Systems Auditor Examination flashcards
Systems Auditor Examination · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Detection risk
- The risk that audit procedures fail to detect a material error or control weakness that exists. The auditor reduces it by increasing sample sizes, using more reliable evidence, or performing substantive tests.
- Attribute sampling
- A statistical sampling method that estimates the rate at which a control deviation occurs in a population. It supports compliance testing conclusions, not the estimation of monetary misstatement amounts.
- Audit finding structure
- A finding states the condition observed, the criteria it violates, the cause, the effect or risk, and a recommendation. The recommendation is the auditor's proposed corrective action for management to accept or reject.
- Materiality
- The threshold above which an omission or misstatement could influence decisions of report users. It is set during planning and determines the nature, timing, and extent of audit procedures.
- Audit evidence reliability hierarchy
- Evidence obtained directly by the auditor is most reliable, followed by external evidence, internal evidence, and oral representations. Documentary evidence generally outweighs verbal assertions from management.
- Walk-through
- Tracing one or a few transactions through the entire process to confirm the auditor's understanding of the control flow. It validates design understanding, not operating effectiveness over a period.
- IT governance definition
- The board and executive responsibility for setting IT direction, aligning IT with enterprise strategy, monitoring performance, and ensuring risks are managed. It is distinct from day-to-day IT management.
- COSO five components
- Control environment, risk assessment, control activities, information and communication, and monitoring activities. These components underpin the 17 principles used to assess internal control over financial reporting.
- COBIT domains
- EDM is the governance domain (evaluate, direct, monitor). APO, BAI, DSS, and MEA are management domains covering align-plan-organize, build-acquire-implement, deliver-service-support, and monitor-evaluate-assess.
- Segregation of duties
- Dividing incompatible duties so no single person can initiate, authorize, record, and reconcile a transaction. Custody of assets is separated from recordkeeping and from authorization to prevent concealment of errors or fraud.
- Three lines model
- Operational management owns and manages risk as the first line. A risk and compliance function monitors as the second line. Internal audit provides independent assurance as the third line.
- Key risk indicator
- A metric that signals increasing exposure to a risk before loss occurs, such as rising failed login attempts or aging change tickets. It differs from a KPI, which measures goal achievement.
- Policy versus standard versus procedure
- A policy states mandatory management intent. A standard specifies mandatory technical requirements. A procedure gives step-by-step instructions. Guidelines are recommended but optional practices.
- IT steering committee role
- A governance body of business and IT leaders that prioritizes IT investments, allocates resources, resolves cross-functional conflicts, and monitors project and service performance against agreed objectives.
- User acceptance testing
- Testing performed by business users with realistic data to confirm the system meets documented requirements and is fit for purpose. It precedes final sign-off and production cutover.
- Separation of development and production
- Developers should not have write access to production. An independent party migrates approved code using change tickets, preventing unauthorized or untested code from reaching live systems.
- Change management controls
- Documented request, impact and risk assessment, authorized approval, testing evidence, backout plan, and post-implementation verification. Emergency changes require retrospective review after the fact.
- Parallel conversion
- Running the legacy and new systems simultaneously for a period and reconciling outputs. It reduces cutover risk but is costly, so pilot or phased conversion is often preferred.
- Post-implementation review
- A structured assessment after go-live confirming that promised benefits were realized, costs were controlled, and lessons were captured. Its absence is a project governance weakness.
- Data conversion reconciliation
- Comparing record counts, control totals, and opening balances between legacy and new systems and obtaining business sign-off. It addresses completeness and accuracy risks during migration.
- Regression testing
- Retesting existing functionality after a change to confirm nothing previously working has broken. It is essential for changes to shared code, interfaces, or database structures.
- Recovery time objective
- The maximum acceptable time to restore a service after disruption. It drives the choice of recovery site and is set by the business, not by IT alone.
- Recovery point objective
- The maximum tolerable data loss expressed in time, determined by backup or replication frequency. An RPO of one hour means backups or replication must occur at least hourly.
- Backup rotation generations
- Grandfather-father-son rotation keeps daily, weekly, and monthly copies offsite. Restoring requires the latest full backup plus all subsequent incremental or differential sets in the chain.
- Hot, warm, and cold sites
- A hot site is fully equipped for immediate takeover, a warm site is partially equipped, and a cold site provides only space and power. Cost and recovery time trade off against each other.
- Maximum tolerable downtime
- The longest time a business process can be unavailable before unacceptable impact occurs. The MTD constrains the RTO, which must be shorter than the MTD.
- Job scheduling exception reporting
- Automated alerts when scheduled jobs fail or overrun, plus review of console logs. Without it, failed jobs silently corrupt downstream data and reports.
- Business continuity versus disaster recovery
- Business continuity planning addresses processes, people, and facilities. Disaster recovery planning addresses technology and data restoration. Both require periodic testing with documented results.
- Role-based access control
- Permissions are assigned to roles rather than individuals, and users are placed in roles. It supports least privilege and simplifies provisioning, review, and termination of access.
- Digital signature properties
- A signature created with the sender's private key provides integrity, sender authentication, and non-repudiation. It does not provide confidentiality, which requires encryption of the content.
- Symmetric versus asymmetric encryption
- Symmetric algorithms such as AES are fast and used for bulk data but need secure key distribution. Asymmetric algorithms such as RSA and ECC ease key exchange and enable signatures.
- Certificate revocation checking
- Validating that a certificate has not been revoked before its expiry, using a certificate revocation list or the online certificate status protocol. It complements chain validation to a trusted root.