Systems Auditor Examination study materials
Systems Auditor Examination study resources

Systems Auditor Examination cheat sheet

Systems Auditor Examination · Keep the key ideas within reach.

Quick reference

Information Systems Auditing Process

  • Audit risk = inherent risk × control risk × detection risk; the auditor controls only detection risk, so higher reliance on substantive testing lowers detection risk and raises audit effort.

  • Risk-based auditing prioritizes the areas of highest residual risk (inherent × control) so that scarce audit resources target the greatest exposure.

  • Audit evidence is ranked by reliability: auditor's own observation and inspection > externally sourced documents > internally generated documents > oral representations from management.

  • Sampling: attribute sampling tests a rate of deviation (compliance); variables sampling estimates a monetary amount (substantive); stop-or-go and discovery sampling are attribute variants.

  • Sampling risk is the risk that the sample is not representative; non-sampling risk covers human error, wrong procedures, and misinterpretation, and is reduced by good planning and supervision.

  • Materiality is set at planning and drives the nature, timing, and extent of procedures; lower materiality thresholds increase sample sizes.

  • The audit trail must let an auditor reconstruct each transaction from origination to financial reporting; missing trails are a reportable control deficiency.

  • ISACA audit standards and guidelines require that audit objectives, scope, and criteria be documented in an engagement letter before fieldwork begins.

  • A finding is written as condition, criteria, cause, effect, and recommendation; the recommendation is the only element the auditor proposes as a change.

Quick reference

Governance & Management of IT

  • IT governance is the responsibility of the board and executive management; it sets direction, monitors performance, and ensures IT sustains and extends enterprise strategy.

  • COSO has five components (control environment, risk assessment, control activities, information and communication, monitoring) and 17 principles; COBIT is the IT-specific framework that operationalizes them.

  • COBIT separates governance from management: governance domains are EDM (evaluate, direct, monitor); management domains are APO, BAI, DSS, and MEA.

  • Segregation of duties requires that no single person can initiate, authorize, record, and reconcile a transaction; conflicting duties include custody of assets versus recordkeeping.

  • The three lines model: management owns controls (first line), risk and compliance functions monitor (second), internal audit provides independent assurance (third).

  • A key performance indicator measures achievement of a goal; a key risk indicator signals rising exposure; key goal indicators measure whether IT delivered business value.

  • An IT steering committee with business and IT representation prioritizes projects, allocates resources, and resolves conflicts; it is a governance control, not a technical one.

  • Policies are mandatory management intent; standards are specific mandatory requirements; procedures are step-by-step instructions; guidelines are recommended, non-mandatory practices.

Quick reference

Information Systems Acquisition, Development & Implementation

  • SDLC phases: feasibility/requirements, design, development, testing, implementation, post-implementation review; the auditor should be involved from requirements onward, not only at go-live.

  • The business case must include measurable benefits, costs, risks, and alternatives; approval by the steering committee and business owner precedes funding.

  • Testing hierarchy: unit (developer), integration (interfaces), system (end-to-end), UAT (business users), regression (no broken existing function), and parallel or pilot conversion before cutover.

  • Segregation in development: developers must not have production access; migration of code to production is performed by an independent party using approved change tickets.

  • Change management controls: documented request, impact and risk assessment, approval by an authorized owner, testing evidence, backout plan, and post-implementation verification.

  • Data conversion risks are completeness, accuracy, and reconciliation of opening balances; totals must be reconciled from legacy to new system and signed off.

  • Agile delivery shifts control emphasis to sprint reviews, definition of done, automated testing, and continuous backlog prioritization; audit evidence becomes sprint artifacts and CI/CD logs.

  • A post-implementation review (PIR) verifies that promised benefits were realized and identifies lessons learned; absence of a PIR is a project governance gap.

Quick reference

Information Systems Operations & Business Resilience

  • Recovery metrics: RTO is the maximum tolerable downtime; RPO is the maximum tolerable data loss measured in time; MTD is the point of unacceptable business impact.

  • Backup generations follow the grandfather-father-son rotation; a full backup plus incremental (since last backup) or differential (since last full) sets the restore chain.

  • The restore test, not the backup job, is the control that proves recoverability; untested backups are unverified assumptions.

  • A hot site is fully equipped and near-immediate; warm site is partially equipped; cold site provides space and power only; mirrored sites provide zero or near-zero data loss.

  • Capacity and performance monitoring uses thresholds and trend analysis; a baseline compared to current utilization identifies degradation before service impact.

  • Job scheduling controls include authorization of schedule changes, exception reporting for abended jobs, and review of console logs; unmonitored failed jobs can corrupt downstream data.

  • Incident management follows detection, classification, containment, eradication, recovery, and lessons learned; problem management addresses root cause.

  • BCP addresses business processes and people; DRP addresses technology recovery; both must be tested at least annually with results reported to management.

Quick reference

Protection of Information Assets

  • The CIA triad: confidentiality (authorized disclosure only), integrity (accuracy and completeness), availability (timely access); controls are classified as preventive, detective, or corrective.

  • Access control models: DAC (owner discretion), MAC (labels and clearance), RBAC (role-based, least privilege), ABAC (attributes and policy).

  • Authentication factors: something you know, have, or are; multi-factor authentication requires at least two different factor types, not two instances of the same type.

  • Encryption: symmetric (AES) is fast and used for bulk data but requires key distribution; asymmetric (RSA, ECC) solves key exchange and enables digital signatures.

  • A digital signature provides integrity, authentication, and non-repudiation but not confidentiality; a hash alone provides integrity only.

  • PKI trust: a certificate binds a public key to an identity and is validated by checking the chain to a trusted root CA, validity dates, and revocation status (CRL or OCSP).

  • Defense in depth layers controls across network (firewalls, segmentation), host (hardening, EDR), application (input validation, secure coding), and data (encryption, DLP).

  • Physical controls include perimeter barriers, badge access with anti-passback, CCTV, environmental sensors, and visitor escorts; logical controls never compensate for an unsecured facility.