BORAQS Architect Exam flashcards
BORAQS Architect Exam · Build recall with a focused review session.
33 cards. Read the term and the definition here. The deck at the top of this page is optional.
- BORAQS statutory mandate
- Kenyan board established under the Architects and Quantity Surveyors Act (Cap 525) that registers architects and quantity surveyors, regulates practice, and enforces discipline over registered professionals.
- Development permission
- Approval under physical and land use planning law from the county, confirming the proposed use, plot coverage, plot ratio and setbacks comply before construction may lawfully begin.
- Certificate of occupation
- Local authority certificate issued after inspection confirming a completed building complies with approved plans and is fit for occupation; occupation before issue is an offence.
- Plot ratio
- Total gross floor area of all buildings on a plot divided by the plot area; it caps built density and is checked together with coverage and height limits at planning approval.
- Plot coverage
- Footprint area of buildings expressed as a percentage of the plot area; it controls how much of the site is built on and therefore the open space retained.
- Travel distance
- Maximum measured route length from any point to the nearest exit; exceeding it requires additional protected exits, and single-direction travel is limited to roughly 18–22 m.
- Fire compartmentation
- Division of a building by fire-resisting walls and floors, typically 30–120 minutes rated, to limit fire spread, sized by use and height with protected escape stairs.
- 2R + G rule
- Design check relating riser and going: twice the riser plus the going should fall between about 550 mm and 700 mm for comfortable, safe stair climbing.
- Accessible ramp gradient
- Maximum permitted slope for wheelchair routes is generally 1:12, preferably 1:15, with level landings at intervals and handrails on both sides.
- Architect's instruction
- Written direction from the architect to the contractor under the building contract; it is the mechanism for variations, and oral directions must be confirmed in writing.
- Practical completion
- Stage when works are complete except for minor defects and snagging, the building is fit for purpose, and the defects liability period and retention release begin.
- Interim certificate
- Architect's periodic certificate stating the amount due to the contractor for work executed, less retention and previous payments, issued within the contract time limit.
- Professional indemnity cover
- Insurance protecting the architect against claims for negligent design or professional advice, usually maintained for the limitation period after project completion.
- Site supervision duty
- Architect's obligation to visit and inspect works at intervals appropriate to the stage, issue instructions, and report non-compliance; it is not continuous inspection nor a guarantee of quality.
- Building contract types
- Standard forms such as lump sum with quantities, lump sum without quantities, measurement/remeasurement, and cost-plus; the choice fixes how risk and price adjustment are allocated.
- Bill of quantities
- Itemised document measuring and describing work with rates and amounts, forming the priced basis of tenders, interim valuations, variation pricing and the final account.
- Approximate quantities estimate
- Costing method using measured approximate quantities of major elements multiplied by unit rates, giving greater accuracy than a single rate per square metre.
- Elemental cost plan
- Design-stage estimate grouping costs by building element (substructure, frame, finishes, services) with element unit rates, allowing cost targets to be set and checked per element.
- Location factor
- Multiplier applied to a benchmark building rate to reflect regional differences in labour, material and transport costs when transferring rates between places.
- Price index adjustment
- Updating a historical cost by multiplying by current index divided by base index, converting tender-date prices to the cost level of the estimate date.
- Rebar mass formula
- Mass per metre of reinforcement in kg/m equals the bar diameter squared divided by 162, so a 12 mm bar weighs about 0.888 kg per metre.
- Formwork measurement
- Measured in square metres of concrete contact area, excluding surfaces not requiring temporary support, and priced separately from concrete volume.
- Retention deduction
- Percentage withheld from each interim certificate, commonly 5–10%, until a cap near 5% of the contract sum is reached; half released at practical completion.
- Performance security
- Bond or guarantee, typically 10% of the contract sum, callable by the employer if the contractor fails to perform, and reduced on practical completion.
- Advance payment bond
- Guarantee securing repayment of a mobilisation advance if the contractor defaults, usually for the full advance amount and reducing as the advance is recovered.
- Variation valuation order
- Price changed work at a similar BoQ rate first, then a rate derived pro rata from BoQ rates, and only otherwise by fair valuation of cost plus overhead and profit.
- Dayworks
- Method of paying for unmeasurable or minor work using recorded labour hours, plant time and materials at pre-agreed rates plus a stated percentage addition.
- Fluctuation formula
- Price adjustment P = A + b(Ln/Lo) + c(Mn/Mo) plus further terms, where A is fixed and the coefficients sum to one, adjusting for labour and material index changes.
- Loss and expense
- Amount paid to the contractor for direct loss caused by employer risk events such as late possession or deferred instructions, assessed and certified separately from contract works value.
- Cost performance index
- Earned value divided by actual cost; a value below one means work is costing more than budgeted and signals an adverse cost variance to investigate.
- Schedule performance index
- Earned value divided by planned value; below one indicates progress is behind schedule, informing forecasts of completion date and time-related preliminaries cost.
- Final account
- Settlement statement comprising contract sum, remeasured adjustments, variations, provisional sum actuals, fluctuations and claims, less retention and previous payments.
- Provisional sum
- Allowance in the contract for work that cannot be fully defined at tender; it is expended only on instruction and adjusted to actual cost in the final account.