipe in or out of a live well.
Explain the hazard of gas migration in a shut-in well during intervention and describe at least two mitigation methods.
Describe emergency procedures for loss of primary barrier during wireline and coiled tubing operations, including shear and disconnect sequences.
Your checkpoint
A one-page emergency response flowchart for loss of well control during a coiled tubing or wireline operation, with decision points and actions at each.
Drilling Well Control & Well Intervention Pressure Control
Complete a full-length timed mock exam covering both domains and score it against the pass threshold you have set.
Review every missed question and map it to the underlying concept, not the wording of the question.
Re-derive the ten most-used formulas from memory without notes.
State the key differences and shared principles between drilling well control and intervention pressure control in a short written summary.
Your checkpoint
A scored mock exam with a written remediation list of no more than ten weak concepts, each with a one-line corrective action.
Milestones
Week 2: Solve five EMW, hydrostatic, and kill-weight problems in 15 minutes with no formula sheet and score at least 4 of 5.
Week 4: Explain the driller's method and the BOP stack from memory to a study partner or on a voice recording for 10 minutes without notes, and pass a 15-question self-quiz at 80 percent or better.
Week 6: Score at least 85 percent on a 25-question mixed set covering Domain 1 calculations and Domain 2 barrier concepts.
Week 8: Score at least the target pass mark on the full timed mock exam and confirm the remediation list is closed out.